Q1 Production Update

21 Apr 2017 11:57

RNS Number : 0113D
Trans-Siberian Gold PLC
21 April 2017
 

 

 

Trans-Siberian Gold plc

("TSG" or the "Company")

 

Q1 Production Update

 

Trans-Siberian Gold plc ("TSG" or the "Company") (TSG.L) announces its production update at the Asacha Gold Mine for the three months to 31 March 2017 ("Q1" or the "Period").

 

Highlights:

 

· Q1 gold production of 7,644oz (Q1 2016: 9,343oz)

· Full year production expected to be in the range of 32,000oz - 36,000oz

· No lost time injuries for the Period

 

Production Summary:

 

Mining and production data for the Period at Asacha is shown in the following table:

 

Q1-2017

Q1-2016

Mine development (m)

1,263

1,115

Ore mined (mt)

46,155

44,067

Ore processed (mt)

44,320

40,300

Average gold grade (g/t)

5.35

7.38

Average silver grade (g/t)

8.99

10.75

Gold recovery rate (%)

94.24

94.95

Silver recovery rate (%)

76.69

77.36

Gold in dore (oz)

7,246

9,202

Silver in dore (oz)

10,148

10,818

Gold refined (oz)

7,644

9,343

Silver refined (oz)

12,356

11,542

 

 

Q1 gold production was 7,644oz compared to 9,343oz for the same period in 2016.

 

During the Period, 40.8% of ore delivered to the plant was new stoping ore, with an average grade of 7.9 g/t. In order to maintain monthly plant throughput of at least 12,500 mt it was necessary to process earlier run-of-mine ore which contained lower grades of gold. As a result, gold production is lower on a comparative basis with the same period in 2016.

 

Extraction of new stoping ore was hindered during the Period by a lack of underground equipment, flooding at lower levels and the failure of mobile pump equipment which also led to a slowdown in some of the major mine development activities, including the installation of stationary high power pumps at the 150 m level and construction of the transportation tunnel from the 150 m level to the 100 m level.  However, with new mobile pumps now in place and the arrival of new underground machines the Company expects to be able to accelerate all mining activities.

 

 

The Company has started preparation for ore cutting in the upper part of the interval between the 150 m and 100 m levels, which should facilitate access to higher grade ore, and thus expects to gradually increase gold production from Q3 onwards.

 

The Company expects to achieve gold production for the full year in the range of 32,000-36,000oz (2016: 35,550oz).

 

TSG intends to provide a production update for the second quarter of 2017 in July 2017.

 

GKZ approval of Reserves & Resources:

 

In March 2017 the reserves and resources of the Asacha deposit were re-approved by the State Commission of Reserves ("GKZ"), which are set out below.

 

Mineral Resources - Russian State Commission for Reserves (GKZ)

 as at 31 December 2016

Au

Ag

Cut-off g/t

C1 & C2 oz

Grade g/t

C1 & C2 oz

 Grade g/t

Asacha

623 943

19.8

1 476 612

46.8

2

P1+P2 Resources

Au

Ag

Cut-off g/t

Р1 & Р2 oz

Grade g/t

Р1 & Р2 oz

 Grade g/t

Asacha

0

0

0

0

2

 

 

The figures in the above table (which do not include the results of 2016 exploration) have been prepared under the Russian system of reporting reserves and resources.

 

Approval from GKZ is an important step in the process to obtain an extension of the Asacha licence in 2018. The Company expects to provide an updated JORC compliant reserves and resources statement around the end of May 2017.

 

 

Contacts:

 

TSG

 

Simon Olsen

+44 (0) 7770 484965

Stewart Dickson

+44 (0) 7799 694195

 

 

 

Cantor Fitzgerald Europe

+44 (0) 207 894 7000

David Porter

David Foreman

Craig Francis

 

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

 

 

The information in this report that relates to the reporting of mineral resources is based on information compiled or reviewed by Viktor Zhelikov. Viktor Zhelikov is the Chief Geologist within the Group and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Qualified Person as defined in the AIM Rules for Companies. Viktor Zhelikov consents to the inclusion of the mineral resources information in the form and context in which it appears.

