RE: Planning Permission, Production30 Jul 2018 09:05
Lol Harts zzzzz..... you will note the words production, produced...
production
prəˈdʌkʃ(ə)n/Submit
noun
1.
the action of making or manufacturing from components or raw materials, or the process of being so manufactured.
produce
verb
past tense: produced; past participle: produced
prəˈdjuːs/Submit
1.
make or manufacture from components or raw materials
As no recent production data is available on the Kimmeridge reservoir, the appraisal works are considered important by the applicant to confirm how the reservoir performs. The well will therefore be subject to more extensive technical evaluation than normal production wells. It is initially planned that the well will be produced for a period of up to eighteen months, during which time the bottom hole and surface pressures will be continually monitored and the results of downhole surveys analysed. Following approximately twelve months of data gathering and detailed study, the applicant envisages that the operator will have sufficient information to issue a report to the OGA detailing the results of the appraisal, including an estimate of the resource present. Further appraisal will be dependent upon the results of these initial works and, if required, further data gathering will be undertaken.
Alan summed it up perfectly it’s like a new car being on a production line and has to be tested before its sent out end of story...