RE: ASD-1X spudd25 Feb 2021 20:06
It was a month from signing the rig contract to Spud ASH-3 , so I'm guessing towards the end of March for spud. EGPC /Egypt Govt owns/controls just about everything from the drill rigs to all the infrastructure, so they will have everything in place beforehand IMO.
Looking forward to them cracking on with it, it's already stated there's space in the rig contract for an extra two drills this campaign too.