The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVast Res Regulatory News (VAST)

Share Price Information for Vast Res (VAST)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.355
Bid: 0.33
Ask: 0.38
Change: 0.03 (9.23%)
Spread: 0.05 (15.152%)
Open: 0.325
High: 0.355
Low: 0.325
Prev. Close: 0.325
VAST Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Baita Plai - Summary of Refurbishment Works

10 Aug 2021 07:00

RNS Number : 0795I
Vast Resources PLC
10 August 2021
 

Vast Resources plc / Ticker: VAST / Index: AIM / Sector: Mining

 

10 August 2021

Vast Resources plc

("Vast" or the "Company")

 

 

Baita Plai Operational Update - summary of refurbishment works

 

Vast Resources plc, the AIM-listed mining company, as announced today is pleased to provide a comprehensive summary of the refurbishment works undertaken at Baita Plai Mine both on the underground infrastructure, and on the processing plant.

 

1. Underground

a. Refurbishment

Significant work has been undertaken on the underground infrastructure including;

· Replacement of 1,200 metres of main hoisting cable across three shafts

· Replacement of man travelling cages in Shaft 2

· Refurbishment of bell signal systems on Shafts 1 and 3

· Repair and installation of railway tracks on 18 level and 0 level

· Installation of 300m of 6KvA power cable to feed upgraded underground transformer room:

o Installation of 2 x main transformers

o Installation of 4 x 400v transformers for equipment feeds

o Blasted chamber for underground transformer room

o Support installed, roof bolts, mesh and shotcrete

· Refurbished 22 'fixed type' 1.0m3 underground wagons for ore transport

· Repaired 1 x 7 ton electric trolley locomotive

 

b. Ventilation

· Refurbished surface ventilation fan at the Baia Rosie ventilation shaft

· Conducted an internal ventilation investigation of air flow in the mine

· Identified requirements for airflow based on equipment underground

· Constructed:

o 6 ventilation doors

o 22 ventilation seals

· Installed

o 2 x 15Kw 800mm fans on 18 level

o 2 x 11Kw 600mm fans on 18 level

o 2 x 7Kw 400mm fans on Sub-Level 1 (18 level -9m)

o 150m 400mm ventilation columns

 

c. Production

· Completed 85.2m of main belt incline access development

· Completed 79.0m of spiral incline access to Sub-level 1 (18 level -9m)

· Completed 116.4m of ore drive on Sub-Level 1

· Completed 16.0m ventilation raise from Sub-Level 1 to 18 level

· 2 x diesel LHDs dismantled, sent underground, reassembled and in use

· 2 x electric LHDs dismantled, sent underground, reassembled and awaiting final completion of electrical transformer room

· Underground engineering workshop constructed with overhead beam crane

· 3 x submersible pumps in use with main water sump created on Sub-Level 1

 

d. General

· Compiling Standard Operating Procedures for underground activities

· Training of mechanised equipment operators

· Lighting installed in high activity areas

· Underground main ore passes from 0 level to 6 level box-front hydraulics refurbished

· Surface wagons for ore transport to plant modified and repaired

 

2. Processing Plant

a. Refurbishment

· Repaired and modified surface ore tipping arrangement

· Reinforced and refurbished ore bunkers

· Refurbished double deck vibrating screen

· Refurbished secondary crushers

· Refurbished crusher to silo conveyor belts

· Refurbished mill feed conveyor belt

o Emergency stop switches along length

· Refurbished mill lubrication system

· Replaced main mill bearings

· Replaced mill liners

· Refurbished 44 x 2.8m3 flotation cells

o Replaced and upgraded electrical controls and switches

o Bearings, motors and belt drives replaced where necessary

o Installed new slurry pump

o General electrical repair and refurbishment

· Replaced old filter cloth filters with uprated ceramic disk filters for concentrate production

· Constructed chutes for concentrate collection

· Refurbished and re-laid floor for concentrate storage

 

b. General

· Creation of processing plant sample preparation area

o Granulator

o Vacuum pump

o Shaking sieves

· Structural building survey of key intense vibration areas

· Replaced all stairs with inclusion of handrails

· Sealed processing plant roof

· Reagent storage room created with data sheets for all chemicals in use

· Linked processing plant to main administration IT network for daily reporting

· Full perimeter lighting installed on the tailings dam

· Cameras installed at tailings dam for safety and environmental monitoring

· 8 water monitoring boreholes drilled at tailings dam with piezometers installed

**ENDS**

 

For further information, visit www.vastplc.com or please contact:

 

Vast Resources plcAndrew Prelea (CEO)

Andrew Hall (CCO)

 

www.vastplc.com+44 (0) 20 7846 0974

Beaumont Cornish - Financial & Nominated Advisor

Roland Cornish

James Biddle

 

www.beaumontcornish.com

+44 (0) 20 7628 3396

Shore Capital Stockbrokers Limited - Joint Broker Jerry Keen (Corporate Broking)

Toby Gibbs / James Thomas (Corporate Advisory)

 

www.shorecapmarkets.co.uk +44 (0) 20 7408 4050

Axis Capital Markets Limited - Joint Broker Richard Hutchison

 

www.axcap247.com +44 (0) 20 3206 0320

St Brides Partners Limited

Susie Geliher

www.stbridespartners.co.uk

+44 (0) 20 7236 1177

 

ABOUT VAST RESOURCES PLC

 

Vast Resources plc is a United Kingdom AIM listed mining company with mines and projects in Romania and Zimbabwe.

