Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTSG.L Regulatory News (TSG)

  • There is currently no data for TSG

Asacha Project Update

26 Jan 2011 07:00

RNS Number : 0602A
Trans-Siberian Gold PLC
26 January 2011
 

 

 

 

Trans-Siberian Gold plc

 

Asacha project update

 

 

London: 26 January 2011 - Trans-Siberian Gold plc ("TSG" or "the Company") (TSG.L)reports on the progress of construction at the Asacha site.

 

Underground mine development is continuing as planned. In 2010 mine development and preparation works, by-product extraction and exploration works amounted to 1,590 metres and more than 16,600 m3. Ore mined during mine development activities in this period totalled more than 20,500 tonnes; including the adit ore and the pre-production ore mined in the previous periods the ore stockpile at 31 December 2010 comprised more than 60,000 tonnes.

 

All the plant building's wall panels have been installed and the outside concrete walls completed. The first layer of roof panels has been installed. Although roofing work has been hampered by poor weather conditions and strong winds, half of the multi- layer roofing was in place by 31 December 2010 and the building's thermal protection work (placing of heat-insulating layer) is in progress.

 

Concrete works have commenced at the coarse ore bin site. The plant building's concrete flooring is almost complete and work on its inside walls is proceeding.

 

By 31 December 2010 the specialist contractor had completed the installation of the major plant equipment under the supervision of representatives of the Chinese manufacturer of the major plant equipment and the plant designer. The manufacturer and designer have reported their positive conclusion on the mills' installation.

The plant's internal lighting has been completed and installation of ventilation equipment is in progress.

 

The tailings storage facility's dam is under construction and work continues to lay the geomembrane. Delivery of the electrical equipment for the tailings pump station is expected by the end of January.

 

The buildings to house the water pump station and the firefighting station have been completed and are now awaiting delivery and installation of their respective pumps. The documentation to obtain the license for cyanide storage has been submitted to the authorities and the paperwork in respect of the permits for the fuel storage facility is being prepared.

 

The repair shop building is almost complete and is currently being used as a heated workshop for the prefabrication of ventilation and concrete parts and other items required for construction. The sewage treatment facility's technological piping is currently being installed.

 

Two diesel generators have been successfully started on a trial basis and the engineering systems at the power unit site are being arranged. Most of the power cables have been delivered to Vladivostok, for shipment by sea to Petropavlovsk-Kamchatskiy.

 

Constant efforts are being taken to remove snow from the construction site. Seasonal weather conditions are hampering the delivery of materials and equipment to the site but, at this stage, this is not expected to impact on the start of gold production around mid-year 2011.

 

 

 

 

Ends

 

Contacts:

 

TSG

+44 (0) 1480 811871

Simon Olsen

 

 

 

Seymour Pierce Ltd

+44 (0) 207 107 8000

Stewart Dickson / David Foreman (Corporate Finance)

 

Jeremy Stephenson (Corporate Broking)

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBAMITMBJTBIB
Date   Source Headline
16th Mar 20217:00 amRNSMineral Resource Estimate
15th Mar 20217:00 amRNSTransaction in Own Shares
9th Mar 20217:00 amRNSTransaction in Own Shares
8th Mar 20217:00 amRNSTransaction in Own Shares
5th Mar 20217:00 amRNSTransaction in Own Shares
5th Mar 20217:00 amRNSAsacha Gold Mine Update
3rd Mar 20217:00 amRNSTransaction in Own Shares
2nd Mar 20217:00 amRNSInterim Results - EBITDA Correction
1st Mar 20217:00 amRNSTransaction in Own Shares
26th Feb 202110:04 amRNSReorganisation of TSG shareholding
26th Feb 20217:00 amRNSShare Buyback Programme
19th Feb 20217:00 amRNSRodnikova Project Scoping Study
3rd Feb 20217:00 amRNSChange of Advisers
19th Jan 20217:00 amRNSQ4 & FY20 Production Update
6th Jan 20213:22 pmRNSStatement on Fatalities at the Asacha mine
6th Jan 20212:06 pmRNSSecond Price Monitoring Extn
6th Jan 20212:01 pmRNSPrice Monitoring Extension
31st Dec 20207:00 amRNSSignificant Shareholders' Holdings
15th Dec 20207:00 amRNSIncreased Production Guidance for 2020
14th Dec 20204:41 pmRNSSecond Price Monitoring Extn
14th Dec 20204:36 pmRNSPrice Monitoring Extension
14th Dec 202011:00 amRNSPrice Monitoring Extension
30th Nov 20204:41 pmRNSHolding(s) in Company
30th Nov 20204:17 pmRNSHolding(s) in Company
30th Nov 20204:16 pmRNSHolding(s) in Company
30th Nov 20204:15 pmRNSHolding(s) in Company
10th Nov 20207:00 amRNSHolding(s) in Company
28th Oct 20207:00 amRNSDrilling & Exploration Update
22nd Oct 20207:00 amRNSQ3 Production and Operations Update
21st Oct 20207:00 amRNSInterim Dividend Currency Exchange Rate
29th Sep 20207:00 amRNSInterim Results
24th Sep 20207:00 amRNSNotice of Results and Investor Presentation
1st Sep 20207:01 amRNSHolding(s) in Company
1st Sep 20207:00 amRNSHolding(s) in Company
28th Aug 20207:00 amRNSLong Term Incentive Plan
24th Jul 20207:00 amRNSQ2 Production & Operations Update
20th Jul 20207:00 amRNSFinal Dividend Currency Exchange Rate
15th Jul 20207:00 amRNSExploration Presentation
14th Jul 20207:00 amRNSDrilling Results & Exploration Update
10th Jul 20207:00 amRNSVein 25 Development Update
30th Jun 20202:06 pmRNSResult of AGM
16th Jun 20207:00 amRNSMineral Resource Update
8th Jun 20207:00 amRNSNotice of AGM and Dividend Timeable
8th Jun 20207:00 amRNSLong Term Incentive Plan
8th Jun 20207:00 amRNSFinal Results
5th Jun 20207:00 amRNSNotice of Results
5th Jun 20207:00 amRNSDebt Re-Financing
19th May 20209:30 amRNSHolding(s) in Company
29th Apr 20205:36 pmRNSHolding(s) in Company
29th Apr 20205:35 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.