Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTethyan Resources Regulatory News (TETH)

  • There is currently no data for TETH

First Drill-Hole Results

24 May 2005 12:33

Triple Plate Junction Plc24 May 2005 For immediate release 24 May 2005 Triple Plate Junction plc's first drill-hole at Crater Mountain intersects 158 metres of 1.4 g/t gold Triple Plate Junction plc's ("TPJ" or the "Company") the AIM-listed goldexploration company focusing on South East Asia, has received encouragingresults from its first diamond drill hole at the Crater Mountain project inPapua New Guinea. The hole intersected a mineralised width of 158 metres averaging 1.4 g/t goldfrom 220 metres to 378 metres hole depth, with hydrothermal brecciation,disseminated, fracture-filled and vein sulphide mineralization encounteredthroughout the hole length of 450 metres. The results confirm a drill holeinterval of 115 metres of 1.8 g/t gold reported by then BHP in the same area in1997, and appear to significantly increase the intersected width ofmineralization. Pyrite and carbonate-base metal dominated veins and fractures encountered in theTPJ drill-hole are multi-phased and hosted in an extensively altered andbrecciated volcanic pile and basement sediments. Gold grades within the 158metre interval averaging 1.4 g/t gold appear to be increasing with hole depth,as evidenced by intercepts of: 12 metres at 1.11 g/t gold from 220-232 metres14 metres at 1.18 g/t gold from 236-250 metres12 metres at 1.64 g/t gold from 262-274 metres58 metres at 1.89 g/t gold from 284-342 metres20 metres at 2.33 g/t gold from 358-378 metres At this early stage of exploration, the extent of mineralization is unknown.Drilling is continuing to better understand structural-lithilogical controls andgeometry of the mineralization. The drill-intersected mineralization occurs in the Nevera prospect area, one offive areas of interest identified in the Crater Mountain structural corridor.The Nevera prospect is characterized by extensive argillic alteration, gold andbase-metal soil anomalism over an area of some 5km by 2km. Early hand dugtrenches by previous explorers returned gold values of 35m at 3.1 g/t and 54m at1.21 g/t, but all surface work has been hampered by three to six metres ofvolcanic ash that blanketed the area in Quaternary times. Crater Mountain is one of a number of Pliocene to Quaternary strata-volcanoesthat lie in the tectonically active New Guinea Mobile Belt. The Mobile Belthosts several world-class gold-copper deposits including Ok Tedi, Porgera,Hidden Valley and Wafi, and the underground vein gold deposits of Kainantu andTolukuma. Prior to commencing the current drilling program, TPJ compiled all existing dataat Crater Mountain including the re-processing and re-interpretation of airborneand ground magnetic data, geochemical data, and landsat structural andlithological data. This work together with new geological mapping and samplinghas identified four highly prospective targets within the Nevera prospect area. TPJ also commissioned geological consultants Sinclair Knight Merz (SKM) toexamine a suite of rocks taken from the Nevera prospect. SKM has reported thatthe rocks comprising dacites, sediments, intrusives, hydrothermal breccias and adiatreme breccia, reveal similarities between Crater Mountain and theworld-class Porgera deposit of similar geological age. Porgera production todate and remaining reserves total approximately 20 Moz of gold. The Crater Mountain project covers 713 sq.km of exploration licences in a jointventure between TPJ, New Guinea Gold Ltd and Celtic Minerals Ltd. TPJ isearning a 51% interest in the project. Bill Howell, TPJ Exploration Director said: "This is a very promising start and will help focus our continuing drillprogram. There is still plenty of