Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSound Energy Regulatory News (SOU)

Share Price Information for Sound Energy (SOU)

Share Price is delayed by 15 minutes
Get Live Data
1.90    0.00 (0.00%)
Bid:
1.80
Ask:
2.00
Spread: 0.20 (11.111%)
Market Cap: £4.35m
SOU Live PriceLast checked at - London Stock Exchange

Intraday Sound Energy Share Chart

Operations Update

23 Aug 2012 14:15

RNS Number : 6837K
Sound Oil PLC
23 August 2012
 



 

23 August 2012

 

Sound Oil plc

("Sound Oil" or "the Company")

 

Operations Update - Kerendan and Jatayu, Indonesia

 

Sound Oil, the upstream oil and gas company with assets in Italy and Indonesia, is pleased to announce the following update on its operations in Indonesia.

 

 

Bangkanai PSC (Sound 5%: carried, non-paying):

 

Operations commenced at 19.30 local time on 22 August 2012 to drill the first of four development wells on the Kerendan gas field in Kalimantan. Three of the wells will be batch drilled and the fourth will be drilled as a single operation. Each well will be drilled as a deviated hole from the Sungai Lahei well pad located immediately west of the field. Operations are expected to take six months to complete.

 

Sound Oil's share of proved and probable reserves (proved undeveloped) in the Kerendan field are 6.685 Bscf and 0.070 MMbo (condensate) (Fugro Robertson CPR, October 2011); equivalent to 1.184 MMboe. First gas is expected to be delivered in late 2013.

 

After drilling the Kerendan development wells, the rig will move to drill the West Kerendan-1 exploration well, approximately 9 km southwest of the Kerendan field. This structure is prospective for P50 resources of > 1900 Bscf (95 Bscf net to Sound Oil) in several reservoir targets, including the same level as the Kerendan field and in deeper unexplored horizons.

 

 

Citarum PSC (Sound 20%):

 

Pan Orient Energy, the operator of the Citarum PSC has today provided the following update on operations at the Jatayu-1 exploration well in Java.

"Since the operations update of July 25th, the well was drilled through the first loss zone at 6,173 feet to a depth of 6,330 feet where total drilling fluid losses were once again encountered resulting in heavily gasified mud resulting in a four meter gas flare when the mud was run through a separator at surface. A cement plug was run to cure the losses and was drilled out to 6,329 feet where losses were once again encountered and the decision was made to run wireline logs and pressure points, which were run successfully. A preliminary interpretation of the wireline logs and pressure data collected over the interval of interest was unable to confirm the presence of gas pay.

Two further attempts were made to drill through the loss zone at 6,330 feet with a maximum depth of 6,346 feet achieved before once again having to set a cement plug in an attempt to deal with the drilling fluid losses. Presently, one last cement plug has been set and the well is currently drilling cement just above the loss zone. In the event that the drilling fluid losses that are unable to be controlled are experienced in this latest attempt, the well will be suspended and the rig will mobilize to the Guelis-1 location with that well anticipated to spud in the next three to four weeks."

 

Gerry Orbell, Sound Oil's Chairman and Chief Executive commented:

 

"We are very pleased that the Kerendan project is now moving ahead. The development is expected to provide the first revenues from our Indonesian operations and West Kerendan offers the opportunity of significant upside gas that could support export to the coastal LNG markets. The news on Jatayu-1 is of course disappointing, after the Operator has put a lot of effort into achieving the target depth".

 

 

 

For further information please contact:

 

Sound Oil

Gerry Orbell, Chairman & Chief Executive

Michael Cope, Chief Operating Officer

 

Tel: +44 (0)1372 365745

 

Smith & Williamson - Nominated Adviser

Azhic Basirov

David Jones

 

Tel: +44 (0)20 7131 4000

Westhouse Securities - Broker

Dermot McKechnie

Jonathan Haines

 

Tel: +44 (0)20 7601 6100

Buchanan - Financial PR

Tim Thompson

Ben Romney

Helen Chan

 

Tel: +44 (0)20 7466 5000

 

 

Notes:

 

 

1. The information contained in this announcement has been reviewed by Sound Oil's Chief Operating Officer, Dr M. J. Cope BSc PhD CGeol FGS, a qualified petroleum geologist.

