RE: He1 Current Unknowns15 Mar 2024 16:04
Thanks oilinsider, very informative.
"The following are not currently in the public domain (unless I have missed it), the company will know the answer to many of these. As we get the answers the share price will become less speculative and less volatile.
• What is the size of the recoverable reserves ??? MMCF
• What flow rate can be achieved from each well? The Q3 2024 Extended Well Test should answer this.
• How many extraction wells will be required to achieve an economic gas production?
• Do wells need artificial lift to attain the desired flow rates now, or in the future as the reservoir depressurises?
• Is there a liquefaction facility available, or will this have to be built?
• What will the overall future project capital cost be (1) ? x Extraction Wells at $6 million each (2) Processing plant $50 million perhaps (3) Pipelines (4) Liquefaction plant?
• How much of the potential capital costs and infrastructure can be shared with other producers to lower the He1 costs per MCF?
• Cost of the ongoing extraction per MCF?
• Cost of the transportation and liquefaction per MCF?
• Cost of international shipping per MCF?
• What will the sales price per MCF be?