Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America. Watch the video here.

Less Ads, More Data, More Tools Register for FREE
George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’
George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’View Video
Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America
Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin AmericaView Video

Latest Share Chat

Pin to quick picksRDSA.L Share News (RDSA)

  • There is currently no data for RDSA

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

RPT-INSIGHT-Kashagan oil field: Stuck between "a widow maker" and "a rotating bomb"

Thu, 03rd Apr 2014 06:02

(Repeats story unchanged)

* Kilometres of Kashagan pipelines defective-sources

* Could be cheaper to replace onshore section

* Project costing around $45 mln a day in lost revenues

* Kazakhstan raises pressure with $737 mln fine

By Oleg Vukmanovic and Stephen Jewkes

MILAN, April 2 (Reuters) - Western oil majors struggling torestart production at one of the world's biggest offshoreoilfields in Kazakhstan have found that whole kilometres ofpipeline are defective, two people recently returned from the$50 billion project say.

Replacing the damaged section altogether may be a better betthan trying to repair it.

Oil company investigators have yet to announce conclusionsabout what went wrong at Kashagan in October, when onshore pipescarrying corrosive gases sprang leaks and brought offshoreproduction in the Caspian Sea to a halt a month after start-up.

Yet early accounts of findings collected from engineering,banking and industry sources, some of whom have just returnedfrom the site, reveal that the scope of technical faults maydelay oil flows longer than expected.

The project has presented huge engineering challengesthroughout the 13 years since work began. Much of it is built onartificial islands to avoid damage from pack ice in a shallowsea that freezes for five months a year.

The oil is 4,200 metres (4,590 yards) below the seabed atvery high pressure, and the associated gas reaching the surfaceis mixed with some of the highest concentrations of toxic,metal-eating hydrogen sulphide (H2S) ever encountered.

It has now emerged that sulphur-laden sour gas burped outfrom the oil field during production last year may have weakenedlong stretches of processing pipelines, two sources said.

"The problem goes on for kilometre after kilometre, it's asystemic problem," an industry source briefed by Kashaganengineers told Reuters.

That defective stretch of pipeline runs mainly throughhard-to-reach swampy terrain, making intervention costly anddifficult.

A banker briefed by management of one of the companiesinvolved in engineering work said he was told the best course ofaction could instead be to lay a new line alongside the old one.

"It is cheaper to build a new parallel line than to pull upand repair the old one," the banker said.

A Kashagan consortium spokesman declined to comment beyondsaying that no decision has yet been taken on the pipelinerehabilitation plan. At the same time it delayed the release ofits final results into the pipeline investigation to thesecond-quarter.

COMPRESSORS

Problems with an inspection robot designed to help detectwhat is wrong were not helping, another source, who makesfrequent trips to Kashagan, said, and compressors designed tokeep the oil flowing were causing extra headaches.

Two compressors are known among the thousands of workers onKashagan as "the widow maker" and "the rotating bomb",nicknames, a consortium spokesman pointed out, which refer notto unsafe working conditions but to the complexity of the kit.

Output remains stuck at zero despite initial projections of180,000 barrels per day in the early phase of productionbuild-up on a field that aims to produce 1.66 million barrels aday at peak - as much as OPEC member Angola.

According to Reuters calculations, by mid-year, lost revenueis likely to amount to between $4 billion and $12 billion.

A second engineer associated with the project said theconsortium's decision to keep the pipelines outside in harshconditions may have stripped away their corrosion-resistantcoating, rendering them more vulnerable to leaks.

"The storage was the problem, the pipes were left in thedesert for too many months and this altered the coating of thepipes," the source, a specialist in inner-tube coatings onKashagan said.

The consortium over-estimated the acidity of the sour gaswhen they built and treated the pipelines, the source added, "soit can't have been a problem of estimating the content of acid".

Another source with one of the Kashagan stakeholders alsosaid that the span of pipeline under scrutiny is kilometreslong, with coatings at the heart of the problem.

