Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSunrise Resources PLC Regulatory News (SRES)

Share Price Information for Sunrise Resources PLC (SRES)

Share Price is delayed by 15 minutes
Get Live Data
0.0175    0.00 (0.00%)
Bid:
0.015
Ask:
0.02
Spread: 0.005 (33.333%)
Market Cap: £1.64m
SRES Live PriceLast checked at - London Stock Exchange

Intraday Sunrise Resources PLC Share Chart

Bay State Project Drill Start

19 Aug 2015 07:00

RNS Number : 4148W
Sunrise Resources Plc
19 August 2015
 
19 August 2015 SUNRISE RESOURCES PLC

(the "Company")

 

 

DRILL CONTRACT SIGNED FOR BAY STATE SILVER PROJECT, NEVADA

 

DRILLING TO START NEXT WEEK

 

 

Sunrise Resources plc, the AIM-traded diversified mineral exploration and development company, is pleased to announce that it has signed a contract with Boart Longyear for a drill programme at its Bay State Silver Project in Nevada, USA.

 

The drill and drill crew will mobilise to site on Monday 24th August for an immediate drill start; drill access roads and drill pads have already been constructed.

 

As previously advised, the first phase of drilling is expected to comprise 3 holes at 150-200m spacing to test for mineralisation beneath existing workings on the Chihuahua Vein system and one of these holes will also test the area where bonanza silver grades were recently obtained from underground sampling (see announcement of 1 June 2015).

 

The Phase 1 drill programme comprises approximately 500m of diamond drilling and is expected to last about two weeks, with analytical results available within eight weeks, subject to satisfactory drill conditions and analytical laboratory turnaround times.

 

Commenting today, Executive Chairman Patrick Cheetham said: "This is the first modern exploration programme on the Chihuahua Vein system and we anticipate this initial drill programme will provide valuable grade and geological information and pave the way for more substantial programmes of drilling aimed at resource definition."

 

A Company presentation focused on the Bay State Silver Project and the upcoming drill programme will be available on the Company's website this morning.

 

 

Further information:

 

Sunrise Resources plc

Patrick Cheetham, Executive Chairman

Tel:

+44 (0) 845 868 4590

Northland Capital Partners Limited

Edward Hutton/David Hignell

John Howes/Mark Treharne (Broking)

 

 

Tel:

+44 (0)20 7382 1100

 

Yellow Jersey PR Limited

Dominic Barretto/Kelsey Traynor

Tel:

+44 (0)7768 537739

About the Bay State Silver Project

 

The Bay State Silver Project is located on the west flank of the Newark Valley in Eastern Nevada, 15km due east of the County town of Eureka. It was acquired by the Company in September 2014 and further claims were recently added to the project.

 

The mine was worked for silver in the 1870s and again in the 1900s when mining focused on two main NW-SE striking vein sets hosted within limestone. The largest workings are on the Chihuahua and Buckeye State Patents which together cover a strike length of some 900m and extend north and south of Mining Canyon along the Chihuahua Vein System. Two shafts were sunk on the border between these two patents, near the floor of the canyon, and are reported to extend to a depth of 120m with production mainly from extensive stopes above the 60m level. The Chihuahua Vein dips steeply to the west.

 

In the 1940s tungsten mineralisation was reportedly discovered in the upper workings of the Chihuahua Adit and was worked during the war years providing tungsten for the war effort. The tungsten was reported to occur as a replacement mineralisation within limestone beds.

 

The Company first acquired rights to the Bay State Silver Project in late 2014 and has since completed a number of surface and underground sampling programmes.

 

 

About Sunrise Resources plc

 

Sunrise Resources plc is an AIM-traded diversified mineral exploration and development company.

 

The Company's objective is to develop profitable mining operations to sustain the Company's wider exploration efforts and create value for shareholders through the discovery of world-class deposits.

 

The Company has diamond and gold exploration interests in Western Australia and has staked claims and acquired leases over a number of projects in Nevada, USA, most recently at the Junction Gold Project.

