Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSO4.L Share News (SO4)

  • There is currently no data for SO4

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Salt Lake Potash upbeat on 'outstanding' pilot plant results

Wed, 18th Sep 2019 15:14

(Sharecast News) - Salt Lake Potash has completed the pilot plant test work of the Lake Way salts at the Saskatchewan Research Council, it announced on Wednesday, with the test work yielding a premium sulphate of potash (SOP) product that was "highly water soluble" with a 53% potassium oxide grade.
The AIM-traded company said SRC had completed a pilot plant operation intended to be representative of the proposed Lake Way Project process flowsheet.

It said the pilot plant operation included the addition of potassium chloride, to take advantage of the excess sulphate that naturally occured within the Lake Way brine.

SRC completed two separate pilot plant runs, utilising five tonnes of salt harvested from Lake Way site evaporation trials, producing "premium grade, highly water soluble" SOP.

The total solubility and dissolution rate indicated that the product would be suitable for application in drip irrigation, or 'fertigation', systems, the board said.

It explained that the pilot plant runs successfully confirmed that high quality soluble SOP could be generated via the process flowsheet with the inclusion of potassium chloride.

The board said that importantly, the positive results of the inclusion of the potassium chloride within the process flowsheet would provide "significant benefits" to the Lake Way Project by increasing the SOP output from an equivalent volume of Lake Way brine.

That could be achieved without significant changes to the processing equipment, and no material additional capital expenditure.

Salt Lake Potash said the "outstanding" results achieved from the pilot plant indicated that the product was comparable with other premium grade soluble products on the market, and supported its marketing strategy to supply into the premium SOP market.

The premium achievable for soluble grade SOP could be up to 20% above the standard pricing, the board claimed.

It said the process flowsheet that had been developed and confirmed as part of the pilot plant test work was incorporated in the Lake Way bankable feasibility study, which was scheduled for completion in early October.

"The outstanding results from the pilot plant testwork confirm the addition of potassium chloride into the process will enable Salt Lake Potash to utilise the excess sulphate within the Lake Way brine to produce additional premium grade SOP," said chief executive officer Tony Swiericzuk.

"This is a significant outcome for the company and will strengthen the already compelling economics for the Lake Way Project.

"We are focussed on finalising the bankable feasibility study, which will reflect the pilot plant results and confirm the excellent potential of Lake Way."
More News
10 Aug 2016 11:17

Salt Lake Potash posts promising test results at Lake Wells

(ShareCast News) - Salt Lake Potash advised the market of the results of a comprehensive geophysical survey at Lake Wells on Wednesday, as well as "outstanding" initial test pumping results of brine from the Lake Wells paleochannel. The AIM-traded company said the results "substantially enhance" the

Read more
10 Aug 2016 08:09

Salt Lake Potash Says Surveys And Tests Reinforce Lake Wells Potential

Read more
12 May 2016 10:09

Salt Lake Potash Sees "Excellent" Initial Pump Results At Lake Wells

Read more
29 Apr 2016 10:32

Salt Lake Potash Progresses Lake Wells, Appoints Syme As CEO

Read more
19 Apr 2016 09:15

Salt Lake Potash Eyeing Adding Lake Irwin To Lake Wells Plans

Read more
24 Mar 2016 14:14

Salt Lake Potash placement raises more than £4m

(ShareCast News) - Salt Lake Potash had a bit more cash in its back pocket than it expected on Thursday, having received enough subscriptions to increase its Australian placement announced on Wednesday to AUD 8.38m (£4.46m), from AUD 5.2m. The AIM-traded firm said proceeds from the placement would b

Read more
24 Mar 2016 10:25

Salt Lake Potash Increases Placing Proceeds Up To AUD8.4 Million (ALLISS)

Read more
11 Mar 2016 15:55

Salt Lake Potash Loss Widens After Ramping Up Exploration Work

Read more
29 Jan 2016 15:13

Salt Lake Potash excited by Lake Wells prospects

(ShareCast News) - Salt Lake Potash was looking forward with excitement on Friday, over the prospects of its Lake Wells Project in Western Australia. The AIM-quoted company said that its primary focus during the three months to 31 December 2015 was the advancement of the Lake Wells Project, to confi

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.