focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSunrise Res Regulatory News (SRES)

Share Price Information for Sunrise Res (SRES)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0375
Bid: 0.025
Ask: 0.05
Change: 0.00 (0.00%)
Spread: 0.025 (100.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.0475
SRES Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Start of Drilling, Long Lake Gold Project

11 Nov 2010 07:00

RNS Number : 0088W
Sunrise Resources Plc
11 November 2010
 



 

 

 

11 November 2010

SUNRISE RESOURCES PLC

 

DRILL PROGRAMME TO START AT LONG LAKE GOLD PROJECT, SUDBURY, CANADA

 

Sunrise Resources plc ("Sunrise" or "the Company"), the AIM-quoted diversified mineral exploration and development specialist, is pleased to announce that it has today signed a contract for the maiden drill programme at its Long Lake Gold Project near Sudbury in Ontario, Canada where past production of 56,000 ounces of gold was recorded before mine closure in 1930. Work will commence immediately.

 

HIGHLIGHTS:

 

Ø Up to 10 drill holes will test multiple gold targets

 

Ø 3D geophysical survey will evaluate 3D geometry of mineralisation

 

Ø Drilling is expected to last approximately 3-4 weeks and assay results are anticipated within 6-8 weeks

 

Ø Prime objective to scope the size of the sulphide-associated gold mineralised system for follow up drilling

 

Patrick Cheetham, Chairman of the Company, commented today: "The current drilling programme is the culmination of months of detailed planning, archive research and technical evaluation. This initial drill programme coupled with results from the 3D geophysical survey should enable us to scope the potential size and geometry of the gold mineralised system and we have budgeted for a follow up drilling programme to start as soon as results become available."

 

 

-----------------------------------------------------------------------------------------------------------------------------

Further information:

 

Sunrise Resources plc Tel: +44 (0)1625-505947

Patrick Cheetham, Executive Chairman Mobile: +44 (0)7767 458751

www.sunriseresourcesplc.com

 

Northland Capital Partners Limited Tel: +44 (0)20 7492 4750

Gavin Burnell or Charles Vaughan (Broking)

 

Yellow Jersey PR Tel: +44 (0)20 8980 3545

Dominic Barretto

 

Details of the Programme

 

At least four drill holes will test the gold mineralisation adjacent to and below the existing mine workings at Long Lake where past production of 56,000 ounces of gold is recorded from a gold and sulphide mineralised pipe mined from surface to a vertical depth of just 55m. before mine closure in 1939. 

 

A prime drill target is the continuation of gold mineralisation below the 55m level where it is thought to have been displaced by a fault. 3D modelling of historical mine and drill data indicates that the mineralisation was re-located beneath the fault in a number of 1930s drill holes which intersected high grade mineralisation below the deepest mine level at a vertical depth of approximately 120m (e.g. reported intersections 6m @ 13.8g/t gold and 1.5m @ 30.2g/t gold - true widths unknown).

 

Holes will also be drilled to test for near-surface gold mineralisation beyond the existing pit as the previous limits of mining are understood to have been defined by the economic cut-off grades of the day rather than any particular geological boundary.

 

As gold mineralisation at Long Lake is known to be associated with strong electrically responsive sulphide mineralisation two drill holes are planned to test electromagnetic geophysical anomalies A22 and A23 which at one end are coincident with the existing mine area and which extend from the mine for up to 600m north-east. Further holes may be sited on the basis of geological observations made in the first 6 holes.

 

The drilling programme will be carried out by Summit Drilling Services and supervised by the Company's local consultant Caracle Creek International Consulting Inc. (CCIC).

 

CCIC has also been contracted to carry out a geophysical survey with the objective to map out in 3D the sulphide mineralised system associated with the gold mineralisation at Long Lake. The survey will comprise a surface Induced Polarisation (IP) EARTHPROBE survey, single-bore resistivity profiling and bore-to-bore tomographic imaging using 4 of the new drill holes.

 

The 3D EARTHPROBE survey will be extended to include the "E1" area some 350m south of the mine where drilling in the 1970s and 1980s intersected high-grade gold mineralisation (e.g. 5.7m grading 30g/t gold in 1973 with follow up results of 4.1m grading 12g/t gold in 1987) but where the controls on gold mineralisation remain poorly understood. In addition to surface profiling, down-hole surveys will be carried out in up to 7 of the 1980s drill holes in the E1 area and should provide additional targets for future drilling programmes.

 

Separately the Company is cataloguing, re-boxing and re-locating the historic diamond drill core from the project, most of which is from the E1 prospect area. This core archive is currently in a poor state of preservation but when restored the archived core will be re-sampled for gold analysis.

 

Drilling is expected to last for approximately 3-4 weeks and assay results are anticipated within 6-8 weeks.

 

 

The information in this release has been compiled and reviewed by Mr. Patrick Cheetham (MIMMM, MAusIMM) who is a qualified person for the purposes of the AIM Note for Mining and Oil & Gas Companies dated June 2009. Mr Cheetham is a Member of the Institute of Materials, Minerals & Mining and also a member of the Australasian Institute of Mining & Metallurgy.

 

 

 

Notes to Editors:

 

About the Long lake Project

 

The Company holds a three year option, effective 5 May 2010 to acquire the Long Lake claim group located to the south-west of Sudbury. The claims are being explored for gold and also for nickel-copper-platinum group elements.

 

Since 1883 the Sudbury mining field has accounted for over 25% of the world's total nickel production and new discoveries continue to be made. It is the most productive nickel-mining field in the world with over 1.7 billion tonnes of past production, reserves and resources. Nickel-copper-and platinum group metals ("PGM") bearing sulphide minerals occur in and around a 60 km by 27 km elliptical igneous body called the Sudbury Igneous Complex ("SIC").

