The loading of SMP-102 rig is complete in Port Gentil, the vessel has moved off the port pending clearance to leave for Pointe Noire #AAOG #AIM https://t.co/fVekHnSM87
Operators license Mcap Balcombe horizontal well to be flowtested, 1st horizontal well to be flowtested in Weald Basin Internal calculations flowrates of 2500bopd+