 

Abbreviations

g/t grammes per tonne

oz ounce

mt metric tonne

m metre

 

Disclaimer

This announcement contains "forward-looking statements" - that is, statements related to future, not past, events. In this context, forward-looking statements often address our expected future business and financial performance, and often contain words such as "expects," "anticipates," "intends," "plans," "believes," "seeks," "should" or "will." Forward-looking statements by their nature address matters that are, to different degrees, uncertain. For us, uncertainties arise from the behaviour of financial and metals markets, fluctuations in interest and/or exchange rates and metal prices; and from numerous other matters of national, regional and global scale, including those of a political, economic, business, competitive or regulatory nature. These uncertainties may cause our actual future results to be materially different that those expressed in our forward-looking statements.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEAELFASLXEFF
Date   Source Headline
16th Mar 20217:00 amRNSMineral Resource Estimate
15th Mar 20217:00 amRNSTransaction in Own Shares
9th Mar 20217:00 amRNSTransaction in Own Shares
8th Mar 20217:00 amRNSTransaction in Own Shares
5th Mar 20217:00 amRNSTransaction in Own Shares
5th Mar 20217:00 amRNSAsacha Gold Mine Update
3rd Mar 20217:00 amRNSTransaction in Own Shares
2nd Mar 20217:00 amRNSInterim Results - EBITDA Correction
1st Mar 20217:00 amRNSTransaction in Own Shares
26th Feb 202110:04 amRNSReorganisation of TSG shareholding
26th Feb 20217:00 amRNSShare Buyback Programme
19th Feb 20217:00 amRNSRodnikova Project Scoping Study
3rd Feb 20217:00 amRNSChange of Advisers
19th Jan 20217:00 amRNSQ4 & FY20 Production Update
6th Jan 20213:22 pmRNSStatement on Fatalities at the Asacha mine
6th Jan 20212:06 pmRNSSecond Price Monitoring Extn
6th Jan 20212:01 pmRNSPrice Monitoring Extension
31st Dec 20207:00 amRNSSignificant Shareholders' Holdings
15th Dec 20207:00 amRNSIncreased Production Guidance for 2020
14th Dec 20204:41 pmRNSSecond Price Monitoring Extn
14th Dec 20204:36 pmRNSPrice Monitoring Extension
14th Dec 202011:00 amRNSPrice Monitoring Extension
30th Nov 20204:41 pmRNSHolding(s) in Company
30th Nov 20204:17 pmRNSHolding(s) in Company
30th Nov 20204:16 pmRNSHolding(s) in Company
30th Nov 20204:15 pmRNSHolding(s) in Company
10th Nov 20207:00 amRNSHolding(s) in Company
28th Oct 20207:00 amRNSDrilling & Exploration Update
22nd Oct 20207:00 amRNSQ3 Production and Operations Update
21st Oct 20207:00 amRNSInterim Dividend Currency Exchange Rate
29th Sep 20207:00 amRNSInterim Results
24th Sep 20207:00 amRNSNotice of Results and Investor Presentation
1st Sep 20207:01 amRNSHolding(s) in Company
1st Sep 20207:00 amRNSHolding(s) in Company
28th Aug 20207:00 amRNSLong Term Incentive Plan
24th Jul 20207:00 amRNSQ2 Production & Operations Update
20th Jul 20207:00 amRNSFinal Dividend Currency Exchange Rate
15th Jul 20207:00 amRNSExploration Presentation
14th Jul 20207:00 amRNSDrilling Results & Exploration Update
10th Jul 20207:00 amRNSVein 25 Development Update
30th Jun 20202:06 pmRNSResult of AGM
16th Jun 20207:00 amRNSMineral Resource Update
8th Jun 20207:00 amRNSNotice of AGM and Dividend Timeable
8th Jun 20207:00 amRNSLong Term Incentive Plan
8th Jun 20207:00 amRNSFinal Results
5th Jun 20207:00 amRNSNotice of Results
5th Jun 20207:00 amRNSDebt Re-Financing
19th May 20209:30 amRNSHolding(s) in Company
29th Apr 20205:36 pmRNSHolding(s) in Company
29th Apr 20205:35 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.