I think that Angus are producing the minimum flow rates until the Hedge reduces 1st April to coincide with the ST coming on line. So we have a 6 month window to get the extra gas at the market price on top of the other unhedged production to reduce the loan imo.
I like this part of the RNS " The 2nd compressor is installed, commissioned and will be running through March. Keep an eye on the production levels imo!