Botswana Nickel Project - Progress Update

Two Shields Investments plc, the AIM quoted investment company with a strategy focused on building a portfolio of investments in to fast growing disruptive markets including technology metals, cyber security, e-commerce and technology enabled businesses, is pleased to provide an update on ground operations being undertaken by Kalahari Key Mineral Exploration Pty Ltd ("Kalahari Key") at the Molopo Farms Complex project ("MFC" or the "Project") a Botswana Nickel-Copper-PGMs exploration project 100% owned by Kalahari Key.

The Project consists of licences covering an area of 2,725 square kilometres that are considered prospective for Nickel-Copper-PGMs mineralisation and is 100% owned by Kalahari Key.

Two Shields has a 17.8% interest in Kalahari Key. In addition, TSI owns 15,195,826 shares in Power Metal Resources plc ("POW") representing approximately 4.1% of the issued share capital of POW. POW has an 18.26% shareholding in Kalahari Key and also has a right by 31 December 2019 to elect to earn into a 40% direct project interest in the Molopo Farms Complex project, through an investment of US$500,000 in the Project by 31 December 2020.

Should it elect to earn in, POW will hold an effective economic interest of 50.96% in the Project. POW's Kalahari Key acquisition agreement was announced on 13 May 2019 and readers can review this announcement through the following link:

https://www.powermetalresources.com/n/n104/acquisition-and-earn-in-agreement-botswana-project

Highlights:

·; A helicopter-borne electro-magnetic ("EM") survey over the Molopo Farms Feeder Zone project area completed in Q2 2019 identified 17 sub-surface conductor targets and follow up ground EM surveys over 14 of the targets produced at least 6 high priority targets of considerable size and scale for which 8 drill holes have been designed to penetrate all targets;

 

·; The targets are highly conductive bodies which could potentially be host to massive nickel sulphides due to the spatial location, particular geological setting and associated magnetic response;

 

·; Further work has been undertaken to select the top priority targets and 5 have now been selected as a focus for the initial drilling programme;

 

·; Kalahari Key have appointed consultants Wellfields Consulting Services in Gaborone, Botswana to complete a pre-drilling Environmental Management Plan ("EMP") and fieldwork in respect of this EMP has now been completed and Kalahari Key await receipt of the EMP report;

 

·; Kalahari Key are to shortly implement gravity surveys over 5 drill targets, to eliminate as far as possible any chance that the targets are graphite rather than sulphide bodies, since the former although conductive would not be of interest, although this is considered unlikely given the geological setting;

 

·; Further liaison with drilling contractors is underway, including some who have expressed a willingness to consider equity in lieu of cash for a portion of their drilling costs in respect of the initial programme;

 

·; There is interest in the MFC project from third parties and Kalahari Key are maintaining liaison with external organisations;

 

·; Given the potential valuation uplift on a positive initial drill results the preference at this stage would be to undertake the initial drilling programme before formalising any agreement with a third party in respect of project or company disposal, farm-in or joint venture; however all options remain open to discussion, subject to appropriate commercial terms;

 

·; Further updates to shareholders will be provided at the earliest opportunity.

 

Paul Johnson, Chief Executive Officer of Power Metal Resources commented: "Kalahari Key are rapidly advancing in Botswana to a position where they can drill the high priority targets. The initial programme will cover 5 very strong conductor targets and will optimise the chance of making a discovery.

Nickel stocks at the LME continue to fall dramatically, and we believe that the price of nickel will appreciate accordingly. As such, partially positioning POW in the nickel exploration space is deliberate to expose our shareholders to the upside that comes within the nickel sector during times of positive supply/demand dynamics.

We continue to focus on delivery and progress across our projects and anticipate a number of updates across our company in the coming weeks."

 

Kalahari Key and MFC Project Background

Kalahari Key Mineral Exploration Company (Pty) Ltd, registered in Botswana, is a mineral exploration and geological consultancy company.

The MFC Project consists of three licences covering an area of 2,725 square kilometres that are considered prospective for Nickel-Copper-PGMs mineralisation and are 100% owned by Kalahari Key.

In November 2016 the company acquired two mineral exploration licences (PL310/2016 and PL311/2016) from the Botswana Government. The licences cover the eastern and central parts of a shear/feeder zone through the centre of the Bushveld-related Molopo Farms Complex in southern Botswana. A third licence (PL202/2018) was acquired in early 2018 immediately to the south of PL311/2016.

 

Power Metal Resources' Interest in Kalahari Key and The MFC Project

Power Metal Resources ("POW") has an 18.26% shareholding in Kalahari Key and also has a right by 31 December 2019 to elect to earn into a 40% direct project interest in the MFC project by investing US$500,000 in the Project by 31 December 2020 (the "Earn-in").

Should POW elect to Earn In, it will hold an effective economic interest of 50.96% in the Project.

POW's Kalahari Key acquisition agreement was announced on 13 May 2019 and readers can review this announcement through the following link:

https://www.powermetalresources.com/n/n104/acquisition-and-earn-in-agreement-botswana-project

 

Further Information on the POW Project Level 40% Earn-In to the MFC Project

Not later than 31 December 2019 POW may elect, at its sole discretion, to earn-in to 40% of the MFC Project by entering into and then fulfilling a commitment to spend US$500,000 ("Committed Spend") during the period to 31 December 2020.

