Ryan Mee, CEO of Fulcrum Metals, reviews FY23 and progress on the Gold Tailings Hub in Canada. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSOLO.L Regulatory News (SOLO)

  • There is currently no data for SOLO

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Upgrade to Portland OIP, Horse Hill-1 Discovery

19 Jul 2016 07:00

RNS Number : 5318E
Solo Oil Plc
19 July 2016
 

FOR IMMEDIATE RELEASE, 7:00 am 19 July 2016

 

SOLO OIL PLC

("Solo" or the "Company")

 

Upgrade to Portland Oil in Place, Horse Hill-1 Discovery, Weald Basin

 

Solo today notes the contents of an announcement by UK Oil and Gas Investments plc ("UKOG") that a new petrophysical analysis by Nutech, incorporating the findings of the successful Horse Hill-1 ("HH-1") flow tests, has significantly upgraded the previously calculated total oil in place ("OIP") per square mile within the Upper Portland pay zone at the HH-1 well, from 7.7 million barrels ("mmbbls") per square mile to 22.9 mmbbls per square mile, an increase of 200%. As previously announced the final Horse Hill 1 ('HH-1') Portland test flowed at a stable dry oil rate of 323 barrels of oil per day ('bopd').

Nutech's report notes that the production of dry oil from the Portland Sandstone, with little or no observed water production, required a reassessment of the pre-flow test petrophysical model. Prior to the flow test, interpretations suggested that water would likely be produced along with oil, as is seen in Portland reservoirs in nearby producing oil fields. The revised model fully incorporates the well test observations and measurements.

 

The HH-1 well is located within onshore exploration licence PEDL137, on the northern side of the Weald Basin near Gatwick Airport. PEDL246 lies adjacent to and immediately to the east of PEDL137. Solo owns a 6.5% interest in the Licences which are operated by Horse Hill Developments Ltd ("Operator").

The Operator has also informed the Company that the flow test data analysis undertaken by Nutech and Xodus provides the necessary technical encouragement to engage Barton Willmore Ltd, one of the UK's leading planning and environmental assessment practitioners, to prepare and submit a planning application to Surrey County Council ("SCC"), and to assist with obtaining necessary permissions from the Environment Agency ("EA"), for an appraisal programme at Horse Hill.

The applications will seek permission to conduct a programme consisting of the production flow testing of three Kimmeridge Limestone zones plus the overlying Portland over a total flow period of up to 360 days, plus two further appraisal/development wells and 3D seismic.

A public consultation and engagement process related to the planning application will take place shortly, leading to an application to SCC and the EA by early fourth quarter 2016.

Engineering studies to examine the range of possible flow rates from a planned horizontal side track well are ongoing. Data to further calibrate these studies will be acquired during the further planned extended flow tests.

 

 

Neil Ritson, Solo's Chairman commented:

"Significant progress is being made at Horse Hill building on the results of the very successful flow tests earlier in the year. Solo is pleased that the estimated oil in place has been increased and that the Horse Hill group is proceeding with the next phase of the appraisal of this important discovery."

As previously stated by the Company, the calculated OIP per square mile should not be construed as either contingent resources or reserves.

Qualified Person's Statement:

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chairman and Director of Solo Oil plc who has over 38 years of relevant experience in the energy sector. Mr. Ritson is a member of the Society of Petroleum Engineers, an Active Member of the American Association of Petroleum Geologists and is a Fellow of the Geological Society of London.

