Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTertiary Minerals Regulatory News (TYM)

Share Price Information for Tertiary Minerals (TYM)

Share Price is delayed by 15 minutes
Get Live Data
0.0525    0.00 (0.00%)
Bid:
0.05
Ask:
0.055
Spread: 0.005 (10.00%)
Market Cap: £3.74m
TYM Live PriceLast checked at - London Stock Exchange

Intraday Tertiary Minerals Share Chart

Update on Konkola West Copper Project

20 Feb 2025 08:20

RNS Number : 8591X
Tertiary Minerals PLC
20 February 2025
 

 

20 February 2025

 

Tertiary Minerals plc ("Tertiary" or the "Company")

 

UPDATE, KONKOLA WEST COPPER PROJECT

The Company is pleased to provide the following update on its Konkola West Copper Project in Zambia where KoBold Metals Company ("KoBold") has the right to earn into Large Exploration Licence 27067-HQ-LEL. Details of the Earn-In Agreement were outlined in the Company's news release dated 19 December 2023.

Drilling Update - Hole KWDD001

Drilling of hole KWDD001 has advanced past 2,600m down-hole depth and is now drilling ahead in the Kitwe Formation which forms the upper part of the Lower Roan Subgroup and which, at its base, is host to the Ore Shale (Copperbelt Orebody Member) of the Zambian Copperbelt.

The drill hole is currently in the Shale with Grit unit of the Kitwe Formation, the base of which is typically between 25-225m above the Ore Shale in the Konkola area1. If conditions and equipment allow, the planned completion depth for KWDD001 is 3,000m.

Drilling has taken substantially longer than expected and KWDD001 has drilled deeper than originally planned. This is due to folding, possibly along an extension of the major Fitwaola fault system. Drilling also becomes progressively slower with depth due to the incremental time required to recover drill core from the drill face.

Second Drill Hole

KoBold has advised the Company that it plans to start drilling a second deep hole at Konkola West shortly after the completion of the first hole. A number of possible locations have been selected where the Lower Roan is now projected to be closer to the surface with a final location decision contingent on further geological interpretation of hole KWDD001.

Further Agreements

Under the Earn-in Agreement, KoBold is required to complete two holes and a minimum 2,000m of drilling within 14 months of signing the Earn-in Agreement.

In the circumstances, Tertiary Minerals (Zambia) Limited and its local partner, Mwashia Resources Limited, have agreed with KoBold to extend this 14-month period by four months to allow time to start and progress drilling of the second hole.

The parties have also signed a second agreement to give effect to a provision of the Earn-In Agreement to ensure that KoBold's newly granted adjacent Large Exploration Licence, 38615-HQ-LEL, will be also be held under the terms of the Earn-in Agreement for the benefit of all the parties.

"We continue to be excited about our involvement in this ground-breaking project. The hole is close to its target and KoBold is gathering a large amount of data which, together with its regional data sets and AI models, will inform its choice of the drilling location for the second hole at Konkola West.

"KoBold is committing substantial funds to the project with expenditure of over US$2 million already reported through to the end of December 2024."

Patrick Cheetham, Executive Chairman Tertiary Minerals plc

 

"Konkola West is a property that - prior to the efforts of KoBold, Tertiary, and Mwashia - has not seen systematic work to locate and explore the Copperbelt Orebody Member and other strata that are mineral bearing in the region. KWDD001 is, to our knowledge, the deepest hole ever drilled on the Zambian Copperbelt and has been crucial to understanding regional structure and stratigraphy.

"We are using the data collected from this hole to update our regional models and predictions, and design our next hole at Konkola West. We are proud to have pushed the boundaries of exploration in Zambia in general, and at Konkola West in particular; we look forward to starting our second hole at Konkola West shortly."

