Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWeatherly International Plc Regulatory News (WTI)

Share Price Information for Weatherly International Plc (WTI)

Share Price is delayed by 15 minutes
Get Live Data
22.255    -0.2525 (-1.14%)
Bid:
21.87
Ask:
21.96
Spread: 0.09 (0.412%)
Market Cap: -
WTI Live PriceLast checked at - London Stock Exchange

Intraday Weatherly International Plc Share Chart

Tschudi Production Update

6 Apr 2017 07:00

RNS Number : 7262B
Weatherly International PLC
06 April 2017
 

6th April 2017

Weatherly International plc

("Weatherly" or "the Company")

 Tschudi Production Update

 

Weatherly International plc (AIM: WTI) provides the following update for copper cathode production during the March 2017 quarter.

 

Summary

 

· Reduced production for the March 2017 quarter with 3,236 tonnes produced, 24% below nameplate.

· Slower than anticipated leach rates for mixed oxide / sulphide ore stacked during latter parts of 2016 and early 2017 were achieved, reducing the amount of copper harvested.

· Above average seasonal rains during the quarter prevented short-term acceleration of mining and stacking to compensate.

· Revised production guidance of 14,500 to 15,000 tonnes of cathode for the financial year ending June 2017.

 

Tschudi Production Update

 

As the open pits have progressed deeper, the proportion of mixed oxide / sulphide ore mined has increased as expected. This mixed ore was expected to leach more slowly than oxide ore, and the mining and stacking schedules were designed to accommodate this.

 

Slower than expected recoveries from ore stacked in late 2016 resulted in a need to accelerate stacking rates to compensate, but unfortunately this coincided with above average rainfall which caused operational delays that were typically 2 to 3 times longer than those experienced in previous years' rainy seasons.

 

As a result, Tschudi was unable to further accelerate stacking rates to compensate and instead of producing at above nameplate rates to recover more of the shortfall from the September 2016 Quarter as scheduled, production rates fell to 24% below nameplate at 3,236 tonnes, with the greatest impact felt in March.

 

As rain delays reduced through March the rate of stacking contained copper metal improved notably and these improved rates of stacking copper are expected to be sustained going forward. The rate of leaching is expected to recover during the June quarter and full year production to June 2017 is now forecast to be 14,500 to 15,000 tonnes.

 

As an additional response to the slower leaching of mixed ore, a greater pad area is required to maximise recovery of copper prior to over-stacking and therefore the construction of the stage 2 heap leach pad extension commenced in March.

 

Mining schedules will continue to ensure sufficient stockpiled ore is available even when future rainy seasons are above average.

 

Further information will be provided with the regular quarterly operations and production update, planned for publication on 27 April 2017.

 

Weatherly has previously advised that if copper prices remain at current levels it is unlikely that the Company and its subsidiaries will generate sufficient surplus cash to meet all loan repayments when due. This remains the case and the Company continues to positively engage with Orion on the subject. 

 

For further information please contact:

 

Weatherly International plc +44 (0) 1707 800 774

Craig Thomas, Chief Executive Officer

Kevin Ellis, CFO and Company Secretary

 

RFC Ambrian Limited +44 (0) 20 3440 6800

(Nominated Adviser & Broker)

Nominated adviser contact: Stephen Allen / Bhavesh Patel

Broker contact: Kim Eckhof

 

Blytheweigh +44 (0) 20 7138 3204

(Financial PR) Tim Blythe / Camilla Horsfall / Nick Elwes

 

About Weatherly

 

Weatherly is an AIM listed copper mining company operating in Namibia in southern Africa. Its principal assets are one operating open pit copper mine called Tschudi and two underground copper projects called Otjihase and Matchless.

