RE: Kpi’s10 May 2024 17:13
Brightfuture,
I'd say that was very conservative.
There's 33 weeks and 5 days to year end. AFC can build multiple systems side by side on the production line, so I'd expect an average of more than 1 per week to be rolling off the line.
I want to see:
30+ Generators on site with Speedy
'Up to' 5 delivered to TAMGO and then sign agreements with TAMGO that they assemble them at their own factory. They don't need more than 5 to sign that deal off. More supplied to TAMGO as they build out their Assembly Lines.
200kW completed, delivered to ABB, short validation and field trial, big order placed for multiple systems, significantly more than the 9 they get a discount on. They have been waiting a long time for it and no doubt have a lot of clients they have talked to about it lined up waiting to see it.
Delivery of Acciona 50kVa system, short validation and field trial, big order placed as they have a huge number of projects globally to use them on.
EU Hire Company agreement
EU Systems Assembly agreement
USA Hire Company agreement
USA/Canada Systems Assembly agreement
Possibly Far East Systems Assembly, most likely Japan
Far East Hire Company agreement, most likely Japan
Ammonia Cracker containerised and off out for site trials.
Smaller Ammonia Cracker system(s) (as shown on presentations) finished first build
Ammonia Cracker deals with big Ammonia producers and clients ahead of sales in early 2025.
Active deliveries of Hydrogen from the AFC Energy Hydrogen trailer.
And a lot more.