Mfikeyi Makayi, Chief Executive Officer, KoBold Metals Africa

 

1 Source: https://portergeo.com.au/database/mineinfo.asp?mineid=mn012

Further Information:

Tertiary Minerals plc:

Patrick Cheetham, Executive Chairman

+44 (0) 1625 838 679

SP Angel Corporate Finance LLP

Nominated Adviser and Broker

Richard Morrison/Jen Clarke

+44 (0) 203 470 0470

Peterhouse Capital Limited

Joint Broker

Lucy Williams/Duncan Vasey

+ 44 (0) 207 469 0930

 

Market Abuse Regulation

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

Qualified Person Information:

The information in this release has been compiled and reviewed by Mr. Patrick Cheetham (MIMMM, MAusIMM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies. Mr. Cheetham is a Member of the Institute of Materials, Minerals & Mining and also a member of the Australasian Institute of Mining & Metallurgy.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLVBLBLELLFBBV
Date   Source Headline
25th Jun 20257:00 amRNSUpdate: Konkola West Copper Project, Zambia
23rd Jun 20258:53 amRNSHolding(s) in Company
19th Jun 20257:00 amRNS-RProject Focus: Jacks Copper Project, Zambia
17th Jun 20259:27 amRNSHolding(s) in Company
16th Jun 20253:07 pmRNSHolding(s) in Company
13th Jun 20254:37 pmRNSHolding(s) in Company
13th Jun 20252:33 pmRNSHolding(s) in Company
6th Jun 202511:34 amRNSPlacing of £350,000
14th May 20259:31 amRNS-RProject Focus: Mushima North, Zambia
9th May 20253:48 pmRNSGrant of Warrants
14th Apr 20257:00 amRNSDrilling Results, Mukai Copper Project
31st Mar 20252:40 pmRNSKonkola West Copper Project - Drilling Update
25th Mar 20257:00 amRNSNew Silver Mineralisation - Mushima North, Zambia
17th Mar 20257:00 amRNSNew Silver Results - Mushima North, Zambia
7th Mar 20252:45 pmRNSResult of AGM
6th Mar 202512:45 pmRNSResult of AGM
27th Feb 20257:00 amRNSBrunton Pass Project – Drilling Results
25th Feb 20257:00 amRNSAppointment of Managing Director
20th Feb 20258:20 amRNSUpdate on Konkola West Copper Project
7th Feb 202511:00 amRNSAnnual Report for the Year Ended 30 September 2024
28th Jan 20257:00 amRNSAudited Results for Year Ended 30 September 2024
20th Jan 20257:00 amRNSNew Silver Discovery at Mushima North
20th Dec 20247:00 amRNSOperational Update - Zambia
16th Dec 20248:59 amRNSBrunton Pass Project – Completion of Drilling
2nd Dec 20249:27 amRNSTotal Voting Rights
18th Nov 20242:08 pmRNSAdoption of Discretionary Executive Bonus Scheme
15th Nov 20248:29 amRNSBrunton Pass Copper-Gold Project - Drill Start
4th Nov 20247:00 amRNSMukai Copper Project - Commencement of Drilling
28th Oct 20247:00 amRNSCopper-Zinc Mineralisation found at Mushima North
16th Oct 20247:00 amRNSMushima North Drilling
30th Sep 20247:00 amRNSTotal Voting Rights
23rd Sep 20247:00 amRNSDrill Start & Exploration Update
16th Sep 20241:12 pmRNSHolding(s) in Company
13th Sep 20243:51 pmRNSHolding(s) in Company
12th Sep 20244:16 pmRNSHolding(s) in Company
29th Aug 20245:19 pmRNSStoruman Fluorspar Project, Sweden
28th Aug 20247:00 amRNSPlacing to raise £880,000
9th Aug 20248:50 amRNSCEO Interview - Company Presentation
7th Aug 20247:00 amRNSMukai Project - Agreement for Joint Venture
29th Jul 20247:00 amRNSMupala Copper Project, Soil Sampling Results
21st Jun 20248:53 amRNSDRILLING UPDATE, KONKOLA WEST COPPER PROJECT
10th Jun 20247:00 amRNSMupala Copper Project, Zambia
6th Jun 202410:53 amRNSUpdate – Agreement with Mwashia
29th May 202410:42 amRNSHalf-Yearly Report 2024
21st May 20247:00 amRNSDrilling Update, Konkola West Copper Project
9th May 20247:00 amRNSMupala Copper Project Update
2nd May 20247:00 amRNSExploration Update – Brunton Pass Project, Nevada
16th Apr 20242:00 pmRNSDrilling - Konkola West Copper Project, Zambia
9th Apr 20249:48 amRNSDrill Start - Konkola West Copper Project, Zambia
29th Feb 20247:00 amRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.