RE: If Chariot was a movie what would it be.....19 May 2022 11:38
Danno,
As per the RNS;
"The Board is looking to advance the Front End Engineering Design ('FEED') project to reach the Final Investment Decision ('FID') as quickly as possible, whilst progressing the development of the wider portfolio.
Development plans
Given the high quality and consistent nature of the gas composition, production from all reservoirs can potentially be processed through a single facility which would enable a simple development that utilises conventional technology. The Anchois wells are also favourably located near to onshore existing gas infrastructure which facilitates the subsea to shore development. The development plan from a pre-FEED study consists of two initial subsea wells tied into a subsea manifold with a 40km offshore flowline connected to an onshore gas processing facility. From here, a short 40km pipeline will connect to the trunk pipeline to Europe, which provides access not only to the growing Moroccan energy market but also to the European gas market. Chariot is collaborating with Subsea Integration Alliance, a developer of offshore gas projects, to progress development plans, Front-end design, engineering, procurement, construction, installation and operation of the Anchois Gas Development."