In detail BOD say, how's about telling us how much of the original 200 meter perfs we are going to use what is the pressure, was there oil shows during the latest workover, tell it as it is no bullshit just the truth.
They would know what the score is before they put the tree on.The pressure would have changed once the water was plugged.Come on get that Rig down let's be having you.
Not saying we will get that straight away.We will get a spike if the Oil flows people will bail out.Then a steady rise each day till we get to Balcombe, then the world's your oyster.
Look back at all my posts in here and on UKOG.You will find I told people what I was doing with my trades,got called quite a few names on Twitter for doing it but in here now on a free carry with 1 million shares.Not bright he says takes all sorts does it not.
Water plugged.BOP gone.Christmas tree on the wellhead,waiting for Rig to go out then flare stack and heater arrive.And off we go, where to I do not know but I hope it is what we have all been waiting for.
At the moment they are just considering the gas field nothing concrete is it.I am sure they will look closely at what it might cost to bring it back on line.
Yes, the BOP is part of the rig equipment and a very expensive one too. It is removed after running the completion string. If in the future an intervention would be required another BOP would be installed for the duration of that intervention and would itself be subsequently removed.