Looking on this, with no knowledge of what it means, it appears that SFB is making supplies to the grid.
System Entry Calorific Value, Saltfleetby , D+2 40.3400 Value is above 40 ince 4.09, if only I knew what it meant other than a stability.
Hoping there are knowledgeable people contributing.
dyor imho
Kind of busy atm.
I mentioned the numbers just because they are stable, all the values for the past three days.
Haven’t the knowledge to interpret the meaning.
The sp has plummeted today and I cannot see a reason other than FUD or manipulation.
Good entry price on a cert.
IMHO
Just looked at flow rates for today, nothing to panic about.
Steady calorific value count.
RNS would help but given recent appointments, connection to the grid and other assets I’ll hold.
Bear in mind this opened over .3
imho dyor good luck
Looking on the https://gasdata.nationalgrid.com/InstantaneousView
which are the 'favourable flow rates?
'Instantaneous Flows (mcm/day)
MILFORD HAVEN - DRAGON 13.51
EASINGTON LANGELED 42.80'
What figure would we expect/hope for SFB
The Joule Thomson Systems, also known as a JT skid or a JT plant, simultaneously reduces the water dew point of gas, recovers valuable hydrocarbon liquids, and lowers the BTU (British Thermal Unit) of the gas stream to sales contract specifications or levels suited for high-speed engines.
That’s the skid explained, what’s the next step, proceed to sales or further H&S tests?
Exciting times.
With all hydrotesting and the bulk of nitrogen (leak and integrity) testing complete, we will now proceed to test skids individually for communication with the central computer system and function testing of all control elements.
What will be the next step?
Export pipeline pressured with National Grid Gas. #angs https://angusenergy.co.uk/wp-content/uploads/2022/07/Progress-Update-at-Saltfleetby.pdf
Contractors are working toward a target date for first flow of well-head gas through the plant during the week commencing 20 June 2022 with first export (i.e. sales) nominations the week following. Angus looks forward to providing updates via Twitter, Linked-In and RNS Reach on detailed progress through the remainder of the commissioning sequence
The Company is also pleased to announce that it has concluded all preparatory risk assessment and planning for the forthcoming side-track at Saltfleetby and has advised suppliers of a spud date for drilling of 21 July 2022.