exploration required before we can determinethe economic significance of these early results. Crater Mountain has strongpotential and TPJ has the financial capacity to fully evaluate it." For further information please contact: Triple Plate Junction 020 7499 1400 Ian Gowrie-Smith, Chairman Geoff Walsh, Chief Executive David Lees, Finance Director Buchanan Communications 020 7466 5000 Tim Anderson, Isabel Podda, Ben Willey This statement contains certain "Forward looking Statements". All statements,other than statements of historical fact, included herein, including, withoutlimitation, statements regarding potential mineralization and reserves,exploration results and future plans and objectives of Triple Plate JunctionPlc, are forward looking statements that involve various risks anduncertainties. There can be no assurance that such statements will prove to beaccurate and actual results and future events could differ materially from thoseanticipated in such statements. Certain risk factors may also affect the actualresults achieved by Triple Plate Junction Plc. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
8th Nov 201710:14 amRNSDirector/PDMR Shareholding
7th Nov 20178:00 amRNSDirector/PDMR Shareholding
2nd Nov 20173:41 pmRNSAppointment of CEO
2nd Nov 20172:45 pmRNSResults of Geophysics
1st Nov 20171:47 pmRNSResult of General Meeting
31st Oct 20174:07 pmRNSDirectorate Change
16th Oct 201712:29 pmRNSPosting of General Meeting Circular - Replacement
5th Oct 20177:00 amRNSPosting of General Meeting Circular
26th Sep 20177:00 amRNSGeophysical Surveys Completed
22nd Sep 20177:00 amRNSGeneral Meeting Date
14th Sep 20177:00 amRNSResults of New Drill Holes at Rudnitza
8th Sep 20178:00 amRNSProposed Delisting from AIM & Share Consolidation
5th Sep 20177:00 amRNSChange of Eligibility for Stamp Duty Exemption
4th Sep 20177:00 amRNSListing on TSX Venture Exchange
30th Aug 20177:00 amRNSMD&A
30th Aug 20177:00 amRNSHalf-year Report
25th Aug 20177:00 amRNSDirectorate Change
18th Aug 20172:30 pmRNSUpdate on TSX-V Secondary Listing
12th Jul 20177:00 amRNSUpdate on TSX-V Secondary Listing
3rd Jul 201710:43 amRNSAppointment of Financial Controller
3rd Jul 20177:00 amRNSDrilling Programme Completed at Rudnitza
27th Jun 20177:00 amRNSResult of AGM and Appointment of non-exec Chairman
22nd Jun 20173:30 pmRNSDirectorate Change
13th Jun 20177:00 amRNSSuva Ruda Update
2nd Jun 201710:00 amRNSFinal Results
19th May 20179:54 amRNSRe: TSX-V Listing and Related Party Transaction
25th Apr 201710:35 amRNSCommencement of Drill Programme at Suva Ruda
11th Apr 20177:00 amRNSCommencement of Drilling Programme in late April
28th Mar 20177:00 amRNSEquity placing of £1 million
28th Feb 20177:00 amRNSFurther re: Option Agreement on Suva Ruda
17th Feb 201711:11 amRNSDirector/PDMR Shareholding
7th Feb 201710:17 amRNSDirector/PDMR Shareholding
1st Feb 20171:32 pmRNSDirector/PDMR Shareholding
27th Jan 201711:00 amRNSDirector/PDMR Shareholding
25th Jan 20177:00 amRNSResults of Remaining 3 Drill Holes at Rudnitza
16th Jan 20177:00 amRNSResults of First Drill Hole at Rudnitza
21st Dec 201611:17 amRNSHolding(s) in Company
21st Dec 201611:12 amRNSIssue of Options
19th Dec 20169:25 amRNSHolding(s) in Company
16th Dec 20167:00 amRNSAppointment of Directors
15th Dec 20164:22 pmRNSHolding(s) in Company
15th Dec 20164:21 pmRNSHolding(s) in Company
14th Dec 20167:00 amRNSDrilling Completed on the Rudnitza Prospect
12th Dec 201612:28 pmRNSResult of General Meeting
7th Dec 20167:00 amRNSHalf-year Report
22nd Nov 201610:54 amRNSSubscription and Notice of General Meeting
21st Nov 20167:00 amRNSFinancing and Director Appointments
17th Nov 20167:00 amRNSChange of Adviser
1st Nov 20161:37 pmRNSSuva Ruda drilling update
18th Oct 20167:00 amRNSProject Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.