The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTorotrak PLC Regulatory News (TRK)

  • There is currently no data for TRK

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

V-Charge Update

2 Feb 2016 07:00

RNS Number : 7091N
Torotrak PLC
02 February 2016
 

2 February 2016

 

Torotrak plc

("Torotrak" or the "Company")

 

Confirmation of V-Charge test results

 

Torotrak, (LSE: TRK), a leading developer and supplier of emissions reduction and fuel efficiency technology for vehicles, is pleased to announce the latest results of the on-engine V-Charge testing programme conducted by University of Bath ('Bath') in collaboration with a global Tier 1 supplier of engine boosting systems and with the participation of the Ford Motor Company ('Ford').

 

In summary:

 

· V-Charge on-engine performance rig tests completed on time and confirm simulation predictions

· New testing with specifically tailored turbocharger planned for April completion

· Integrated V-Charge solution predicted to outperform other advanced boosting technologies in fuel economy, performance and cost

· In vehicle demonstration available in July

 

The initial simulation phase of the project was successfully completed last year and we are pleased to announce that the next phase in the programme (of planned on-engine rig testing of V-Charge with a standard off-the-shelf turbocharger on a 1.0L Ford Ecoboost gasoline engine) has now also been successfully completed in January as planned. The test results have been independently validated by Bath and confirm that the fuel consumption and performance of V-Charge is highly competitive and in line with expectations. V-Charge successfully achieved the target requirements in boost pressure, mass airflow and power consumption and delivered class-leading 'time to torque' (a measure of transient response) delivering 90 per cent of target torque in under 500ms. These results are in line with the simulation models developed by the Company in conjunction with Bath.

 

The test results have been shared with our Tier 1 partner and with Ford and opportunities to further improve the performance of V-Charge in a production-intent twin-stage boosting system have been identified. Working in conjunction with Bath and our Tier 1 partner and using our validated simulation model, we have specified a production turbocharger unit which is optimized to maximize the performance improvements and fuel economy of the V-Charge equipped engine. The partners expect that this revised configuration will demonstrate further benefits from the technology and confirm the full extent of engine downsizing and downspeeding that can be achieved with V-Charge. The Tier 1 partner in the programme has committed to delivering the adapted turbocharger unit in March 2016 and it is anticipated that the results from on-engine testing will be available in April 2016. The parties expect these results to show that this new V-Charge configuration outperforms other advanced boosting technologies.

 

The partners plan in addition to complete the installation of this twin-stage boosting system of V-Charge and the matched turbocharger in a Ford Focus by July 2016 for demonstration to customers. Drive cycle testing will also be conducted by Bath to NEDC and the new WLTP procedures, further validating the real-world benefits of V-Charge.

 

The cost study currently being undertaken in conjunction with the Tier 1 indicates that V-Charge will be a lower cost solution than other advanced boosting solutions when integrated into a vehicle.

 

As noted in the Company's interim results in November 2015, we continue to see increased levels of interest by Tier 1s and OEMs in our V-Charge technology both for passenger cars and also smaller off-highway commercial vehicles. Our discussions with potential licensing partners and potential OEM customers confirm the importance of the following key features and benefits of V-Charge:

 

Feature

Benefit

Compressor speed range - typically 10x to 100x engine speed

· On demand variable air flow at any engine speed to provide performance, economy and emissions benefits

· Allows precise air management and seamless turbo handover at all engine speeds

Continuous power capability - 17kW (air power)

· Enables optimal turbo sizing for maximum power output

· Allows sustained continuous low speed torque when required

Ratio controlled traction drive CVT

· Rapid time to maximum compressor speed

· Low noise with no noise attenuation required

· Lower installed cost

· Smaller, simpler packaging

Low power electromechanical actuation system

· Low parasitic losses

· Low cost, compact standard automotive actuator

Integrated 'DriveDisconnect' function for full disengagement without external clutch

· Lower cost

· Simpler packaging

 

We look forward to updating shareholders with the next stage of testing for the optimized V-Charge twin-stage boosting system.

 

Nick Barter, Non-Executive Chairman said: "We are delighted with the independent test results achieved by V-Charge on a 1.0L Ford Ecoboost engine. These results confirm the capability of V-Charge to enable engine downsizing in a low cost, simple to install boosting system. We are confident that V-Charge offers passenger car OEMs and off-highway OEMs a cost-effective way to address the emissions reduction challenges they face from 2020 onwards while maintaining driveability, and we look forward to securing licensing arrangements to take this technology into a range of volume vehicle markets."

 

Adam Robson, CEO said: "These results are very pleasing. I am very encouraged by the enthusiasm shown by our Tier 1 partner to extend the scope of this programme to include their new turbocharger configuration. This extra investment will permit us to show the fullest potential of V-Charge."