The consortium said only that toxic gas lay behind theproblem. "Sulphur stress cracking was identified as the rootcause of the pipeline issues," the spokesman said. "This processoccurs if steel of high hardness is exposed to highconcentrations of H2S (hydrogen sulphide) under high pressure inthe presence of water," the spokesman said.

"This mechanism is not at all related to normal corrosion(formation of rust) but solely to the hardness of the steel".

Last month, infuriated Kazakh officials slapped a $737million ecological damage fine on the consortium, which includesEni, Exxon Mobil, Royal Dutch Shell,Total, and Kazakh state-run KazMunaiGas.

The penalty is the strongest signal to date from Kazakhstanthat it is running out of patience, while the consortium'sdecision to fight the fine could raise tensions with agovernment grown more assertive with foreign investors.

The consortium, which was meant to start its first output 10years ago, has already seen KazMunaiGas taking a large stake inthe project last decade following previous delays that angeredthe government.

A repeat of that scenario together with the state's possiblerefusal to pay a chunk of development costs are the main threatsto the group just as the restart date remains deeply uncertain.

"The project stopped production as a result of pipelineissues with the hydrocarbons coming onshore," Shell's chieffinancial officer Simon Henry said last month.

"All the partners have contributed their technical expertiseto look at how this challenge of running the pipelines can beaddressed. There is no decision yet about how best to do this orwhen production can be restarted," he added.

"DRAGGING ON"

Kazakh officials have said they have no plans to nationalisethe project so far and say they hope it could restart in thesecond half of 2014 and produce 22 million barrels of crude bythe end of the year.

Up to now, Kashagan has missed out on around $2.7 billion inoil revenue, a fact likely to cast a shadow over statedecision-making.

The contractual terms stipulate the government may refuse toreimburse the costs, potentially the entire $50 billion bill, ifthe consortium misses the final deadline. That was set by thestate as October 2013.

The Kashagan spokesman said that output had in fact brieflyreached commercial levels, as written in the contract, of 75,000bpd before its shutdown, but not for long enough to count.

A nine-month delay from September 2013 to July 2014 willcost the consortium at least $12 billion of lost oil revenuesbased on full scale output of 450,000 barrels per day.

Even if minimal output levels of 150,000 bpd are taken intoaccount, lost revenues would still be a hefty $4 billion,according to Reuters calculations.^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ For a graphic on Kashagan - http://link.reuters.com/pen92v ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

"It's dragging on. Everyone's losing money, big money, andso they all want to get on with it. But there are technicalproblems," said a source just back from Kashagan.

For its part, the central Asian state urgently needsproduction revenues to hit its fiscal targets for 2014, based onprojected cash inflows from Kashagan at up to three percent ofgross domestic product.

Past oil project delays have been seized upon by thegovernment as a chance to levy hefty fines and boost its shareof future production revenues.

Unfortunately for everyone involved, the best way ofdefusing rising stakeholder tensions hangs on oil companycontractors getting to grips with the sweep and complexity ofthe project's engineering challenges.

But smooth operation at the current juncture looks largelyout of reach.

Efforts to contain equipment breakdowns offshore has givenrise to black humour among the ranks of engineers.

An engineer with one of the western oil companies involvedin Kashagan who recently returned from the site said technicalbreakdowns on production-critical equipment keep workersjuggling priorities.

Particularly singled out for complaint are the platform'stwo main compressors, designed to keep oil flowing bymaintaining reservoir pressure and stripping out the gascomponent of oil production.

"They're a mess...we call one 'the widow maker' and theother 'the rotating bomb'," said the engineer. "That's how wetell them apart when assigning work orders," he said.

Furthermore an inspection robot, called a PIG, sent to scanthe inside of Kashagan's pipelines for data and clues is sendingback patchy data.

"The problem is the PIG has a 60 percent reliability rate."the first source just back from Kashagan said. "Its not like anX-ray. It's like a blurred X-ray."

(Additional reporting by Dmitry Solovyov in Almaty and DmitryZhdannikov in London; editing by Philippa Fletcher)

More News
27 Oct 2022 07:30

Shell announces $4bn share buyback as Q3 profits beat expectations

(Sharecast News) - Oil giant Shell announced a $4bn share buyback on Thursday as it posted better-than-expected third-quarter profits.