 

These assets will enable Weatherly to achieve its medium term goal of establishing a mining business capable of sustaining approximately 30,000 tonnes per annum of copper production.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDEAKLSEAXXEFF
Date   Source Headline
12th Jul 20107:00 amRNSCentral Operations Update
12th Jul 20107:00 amRNSLetter of Intent
14th Jun 201012:48 pmRNSSettlement of Contingent Liability
21st May 201010:43 amRNSForm 8.5 (EPT/NON-RI) re WTI
21st May 20107:00 amRNSEnd of Offer Period
20th May 201010:20 amRNSForm 8.5 (EPT/NON-RI) re WTI
19th May 201010:15 amRNSForm 8.5 (EPT/NON-RI) re WTI
18th May 201010:35 amRNSForm 8.5 (EPT/NON-RI) re WTI
17th May 201010:33 amRNSForm 8.5 (EPT/NON-RI) re WTI
17th May 20107:00 amRNSDisposal
14th May 201010:23 amRNSForm 8.5 (EPT/NON-RI) re WTI
11th May 20109:38 amRNSForm 8.5 (EPT/NON-RI) re WTI
10th May 201011:22 amRNSForm 8.5 (EPT/NON-RI) re WTI
6th May 201010:19 amRNSForm 8.5 (EPT/NON-RI) re WTI
5th May 201010:02 amRNSForm 8.5 (EPT/NON-RI) re Weatherly
30th Apr 20105:35 pmRNSForm 8 (OPD) - Weatherly International PLC
29th Apr 201010:19 amRNSForm 8.5 (EPT/NON-RI) re WTI
28th Apr 20103:32 pmRNSForm 8.3 - Weatherly International PLC
28th Apr 201011:54 amRNSForm 8.3 - Weatherly International PLC
27th Apr 20102:41 pmRNSForm 8.3 - Weatherly International PLC - Amendment
27th Apr 201010:43 amRNSForm 8.3 - Weatherly International PLC
27th Apr 201010:35 amRNSForm 8.3 - Weatherly International PLC
26th Apr 201010:17 amRNSForm 8.5 (EPT/NON-RI) re WTI
23rd Apr 20101:33 pmRNSForm 8.3 - Weatherly International Group
23rd Apr 201011:34 amRNSForm 8.5 (EPT/NON-RI) re WTI
22nd Apr 201011:20 amRNSForm 8.5 (EPT/NON-RI) re WTI
21st Apr 201010:12 amRNSForm 8.5 (EPT/NON-RI) re WTI
20th Apr 20104:53 pmRNSForm 8.3 - Weatherly International plc
20th Apr 201010:46 amRNSForm 8.5 (EPT/NON-RI) re WTI
19th Apr 201011:42 amRNSForm 8.5 (EPT/NON-RI)
16th Apr 20102:59 pmRNSStatement re Possible Offer
1st Apr 20103:56 pmRNSGrant of Options
1st Apr 20107:00 amRNSTschudi Mine Feasibility Study Awarded to Sedgman
31st Mar 20107:00 amRNSAgreement for Sale of Kombat
29th Mar 201011:31 amRNSFurther re: Independent Technical Review
29th Mar 201010:48 amRNSIndependent Technical Review
25th Mar 20107:00 amRNSCompletion of Smelter Disposal
15th Mar 20104:47 pmRNSHolding(s) in Company
11th Mar 201011:58 amRNSResult of General Meeting
10th Mar 20105:47 pmRNSHolding(s) in Company
9th Mar 201010:06 amRNSHalf Yearly Report
2nd Mar 20102:58 pmRNSHolding(s) in Company
25th Feb 20107:00 amRNSPosting of Circular and Notice of General Meeting
23rd Feb 201012:04 pmRNSSmelter Disposal Update
29th Jan 20107:00 amRNSTermination of Agreement
19th Jan 20106:01 pmRNSHolding(s) in Company
14th Jan 20101:30 pmRNSProposed Disposal of Smelter Business
31st Dec 200912:52 pmRNSChange of Registered Office
22nd Dec 20091:24 pmRNSResult of AGM
17th Dec 20097:00 amRNSTschudi Pit Optimisation Study

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.