Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTethyan Resources Regulatory News (TETH)

  • There is currently no data for TETH

Exploration Update

25 Jun 2007 07:01

Triple Plate Junction Plc25 June 2007 For immediate release 25 June 2007 Triple Plate Junction plc ("TPJ" or the "Company") HIGH-GRADE GOLD DRILLING INTERSECTION AT OTIBANDA PROJECT TPJ recently commenced a scout diamond drilling program at its Otibanda prospectin Papua New Guinea to test for depth continuity of high grade gold valuesdiscovered in surface sampling and trenching. Three major gold-bearing parallel lodes approximately two kilometres apart knownas Otibanda, Waikanda and Ekoato have been identified in the Otibanda projectarea. The lodes can be traced for up to 3,100m along strike and multiplesub-parallel lodes have been recognised between the three major lodes (LINK TOMAP ONE). Three drillholes, all on the Otibanda lode, have now been completed totalling394 metres (LINK TO MAP TWO) as part of the Company's first phase program of1,500 metres to test various targets on the three lodes. Holes OTI-002 and OTI-003 were drilled beneath surface trenching that hadreturned values of 2 metres of 14.6 g/t gold and 3 metres of 4.35 g/t gold.Hole OTI-003 intersected 2.29 metres averaging 16.2 g/t gold from 59.45 metresdown the hole, a significant intercept which confirms continuity of thehigh-grade gold bearing system at depth. Hole OTI-002 intersected 3 metres of 1.72g/t gold from 119.45 metres hole depthand 2.45metres of 2.69g/t gold from 126.3m down hole. The accompanyinggeochemical signature of anomalous copper and molybdenum, and secondary biotitealteration indicates porphyry copper style mineralization occurs in the Otibandaproject area. Trenching along the Otibanda lode is almost complete and so far has exposed atleast 2,400 metres of the lode. The lode has exhibited consistent goldmineralization where exposed and has found to be associated with numerousparallel structures which are also gold mineralized. Recent preliminary resultsfrom trenching at Nenapuenga Creek at the western end of the lode, has returned1 metre at 11.6g/t gold and 2 metres at 9.48 g/t gold including 1 metre at 16.6g/t gold. To the south of this zone, a chalcopyrite rich vein is exposed in thecreek and in trenches, with grades from 0.5 metres at 18 g/t gold and 1.2 metresat 17.06 g/t gold including 0.5 metres at 20.5 g/t gold. Trenching is continuing on the Waikanda lode and two drill pads are currentlybeing constructed with the aim of drilling under the discovery outcrop, whichreturned 18.01 g/t gold over 10.4 metres and another zone, 450 metres to theeast, which assayed 4.13 g/t gold over 6 metres. Trenching has also started in the Ekoato lode area, and is initiallyconcentrating on excavating the structure where a grab sample from artisanalmine dump material assayed 278 g/t gold. Bill Howell, Exploration Director said "Clearly the Otibanda project areacontains extensive mineralisation with possibly a number of significant ore typesystems. We are just beginning to test the very strong potential of this largearea". Geoff Walsh, CEO added "We continue to be very encouraged by the results todate. Confirmation of grade at depth reduces the risk and increases the scope ofthe project. Our exploration programme on Otibanda will continue at pace."WJS (Bill) Howell, BSc(Hons), FAusIMM,CP (Man), as the qualified ExecutiveDirector has reviewed this statement and authorised its release. For further information please contact: Triple Plate Junction plc 0207 340 9970Geoff Walsh, Chief ExecutiveDavid Lees, Finance Director Buchanan Communications 020 7466 5000Tim Anderson / Isabel Podda/Ben Willey This statement may contain certain "Forward looking Statements". All statements,other than statements of historical fact, included herein, including, withoutlimitation, statements regarding potential mineralisation and reserves,exploration results and future plans and objectives of Triple Plate JunctionPlc, are forward looking statements that involve various risks anduncertainties. There can be no assurance that such statements will prove to beaccurate and actual results and future events could differ materially from thoseanticipated in such statements. Certain risk factors may also affect the actualresults achieved by Triple Plate Junction Plc. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
8th Nov 201710:14 amRNSDirector/PDMR Shareholding
7th Nov 20178:00 amRNSDirector/PDMR Shareholding
2nd Nov 20173:41 pmRNSAppointment of CEO
2nd Nov 20172:45 pmRNSResults of Geophysics
1st Nov 20171:47 pmRNSResult of General Meeting
31st Oct 20174:07 pmRNSDirectorate Change
16th Oct 201712:29 pmRNSPosting of General Meeting Circular - Replacement
5th Oct 20177:00 amRNSPosting of General Meeting Circular
26th Sep 20177:00 amRNSGeophysical Surveys Completed
22nd Sep 20177:00 amRNSGeneral Meeting Date
14th Sep 20177:00 amRNSResults of New Drill Holes at Rudnitza
8th Sep 20178:00 amRNSProposed Delisting from AIM & Share Consolidation
5th Sep 20177:00 amRNSChange of Eligibility for Stamp Duty Exemption
4th Sep 20177:00 amRNSListing on TSX Venture Exchange
30th Aug 20177:00 amRNSMD&A
30th Aug 20177:00 amRNSHalf-year Report
25th Aug 20177:00 amRNSDirectorate Change
18th Aug 20172:30 pmRNSUpdate on TSX-V Secondary Listing
12th Jul 20177:00 amRNSUpdate on TSX-V Secondary Listing
3rd Jul 201710:43 amRNSAppointment of Financial Controller
3rd Jul 20177:00 amRNSDrilling Programme Completed at Rudnitza
27th Jun 20177:00 amRNSResult of AGM and Appointment of non-exec Chairman
22nd Jun 20173:30 pmRNSDirectorate Change
13th Jun 20177:00 amRNSSuva Ruda Update
2nd Jun 201710:00 amRNSFinal Results
19th May 20179:54 amRNSRe: TSX-V Listing and Related Party Transaction
25th Apr 201710:35 amRNSCommencement of Drill Programme at Suva Ruda
11th Apr 20177:00 amRNSCommencement of Drilling Programme in late April
28th Mar 20177:00 amRNSEquity placing of £1 million
28th Feb 20177:00 amRNSFurther re: Option Agreement on Suva Ruda
17th Feb 201711:11 amRNSDirector/PDMR Shareholding
7th Feb 201710:17 amRNSDirector/PDMR Shareholding
1st Feb 20171:32 pmRNSDirector/PDMR Shareholding
27th Jan 201711:00 amRNSDirector/PDMR Shareholding
25th Jan 20177:00 amRNSResults of Remaining 3 Drill Holes at Rudnitza
16th Jan 20177:00 amRNSResults of First Drill Hole at Rudnitza
21st Dec 201611:17 amRNSHolding(s) in Company
21st Dec 201611:12 amRNSIssue of Options
19th Dec 20169:25 amRNSHolding(s) in Company
16th Dec 20167:00 amRNSAppointment of Directors
15th Dec 20164:22 pmRNSHolding(s) in Company
15th Dec 20164:21 pmRNSHolding(s) in Company
14th Dec 20167:00 amRNSDrilling Completed on the Rudnitza Prospect
12th Dec 201612:28 pmRNSResult of General Meeting
7th Dec 20167:00 amRNSHalf-year Report
22nd Nov 201610:54 amRNSSubscription and Notice of General Meeting
21st Nov 20167:00 amRNSFinancing and Director Appointments
17th Nov 20167:00 amRNSChange of Adviser
1st Nov 20161:37 pmRNSSuva Ruda drilling update
18th Oct 20167:00 amRNSProject Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.