(Adds company not replying)
HOUSTON, June 21 (Reuters) - The second stage of the
hydrocracker is shut at Shell’s 227,400-barrel-per-day
(bpd) Norco, Louisiana, refinery, two sources familiar with
plant operations said on Monday.
Shell did not reply to a request for comment.
The second stage on the 40,000-bpd hydrocracker shut down on
Friday, the sources said. The first stage of the hydrocracker
continues to operate.
(Reporting by Erwin Seba; editing by Barbara Lewis and Jonathan
Oatis)