 

The Company also holds diamond exploration interests in Finland and a white barite project in South-West Ireland.

 

Shares in the Company trade on AIM. EPIC: "SRES" www.sunriseresourcesplc.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBUGDIRUBBGUI
Date   Source Headline
17th Aug 20217:00 amRNSUpdate: CS Pozzolan- Perlite Project
29th Jun 20217:00 amRNSBaker’s Project - Drilling Results
17th Jun 20217:00 amRNSSALE OF NON-CORE PROJECTS
27th May 20212:00 pmRNSBOARD CHANGE & ISSUE OF EQUITY
24th May 202110:18 amRNSHalf-year Report
19th May 20217:00 amRNSCS PROJECT SUCCESSFUL TEST GRIND OF POZZOLAN
14th May 20217:00 amRNSBaker’s Gold Project, Western Australia
29th Apr 20217:00 amRNSBaker’s Gold Project – Scheduled Drill Programme
16th Mar 202110:33 amRNSDirector/PDMR Shareholding
10th Mar 202110:11 amRNSAssay Results at Clayton Silver-Gold Project
4th Mar 20211:06 pmRNSCompany Presentation Webinar
26th Feb 20214:28 pmRNSTotal Voting Rights
26th Feb 20217:00 amRNSWebinar
23rd Feb 20217:00 amRNSProject Updates & Company Presentation
15th Feb 20213:54 pmRNSWarrant Exercise
8th Feb 20217:00 amRNSClayton Silver Project Drill Core Samples
3rd Feb 20211:58 pmRNSExercise of Warrants
28th Jan 20211:30 pmRNSResult of AGM
27th Jan 202112:06 pmRNSWarrant Exercise
18th Jan 20211:06 pmRNSWarrant Exercise
13th Jan 20217:00 amRNSProject Updates
22nd Dec 20207:00 amRNSPOSTING OF ANNUAL ACCOUNTS AND NOTICE OF AGM
17th Dec 20207:00 amRNSCollaborative Concrete Trials - CS Project
11th Dec 20204:33 pmRNSReplacement: Final Results
11th Dec 20202:03 pmRNSFinal Results
18th Nov 20201:54 pmRNSDirector/PDMR Shareholding
16th Nov 20207:00 amRNSProject Updates
9th Nov 20207:00 amRNSProject Update Clayton Silver-Gold Project
30th Oct 20202:41 pmRNSDirector Dealing, Issue of Equity, TVR
27th Oct 20207:00 amRNSProject Updates
16th Sep 20207:00 amRNSCS Project – Grant of Air Quality Operating Permit
2nd Sep 20208:30 amRNSCS Project Update
1st Sep 20202:27 pmRNSTotal Voting Rights
27th Aug 20207:00 amRNSPlacing - Broker Option
24th Aug 20207:00 amRNS£1 million funding, offer to existing shareholders
18th Aug 20207:00 amRNSReclamation Permit and Air Quality Permit
6th Aug 202011:00 amRNSDirector Dealing, Issue of Equity & Warrants, TVR
5th Aug 20207:00 amRNSBroker Update
5th Aug 20207:00 amRNSCS PROJECT: MINE RECLAMATION PERMIT IS GRANTED
29th Jul 20207:00 amRNSCS PROJECT: MINE PERMIT IS GRANTED
24th Jun 20207:00 amRNSCS PROJECT UPDATE
29th May 202010:54 amRNSHalf-year Report
15th May 20207:00 amRNSCS PROJECT – RELEASE OF ENVIRONMENTAL ASSESSMENT
1st May 20204:25 pmRNSTotal Voting Rights
15th Apr 20201:25 pmRNSIssue of Equity and Total Voting Rights
26th Mar 20207:00 amRNSCS PROJECT - UPDATE
19th Mar 20202:19 pmRNSResult of AGM
13th Mar 20207:00 amRNSStatement re: Annual General Meeting
2nd Mar 20204:59 pmRNSTotal Voting Rights
25th Feb 202010:37 amRNSPosting of Report and Notice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.