Upon POW entering into the Earn-in (or earlier with the agreement of all parties) an MFC Project operational committee (the "Committee") will be established comprising members Roger Key (Kalahari Key Director), Andrew Bell (POW Director) and Andrew Moore (Kalahari Key Director). The Committee will determine the allocation of the Committed Spend and management of operational activities. Upon completion of the Earn-in expenditure requirement POW will hold 40% of the MFC Project

The Committed Spend will be applied primarily to the completion of drilling of four targets at the MFC Project.

Also, upon POW entering into the Earn-in (or earlier if agreed by all parties) Paul Johnson (POW Director) will join the Board of Kalahari Key.

Neither the Committee members nor the existing or new directors of Kalahari Key will be remunerated for their services.

Also, upon the company entering into the Earn-in, a Joint Venture Agreement will be established between the parties which will determine strategy, operational management and corporate structuring. This will include the usual fund or dilute provisions unless an alternate structure is agreed by the parties.

 

 

 

For further information please visit https://twoshields.co.uk/ or contact:

Andrew Lawley

Two Shields Investments plc

+44 (0)20 3143 8300

 

Neil Baldwin / Andrew Emmott

Spark Advisory Partners Ltd

(Nominated Adviser) 

+44 (0) 20 3368 3554 

Andy Thacker 

 

 

Turner Pope Investments Ltd

(Brokers)

 

+44 (0) 20 3621 4120

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDCKFDPCBDDBKB
Date   Source Headline
27th Nov 202010:20 amRNSResult of General Meeting
26th Nov 20207:00 amRNSInterim results for the six months to 30 Sept 2020
20th Nov 20201:06 pmRNSKalahari Key update
17th Nov 20207:00 amRNSBrandShield Contract Win
16th Nov 20203:19 pmRNSKalahari Key update
13th Nov 20204:51 pmRNSTR-1: Notification of major holdings
12th Nov 20202:00 pmRNSPrice Monitoring Extension
12th Nov 202010:44 amRNSInvestor Presentation
11th Nov 20209:30 amRNSSchedule One - Two Shields Investments PLC
11th Nov 20207:30 amRNSRestoration - Two Shields Investments plc
11th Nov 20207:00 amRNSAcq'n of BrandShield; Placing; Ad Doc publication
27th Oct 20202:33 pmRNSKalahari Key update
15th Oct 20202:45 pmRNSKalahari Key update
7th Oct 20202:10 pmRNSPower Metal Resources PLC - Kalahari Key update
28th Sep 20201:26 pmRNSFinancial results for the year ended 31 March 2020
17th Sep 20208:29 amRNSS'ment re share price movement; RTO of BrandShield
17th Sep 20207:52 amRNSSuspension - Two Shields Investments Plc
4th Sep 20204:38 pmRNSTR-1: Notification of major holdings
27th Aug 20209:00 amRNSKalahari Key Update
27th Aug 20207:00 amRNSWeShop Update
25th Aug 202010:36 amRNSTR-1: Notification of major holdings
24th Aug 20207:00 amRNSBrandShield Update
18th Aug 20209:00 amRNSKalahari Key update
13th Aug 202012:26 pmRNSWeShop Update
11th Aug 20207:15 amRNSBrandShield Update
11th Aug 20207:00 amRNSKalahari Key update
5th Aug 20204:30 pmRNSTR-1: Notification of major holdings
2nd Jun 20207:00 amRNSBrandShield Update
21st May 20207:05 amRNSTR-1: notification of major holdings
21st May 20207:00 amRNSTR-1: notification of major holdings
13th May 20201:31 pmRNSTR-1: Notification of major holdings
13th May 20201:28 pmRNSTR-1: Notification of major holdings
30th Apr 20202:43 pmRNSTR-1: Notification of major holdings
29th Apr 20201:53 pmRNSKalahari Key update - Replacement
20th Apr 20208:38 amRNSKalahari Key update
16th Apr 20207:00 amRNSBrandShield Update
6th Apr 20203:07 pmRNSTR-1: Notification of major holdings
6th Apr 202012:42 pmRNSTR-1: Notification of major holdings
2nd Apr 202012:49 pmRNSBrandshield: Phishing Sites Created to Target Zoom
27th Mar 20201:32 pmRNSBrandshield Update
25th Mar 20204:29 pmRNSBrandshield Update
18th Mar 20207:20 amRNSTR-1: Notification of major holdings
17th Mar 20203:20 pmRNSTR-1: Notifications of Major Holdings
10th Mar 20209:12 amRNSShare Swap with WeShop Limited shareholder
5th Mar 202012:52 pmRNSInvestment in BrandShield Completed
3rd Mar 20201:33 pmRNSTR-1: Notification of major holdings
3rd Mar 202011:23 amRNSFurther investment in BrandShield
26th Feb 20209:53 amRNSTR-1: Notification of major holdings
24th Feb 20201:59 pmRNSResult of General Meeting
21st Feb 20207:00 amRNSBrandShield launches ElectionShield

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.