 

The claims include a potential 10km extension to producing Copper Cliff offset dyke system prospective for nickel-copper-platinum group metals, where, north of the Company's Property, the producing Copper Cliffs South mine and the Copper Cliff North mine have yielded over 200 million tonnes of ore and Vale Inco Limited's Clarabelle Mill, Copper Cliff Smelter and Copper Cliff Nickel Refinery are located in close proximity.

 

The Long lake gold mine in the SW corner of the claim block produced 57,000 ounces of gold from over 200,000 tonnes of ore mined in the periods 1910-1916 and 1932-1936 from a 50m diameter open glory-hole developed on a plunging pipe-like zone of disseminated gold and strongly sulphide mineralised sedimentary rock down to a depth of just 55m from surface.

 

The Company may acquire a 100% interest in the Property by making staged payments totalling Can $575,000 over a three year period, by meeting exploration expenditures of Can $500,000 in that period and by issuing up to 5,000,000 five year share warrants exercisable at 0.675p per share. The vendor retains a 3% NSR on the property of which 2% may be purchased by the Company at any time for the sum of Can$3 million.

 

Various maps and images illustrating some of the features discussed in this release are available on the Company's website at http://www.sunriseresourcesplc.com/longlake_project.html

 

 

About Sunrise Resources

 

Sunrise Resources plc was formed to acquire the diamond exploration interests of Tertiary Minerals plc in 2005. Since then the Company has made a number of new kimberlite discoveries in Finland and expanded its portfolio of diamond exploration interests to include a new project near Cue in Western Australia.

 

In 2009 the Company made a strategic decision to diversify its project interests and has since acquired interests in the Long Lake Project as well as the Derryginagh Barite mine in south-west Ireland. Derryginagh was worked for barite from 1864-1922, supplying white barite to the local paint industry. Barite, the mineral form of the chemical barium sulphate, is used as a high-value industrial filler in, for example, paint plastics, brake linings and acoustic panels. The Company is targeting a modest scale mining operating at Derryginagh that could, in time, produce a valuable cash flow for the Company.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGGGCUGUPUUAG
Date   Source Headline
15th Aug 201412:21 pmRNSHolding(s) in Company
15th Aug 20147:00 amRNSFurther positive diatomite testwork results
12th Aug 20147:00 amRNSCue Diamond and Corona Gold Projects - Update
30th Jun 20147:00 amRNSProject Updates
19th May 20147:00 amRNSHalf Yearly Report
12th May 20147:00 amRNSPositive Testwork Results - County Line Diatomite
28th Apr 20147:00 amRNSDrilling Update
31st Mar 20148:00 amRNSTotal Voting Rights
27th Mar 20147:00 amRNSCue Diamond and Strike Copper Projects - Update
19th Mar 201412:38 pmRNSHolding(s) in Company
19th Mar 20149:59 amRNSHolding(s) in Company
17th Mar 201412:00 pmRNSIssue of Equity
3rd Mar 20147:00 amRNSProject Update
19th Feb 201412:24 pmRNSResult of AGM
19th Feb 20147:00 amRNSUPDATED PRESENTATION
17th Feb 20147:00 amRNSNew Projects - Nevada
13th Feb 20147:00 amRNSCue Diamond Project - Update
17th Jan 20149:38 amRNSPosting of Annual Report
15th Jan 20147:00 amRNSShare and Warrant Issue
8th Jan 201412:18 pmRNSDirector Share Purchase
12th Dec 201311:32 amRNSFinal Results
13th Nov 20133:16 pmRNSHolding(s) in Company
6th Nov 20135:35 pmRNSIssue of Equity
30th Sep 20137:00 amRNSFurther Positive Diamond Results
30th Aug 20137:00 amRNSTotal Voting Rights
7th Aug 20138:00 amRNSAdmission to trading and Total Voting Rights
1st Aug 201312:14 pmRNSIssue of Equity
25th Jul 20137:00 amRNSNew gold projects and Cue Diamond project update
15th May 201311:53 amRNSHalf Yearly Report
25th Mar 20137:00 amRNSPositive Diamond Results
19th Feb 20133:39 pmRNSResult of AGM
18th Feb 20137:00 amRNSCue Diamond Project Update
29th Jan 20131:13 pmRNSUpdate re drilling results
22nd Jan 20137:00 amRNSCue Diamond Sampling Results
4th Jan 20137:00 amRNSDirector Share Purchase & Issue of Equity
20th Dec 20127:00 amRNSGrant of warrants
12th Dec 20121:30 pmRNSFinal Results
3rd Dec 20127:00 amRNSCue Diamond Project - new Kimberlite Occurrences
12th Nov 20127:00 amRNSEquity Finance Facility Warrants Pricing
1st Nov 20127:00 amRNSStudy Update - Derryginagh Barite Project
25th Oct 20127:00 amRNS£3m Equity Finance Facility Secured
23rd Oct 20127:00 amRNSCue 1 Kimberlite confirmed diamondiferous
22nd Oct 20127:00 amRNSResponse to Press Comment & Market Update
25th Sep 20127:00 amRNSDerryginagh Project Update
6th Sep 20127:00 amRNSCue Project Update
31st Aug 20129:15 amRNSHolding(s) in Company
21st Aug 20127:00 amRNSProject Update
30th Jul 20124:48 pmRNSIssue of Equity
31st May 20127:00 amRNSDirectorate Change
30th May 20127:00 amRNSDerryginagh Project Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.