Read more
21 Apr 2022 11:53

Shell turning to China to offload Russian business - report

(Sharecast News) - Shell is reportedly looking to China as it looks to offload its Russian business.

Read more
15 Feb 2022 15:54

Shell preparing to sell North Sea gas fields - report

(Sharecast News) - Shell is reportedly preparing to launch the sale of its stakes in two clusters of gas fields in the southern British North Sea, part of an ongoing retreat of long-time producers from the ageing basin.

Read more
7 Feb 2022 10:52

Berenberg nudges up target price on Shell

(Sharecast News) - Analysts at Berenberg slightly raised their target price on oil and gas giant Shell from 2,350.0p to 2,375.0p on Monday, stating the firm was "on a roll".

Read more
31 Jan 2022 10:53

TOP NEWS SUMMARY: Shell and BHP share unifications go into effect

TOP NEWS SUMMARY: Shell and BHP share unifications go into effect

Read more
31 Jan 2022 07:48

LONDON MARKET PRE-OPEN: WeBuyAnyCar owner buys into Lookers

LONDON MARKET PRE-OPEN: WeBuyAnyCar owner buys into Lookers

Read more
28 Jan 2022 11:25

Shell's renewables boss steps down after less than two years

* Elisabeth Brinton leaves for new role, she says* Shell creates two new renewables leadership roles* Thomas Brostrøm to head renewables generation* Steve Hill to head energy marketingBy Ron BoussoLONDON, Jan 28 (Reuters) - Shell's head of renewable...

Read more
27 Jan 2022 16:14

UK earnings, trading statements calendar - next 7 days

UK earnings, trading statements calendar - next 7 days

Read more
26 Jan 2022 17:02

LONDON MARKET CLOSE: FTSE 100 soars ahead of Fed as oil, travel gain

LONDON MARKET CLOSE: FTSE 100 soars ahead of Fed as oil, travel gain

Read more
26 Jan 2022 14:36

China's Sinopec awards fewer cargoes in recent LNG tender

By Chen Aizhu and Marwa RashadSINGAPORE/LONDON, Jan 26 (Reuters) - Unipec, the oil and gas trading arm of China's Sinopec Corp has awarded fewer-than-planned cargoes in a recent tender to sell up to 45 cargoes of liquefied natural gas for 2022 del...

Read more
26 Jan 2022 12:16

LONDON MARKET MIDDAY: Markets brace for aggressive US Fed tightening

LONDON MARKET MIDDAY: Markets brace for aggressive US Fed tightening

Read more
26 Jan 2022 09:33

UPDATE 2-Commodity, bank stocks lead FTSE 100 higher; Playtech drops

* Oil and banking shares top gainers* Wizz Air reports Q3 loss, expects improvement in spring* FTSE 100 up 1.3%, FTSE 250 add 1.1% (Updates to market close)By Shashank Nayar and Ambar WarrickJan 26 (Reuters) - London's FTSE 100 rose on Wednesday wit...

Read more
26 Jan 2022 09:12

LONDON MARKET OPEN: Fresnillo drops on 2022 production warning

LONDON MARKET OPEN: Fresnillo drops on 2022 production warning

Read more
25 Jan 2022 21:13

UPDATE 1-U.S. awards 13 mln barrel exchange of crude from strategic reserve

(Adds details on sale, background on 50 million barrel SPR plan)WASHINGTON, Jan 25 (Reuters) - The U.S. Department of Energy said on Tuesday it had approved an exchange of 13.4 million barrels of crude oil from the Strategic Petroleum Reserve to ...

Read more
25 Jan 2022 20:10

U.S. awards exchange of 13 mln barrels of crude from strategic reserve

WASHINGTON, Jan 25 (Reuters) - The U.S. Department of Energy said on Tuesday it had approved an exchange of 13.4 million barrels of crude oil from the Strategic Petroleum Reserve to seven companies.The companies are Shell Trading US, 4.2 million ...

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.