 

2. The basis of the reserve and resource estimates referred to above is consistent with SPE (The Society of Petroleum Engineers) guidelines and are taken from a Competent Person's Report prepared for Sound Oil by Fugro Robertson Limited in October 2011.  "MMbo" means million barrels of oil; "MMboe" means barrels of oil equivalent; "Bscf" means billions of standard cubic feet of gas; "P50" refers to a 50% chance of finding a given volume.

 

3. Batch drilling is to drill each well to a specific depth well above the reservoir interval, and then drill each of the four wells to the reservoir. This maximizes efficiencies.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCPJMJTMBBTBJT
Date   Source Headline
29th Nov 20167:00 amRNSBadile: Rig Contract Signature
25th Nov 20167:00 amRNSSuccessful £26.9 million Fundraising at Market
24th Nov 20164:30 pmRNSDirector/PDMR Shareholding
24th Nov 20167:13 amRNSUnderwritten Offers to Raise £24.1 million
24th Nov 20167:00 amRNSTendrara: TE-7 Post Stimulation Flow Rate
15th Nov 20169:11 amRNSInclusion in MSCI Small Cap Index
2nd Nov 20167:00 amRNSTendrara: TE-7 Pre Stimulation Flow Rate
31st Oct 20165:43 pmRNSTotal Voting Rights and Executive Appointment
13th Oct 20166:11 pmRNSExercise of Options and Issue of Equity
11th Oct 20167:00 amRNSDirector/PDMR Shareholding
7th Oct 20167:00 amRNSTendrara: TE7 Completion of Drilling & Log Results
3rd Oct 20163:00 pmRNSTotal Voting Rights
23rd Sep 20167:00 amRNSSidi Moktar Acquisition: Renegotiated Terms
20th Sep 20167:00 amRNSBadile: Commencement of Civil Works
19th Sep 20165:27 pmRNSBlock Admission
19th Sep 20167:00 amRNSTendrara: TE-7 Final Casing Point
15th Sep 20167:00 amRNSHalf-year Report
8th Sep 20167:00 amRNSTendrara: TE-7 Second Casing Point
2nd Sep 20167:00 amRNSInclusion in FTSE AIM UK 50 and Migration to SETS
1st Sep 20163:43 pmRNSBlock Admission Update and Total Voting Rights
31st Aug 20167:00 amRNSTendrara: TE-7 First Casing Point
26th Aug 20167:00 amRNSTendrara: TE-7 Drilling Commences
24th Aug 20167:00 amRNSExecutive Changes and Change of Registered Office
16th Aug 20163:21 pmRNSDirector/PDMR Shareholding
15th Aug 20164:05 pmRNSDirector/PDMR Shareholding
8th Aug 20166:01 pmRNSIssue of Options and Director/PDMR Shareholding
8th Aug 20163:40 pmRNSDirector/PDMR Shareholding
8th Aug 20167:01 amRNSTendrara: Gas Discovery
1st Aug 20163:00 pmRNSTotal Voting Rights
29th Jul 20164:42 pmRNSExercise of Options and Issue of Equity
27th Jul 20167:00 amRNSBadile: Schlumberger Investment
18th Jul 201612:00 pmRNSTendrara Update
11th Jul 20167:00 amRNSTendrara Update
7th Jul 20167:00 amRNSTendrara Development Funding
5th Jul 20169:38 amRNSDirector/PDMR Shareholding
1st Jul 201612:40 pmRNSTotal Voting Rights
29th Jun 20161:12 pmRNSResult of AGM
29th Jun 201611:02 amRNSDirectorate Change
21st Jun 201611:17 amRNSIssue of Bonds and Warrants
20th Jun 20167:00 amRNSTendrara and Meridja Update
2nd Jun 20165:34 pmRNSPosting of Annual Report and Notice of AGM
2nd Jun 20167:00 amRNSTendrara: Completion of Drilling
1st Jun 20161:49 pmRNSTotal Voting Rights
24th May 20167:00 amRNSFinal Results
24th May 20167:00 amRNSTendrara: Final Casing Point
16th May 20167:00 amRNSTendrara: Second Casing Point
16th May 20167:00 amRNSNervesa Update
11th May 20167:00 amRNSReceipt of Final Badile Drilling Approval
10th May 20167:00 amRNSHeads of Terms in respect of Bond Programme
3rd May 20165:38 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.