Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Share News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.40
High: 1.50
Low: 1.40
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Anglesey Mining Parys Mountain Report Shows Larger Tonnage Available

Thu, 05th Sep 2019 16:42

(Alliance News) - Anglesey Mining PLC said Thursday the project development and cooperation agreement signed with QME Mining Technical Services in 2018 has shown a larger tonnage of material could be available for mining at the Parys Mountain zinc, copper lead project.

Shares in Anglesey Mining closed 17% higher in London on Thursday at 2.04 pence each.

The miner also said Non-Executive Director David Lean is retiring from the firm after serving as a director for nearly 18 years. He will not stand for re-election at the company's upcoming annual general meeting.

Irish-based firm QME is conducting the optimisation study of Parys Mountain, and is currently in the second stage of the study.

"This second stage of the QME exercise is ongoing with completion scheduled for the end of 2019. Subject to financing being available, this work would then form the basis for commissioning an updated scoping or preliminary feasibility study," Anglesey said.

QME's study is building off the work of a 2017 scoping study.

That report showed a 7.0 million tonne indicated resource at a USD0 per tonne operating cost cut-off grade. At an estimated USD80 per tonne cut off, the report estimated 2.1 million tonnes. A further USD60 per tonne cut off grade showed similar levels of resources.

On Thursday, however, Anglesey, said when applying a USD48 per tonne cut off grade a "larger tonnage of material could be available for mining".

The QME work suggests 6.9 million tonnes would be available in Parys Mountain, "substantially higher" than the 2.1 million tonnes previously reported.

Anglesey continued: "Applying a 10% dilution and 98% recovery, would result in some 7.3 million tonnes being available for conversion into 'potentially mineable tonnage' within the current global resource in all categories."

"As a further refinement, QME also looked at mining criteria and developing potential stoping blocks within this 7.3 million 'potentially mineable tonnage' and in doing so eliminated some material not located in economically mineable locations. Based on these assumptions approximately 5.25 million tonnes in situ would fall within these designed stoping blocks," the company added.

Using the lower cut-off grade, Anglesey said the life of the mine could be increased to 18 years from the initial eight years indicated in 2017.

"However, it does have to be noted that by reducing the cut-off, the grade of material that would be delivered to the mill would be lower overall than that used in the 2017 scoping study," said Anglesey.

The miner added: "The economic trade-off between a longer mine life and reduced head-grade will need to be further studied to determine what, if any, would be the net financial benefit. It will then likely require further studies to determine if there is an 'optimum' cut-off grade that maximises the financial returns."

More News
12 Nov 2021 21:15

IN BRIEF: Losses balloon at Anglesey Mining on rising costs

IN BRIEF: Losses balloon at Anglesey Mining on rising costs

Read more
22 Oct 2021 14:18

EXECUTIVE CHANGES: GB Group adds former Pearson English chief to board

EXECUTIVE CHANGES: GB Group adds former Pearson English chief to board

Read more
20 Oct 2021 13:32

IN BRIEF: Anglesey to start drilling at Parys Mountain in November

IN BRIEF: Anglesey to start drilling at Parys Mountain in November

Read more
8 Oct 2021 21:43

IN BRIEF: Anglesey Mining completes placing to fund Sweden projects

IN BRIEF: Anglesey Mining completes placing to fund Sweden projects

Read more
23 Sep 2021 16:03

UK shareholder meetings calendar - next 7 days

UK shareholder meetings calendar - next 7 days

Read more
8 Sep 2021 12:26

IN BRIEF: Anglesey Mining pretax loss widens, pushes Parys project

IN BRIEF: Anglesey Mining pretax loss widens, pushes Parys project

Read more
3 Sep 2021 16:22

IN BRIEF: Anglesey Mining loss widens, looks at funding options

IN BRIEF: Anglesey Mining loss widens, looks at funding options

Read more
29 Jul 2021 17:10

EXECUTIVE CHANGES: HL CFO to depart; Novacyt hires CEO from Amryt

EXECUTIVE CHANGES: HL CFO to depart; Novacyt hires CEO from Amryt

Read more
22 Jan 2021 09:53

Anglesey Mining To Raise GBP660,000 To Further Develop Parys Mountain

Anglesey Mining To Raise GBP660,000 To Further Develop Parys Mountain

Read more
12 Jan 2021 07:03

IN BRIEF: Anglesey Mining Reports Potential Profit At Parys Project

IN BRIEF: Anglesey Mining Reports Potential Profit At Parys Project

Read more
14 Dec 2020 17:47

UK EARNINGS SUMMARY: Schroder AsiaPacific Outperforms Benchmark

UK EARNINGS SUMMARY: Schroder AsiaPacific Outperforms Benchmark

Read more
23 Oct 2020 16:04

UK Shareholder Meetings Calendar - Next 7 Days

UK Shareholder Meetings Calendar - Next 7 Days

Read more
23 Sep 2020 16:13

UK Shareholder Meetings Calendar - Next 7 Days

UK Shareholder Meetings Calendar - Next 7 Days

Read more
24 Aug 2020 14:24

IN BRIEF: Anglesey Mining Raises GBP200,000 For Parys Mountain Work

IN BRIEF: Anglesey Mining Raises GBP200,000 For Parys Mountain Work

Read more
13 Dec 2019 12:03

Anglesey Mining Interim Loss Widens; To Require Further Funding

Anglesey Mining Interim Loss Widens; To Require Further Funding

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.