 

In Romania, the Company is focused on the rapid advancement of high-quality projects by recommencing production at previously producing mines.

 

The Company's Romanian portfolio includes 100% interest in the producing Baita Plai Polymetallic Mine, located in the Apuseni Mountains, Transylvania, an area which hosts Romania's largest polymetallic mines. The mine has a JORC compliant Reserve & Resource Report which underpins the initial mine production life of approximately 3-4 years with an in-situ total mineral resource of 15,695 tonnes copper equivalent with a further 1.8M-3M tonnes exploration target. The Company is now working on confirming an enlarged exploration target of up to 5.8M tonnes.

 

The Company also owns the Manaila Polymetallic Mine in Romania, which was commissioned in 2015, currently on care and maintenance. The Company has been granted the Manaila Carlibaba Extended Exploitation Licence that will allow the Company to re-examine the exploitation of the mineral resources within the larger Manaila Carlibaba licence area.

 

In Zimbabwe, the Company is focused on the commencement of the joint venture mining agreement on the Community Diamond Concession, Chiadzwa, in the Marange Diamond Fields.

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.Reach is a non-regulatory news service. By using this service an issuer is confirming that the information contained within this announcement is of a non-regulatory nature. Reach announcements are identified with an orange label and the word “Reach” in the source column of the News Explorer pages of London Stock Exchange’s website so that they are distinguished from the RNS UK regulatory service. Other vendors subscribing for Reach press releases may use a different method to distinguish Reach announcements from UK regulatory news.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRAUKVARABUWRUR
Date   Source Headline
29th Jan 201911:15 amGNWNew Corporate Presentation
29th Jan 201910:15 amGNWShareholder Q&A Document
22nd Jan 20191:30 pmGNWBlueberry Project Drilling Results
21st Jan 20197:00 amGNWUpdate on securing off take Pre-Payment Finance
18th Jan 20194:40 pmRNSSecond Price Monitoring Extn
18th Jan 20194:35 pmRNSPrice Monitoring Extension
18th Jan 20193:05 pmGNWIssue and Allotment of Ordinary Shares following Exercise of Conversion Rights
18th Jan 20192:15 pmGNWUSD5.5 million Tranche B Mercuria Facility
17th Jan 201912:30 pmGNWUpdate on USD5.5 million Tranche B Mercuria facility
16th Jan 20197:00 amGNWCorrection to Share Capital
15th Jan 20197:00 amGNWLetter to Shareholders and Notice of General Meeting
8th Jan 20193:30 pmGNWExercise of Warrants and Issue of Equity
3rd Jan 20199:54 amGNWDirector Share Purchase
24th Dec 20189:30 amGNWInterim Results
21st Dec 20185:30 pmGNWIssue of Convertible Security
20th Dec 20187:00 amGNWUSD3,000,000 Bridge Facility
14th Dec 20183:30 pmGNWMarange Diamond Field exploration: Status
7th Dec 20185:25 pmGNWExercise of Warrants, Issue of Equity and Total Voting Rights
5th Dec 20183:20 pmGNWIssue of Equity & Total Voting Rights
30th Nov 20187:00 amGNWQuarterly Production Summary
19th Nov 20187:00 amGNWCommencement of Drilling at Magura Neagra and Piciorul Zimbrului
14th Nov 201812:30 pmRNSZimbabwean Site Visit
2nd Nov 201811:30 amGNWPlacing to raise £1,000,000 before costs
30th Oct 20183:15 pmGNWUSD1 million Funding Secured for Blueberry Project
22nd Oct 20184:15 pmGNWResult of AGM
22nd Oct 201811:00 amRNSVast Resources wins "Best Mining Development"
18th Oct 201812:30 pmRNSPlacing and Subscription
17th Oct 20187:00 amRNSProgress Update on Marange Diamond Field JV
17th Oct 20187:00 amRNSInitial assessment of the T1A Marange concession
16th Oct 20184:15 pmGNWExercise of Warrants and Issue of Equity
16th Oct 20187:00 amGNWContract of Association Signed with Baita Sa and Association Licence Granted
11th Oct 20183:30 pmRNSBlueberry Project Drilling Results
10th Oct 20184:40 pmRNSSecond Price Monitoring Extn
10th Oct 20184:35 pmRNSPrice Monitoring Extension
28th Sep 20181:30 pmGNWNotice of AGM and Posting of Annual Report
28th Sep 20187:00 amGNWFinal Results
29th Aug 20189:00 amRNSSubscription to raise GBP863,750
24th Aug 201812:30 pmRNSBlueberry Project Drilling Results
6th Jul 20187:00 amRNSDiamond Specialist Joins Board of Subsidiary
3rd Jul 20188:00 amRNSInvestor Presentation Evening
26th Mar 20187:00 amRNSSignificant JORC Compliant Resource Upgrade
26th Feb 20187:00 amRNSAppointment of Country Manager (Zimbabwe)
2nd Jan 201810:30 amRNS2018 CEO Statement
5th Dec 20171:21 pmRNSTotal Voting Rights
24th Nov 20177:01 amRNSOpen Offer to raise up to £1.23 million
16th Nov 201710:00 amRNSNew Corporate Presentation
9th Oct 20175:03 pmRNSExercise of Warrants and Issue of Equity
6th Oct 20174:17 pmRNSHolding(s) in Company
29th Sep 201711:30 amRNSManaila Extension Drilling Results Update
18th Aug 20177:00 amRNSMatching terms for US$10 million investment

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.