Tar Sands Article26 Oct 2021 16:02
When you fully read this article on the Tar Sands update, look at Petroteq price rise, then I don’t think we going to be this low SP next month
In August 2021 TomCo took full control of Greenfield following the completion of testing at Petroteq’s oil sands plant, the receipt of a finalised FEED study and ahead of the planned acquisition of the Tar Sands Holdings II site in Utah, USA.
On 26 August 2021 TomCo announced an agreement reached with Valkor LLC (“Valkor”) to acquire Valkor’s 50% of Greenfield and TomCo now owns 100% of Greenfield, with full control, thereby affording TomCo’s shareholders the opportunity to fully benefit from Greenfield’s significant potential, whilst retaining Valkor as a valued stakeholder and planned substantial shareholder in the Company.
This followed the successful completion of all of the planned trial work utilising Petroteq Energy Inc.’s existing oil sands plant at Asphalt Ridge, Utah (the “POSP”), as announced on 2 July 2021, the commencement of requisite due diligence on Tar Sands Holdings II LLC (“TSHII”) and its site as announced on 9 June 2021 and the receipt of the finalised FEED (Front-End Engineering and Design) study for production facilities, together with the associated third-party technical verification report on the proposed process, as announced on 27 July 2021.
TSHII owns approximately 760 acres of land and certain non-producing assets (the “Site”) in Uintah County, Utah, USA. Subject to securing the requisite funding and satisfactory due diligence, Greenfield plans to use the Site, if ultimately acquired via TSHII, for the future mining of oil sands and construction of a commercial scale processing plant utilising the findings of the FEED study, and other knowledge and experience gained from Greenfield’s operation of the POSP. The Site has existing infrastructure, plant and equipment, together with an existing Large Mine Permit No. M0470032, that could facilitate any future development by Greenfield.
The FEED study covers the production facilities for a 5,000 barrels of oil per day (“bopd”) oil sands project (the “Greenfield Plant”). The Greenfield Plant is currently intended to be located at the Site. The proposed plant is planned to consist of an initial 5,000 bopd train but configured for possible expansion to 10,000 bopd via a second future train