 

For more information, please visit www.torotrak.com or contact:

 

Torotrak plc

Adam Robson, Chief Executive / Rex Vevers, Finance Director

Tel: +44 1772 900931

 

Cantor Fitzgerald Europe (Financial Adviser & Broker)

Marc Milmo / Will Goode / David Banks

Tel: +44 20 7894 7000

 

Tavistock (Financial PR)

Simon Hudson / Lulu Bridges / James Collins

Tel: +44 20 7920 3150

 

About Torotrak

Torotrak is a leading developer and supplier of kinetic energy recovery systems, engine boosting and variable drive transmissions for vehicles. Our portfolio of technology solutions substantially improves fuel economy and reduces CO2 and other emissions in vehicles through capturing and recycling energy that would otherwise be lost, harnessing the power of supercharging to enable engine downsizing and managing the engine at the optimum point.

 

About Smart Project

The Innovate UK funded Smart Project programme is to develop a production orientated version of the V-Charge supercharger for a specific downsized engine application for passenger cars, involves initial simulation, on-engine rig testing and demonstration of real-world performance improvements and fuel economy from V-Charge. Bath is a world-recognised centre of excellence in the field of pressure charging and is responsible for independently validating the potential of V-Charge to improve fuel consumption and performance compared to incumbent boosting technology. The programme is being conducted in collaboration with a global Tier 1 supplier of engine boosting systems and with the participation of the Ford Motor Company.

 

-ends-

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCZMGGZNMNGVZM
Date   Source Headline
6th Dec 20175:30 pmRNSAdministrators and Suspension from Trading
5th Dec 20175:43 pmRNSUpdate on financial position
1st Dec 20177:00 amRNSUpdate on financial position
30th Nov 20174:40 pmRNSSecond Price Monitoring Extn
30th Nov 20174:35 pmRNSPrice Monitoring Extension
29th Nov 20175:17 pmRNSHolding(s) in Company
28th Nov 20178:09 amRNSUpdate re: financial update
9th Nov 201710:25 amRNSNotice of Half Year Results
26th Oct 20174:40 pmRNSSecond Price Monitoring Extn
26th Oct 20174:35 pmRNSPrice Monitoring Extension
25th Oct 201712:07 pmRNSSecond Price Monitoring Extn
25th Oct 201712:02 pmRNSPrice Monitoring Extension
29th Sep 20172:52 pmRNSResult of AGM
19th Sep 20174:40 pmRNSSecond Price Monitoring Extn
19th Sep 20174:35 pmRNSPrice Monitoring Extension
1st Aug 20177:00 amRNSBlock listing Interim Review
31st Jul 20174:55 pmRNSPublication of Annual Report
31st Jul 20171:02 pmRNSHolding(s) in Company
28th Jul 201710:59 amRNSHolding(s) in Company
27th Jul 20175:16 pmRNSHolding(s) in Company
27th Jul 20177:00 amRNSFinal Results
12th Jul 20171:45 pmRNSNotice of Results
31st May 201711:10 amRNSS656 General Meeting Update
26th May 201712:19 pmRNSHolding(s) in Company
4th May 20177:00 amRNSCompanies Act Section 656
2nd May 20174:40 pmRNSSecond Price Monitoring Extn
2nd May 20174:35 pmRNSPrice Monitoring Extension
2nd May 201712:07 pmRNSSecond Price Monitoring Extn
2nd May 201712:02 pmRNSPrice Monitoring Extension
24th Apr 201712:07 pmRNSSecond Price Monitoring Extn
24th Apr 201712:02 pmRNSPrice Monitoring Extension
13th Apr 20174:40 pmRNSSecond Price Monitoring Extn
13th Apr 20174:35 pmRNSPrice Monitoring Extension
5th Apr 20175:47 pmRNSHolding(s) in Company
4th Apr 201710:35 amRNSFlybrid at Future Powertrain 2017
1st Mar 20174:40 pmRNSSecond Price Monitoring Extn
1st Mar 20174:35 pmRNSPrice Monitoring Extension
1st Feb 20174:13 pmRNSBlock listing Interim Review
30th Jan 20177:00 amRNSStrategic Update, Group Refocus
4th Jan 20172:48 pmRNSHolding(s) in Company
16th Dec 20167:00 amRNSTrading Update
29th Nov 20167:00 amRNSHalf-year Report
9th Nov 20162:40 pmRNSNotice of Half Year Results
10th Oct 20162:00 pmRNSV-Charge Test Drives at Aachen Colloquium
16th Sep 201612:21 pmRNSHolding(s) in Company
14th Sep 201610:31 amRNSAPC Funding for Off-Highway Project
14th Sep 20167:00 amRNSPresentation of V-Charge testing results
5th Sep 20165:01 pmRNSResult of AGM
5th Sep 20167:00 amRNSAnnual General Meeting
1st Aug 20169:38 amRNSBlock listing Interim Review

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.