For further information:

Solo Oil plc

Neil Ritson

Fergus Jenkins

+44 (0) 20 3794 9230

 

 

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

+44 (0) 20 7628 3396

 

Shore Capital

Joint Broker

Pascal Keane

Jerry Keen (Corporate Broker)

 

Bell Pottinger

Public Relations

Henry Lerwill

 

Cassiopeia Services LLP

Investor Relations

Stefania Barbaglio

 

+44 (0) 20 7408 4090

 

 

 

 

 

+44 (0) 20 3772 2500

 

 

 

+44 (0) 79 4969 0338

 

 

Glossary: 

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

contingent resources

contingent resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations, but the applied project(s) are not yet considered mature enough for commercial development due to one or more contingencies. Contingent resources may include, for example, projects for which there are currently no viable markets, or where commercial recovery is dependent on technology under development, or where evaluation of the accumulation is insufficient to clearly assess commerciality. Contingent Resources are further categorized in accordance with the level of certainty associated with the estimates and may be sub-classified based on project maturity and/or characterized by their economic status

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to the surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate

oil field

an accumulation, pool or group of pools of oil in the subsurface. An oil field consists of a reservoir in a shape that will trap hydrocarbons and that is covered by an impermeable or sealing rock

oil in place

the quantity of oil or petroleum that is estimated to exist originally in naturally occurring accumulations before any extraction or production

petrophysics

the study of physical and chemical rock properties and their interactions with fluids utilising electric logs, physical rock and fluid measurements

reserves

those quantities of petroleum anticipated to be commercially recoverable by application of development projects to known accumulations from a given date forward under defined conditions; reserves must further satisfy four criteria: they must be discovered, recoverable, commercial and remaining (as of the evaluation date) based on the development project(s) applied; reserves are further categorized in accordance with the level of certainty associated with the estimates and may be sub-classified based on project maturity and/or characterised by development and production status

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEAFXPFSSKEAF
Date   Source Headline
31st Jul 20125:04 pmRNSTotal Voting Rights
26th Jul 20123:15 pmRNSIssue of Equity
2nd Jul 20127:00 amRNSRuvuma Independent Evaluation
29th Jun 20123:24 pmRNSIssue of Equity and TVR
28th Jun 20127:00 amRNSTanzania Test Results
22nd Jun 201211:37 amRNSIssue of Equity
21st Jun 20121:15 pmRNSNtorya-1 Testing, Tanzania
20th Jun 201212:54 pmRNSIssue of Options
18th Jun 20129:27 amRNSDrilling Report
18th Jun 20127:00 amRNSDrilling Report
31st May 20125:52 pmRNSTotal Voting Rights
18th May 201212:49 pmRNSIssue of Equity and TVR
30th Apr 20127:00 amRNSNtorya-1 Update
27th Apr 201212:27 pmRNSDirector's Dealings
12th Apr 20127:00 amRNSAusable EOR Project Update, Canada
11th Apr 20121:40 pmRNSNtorya-1 Update, Tanzania
5th Apr 20127:00 amRNSInvestment in Argentina
5th Apr 20127:00 amRNSInvestment in Argentina
3rd Apr 20127:00 amRNSDrilling Update, Canada
2nd Apr 20121:00 pmRNSDrilling Update Ntorya-1, Tanzania
30th Mar 20127:00 amRNSUnaudited Interim Results
26th Mar 20127:00 amRNSBoard Change
6th Mar 20127:00 amRNSOperational Update, Canada
2nd Mar 20127:00 amRNSAppointment of Joint Broker
29th Feb 20124:03 pmRNSTotal Voting Rights
28th Feb 20127:00 amRNSIssue of Equity
27th Feb 20127:00 amRNSDrilling Report
16th Feb 20127:00 amRNSOperational Update, Canada
10th Feb 20122:15 pmRNSNtorya-1 Drilling Update
7th Feb 20127:00 amRNSDrilling Report
1st Feb 20127:00 amRNSIssue of Equity
31st Jan 20123:16 pmRNSTotal Voting Rights
27th Jan 20127:00 amRNSDrilling Update
24th Jan 20127:00 amRNSOperational Update, Canada
10th Jan 20127:00 amRNSNtorya-1 Drilling Update
6th Jan 20127:00 amRNSIssue of Equity
3rd Jan 201210:33 amRNSCanadian Exploration and Development Update
30th Dec 20117:00 amRNSTotal Voting Rights
23rd Dec 201111:07 amRNSTanzania Drilling Update
16th Dec 20112:31 pmRNSUpdate Re Investment
16th Dec 20111:56 pmRNSResult of AGM
5th Dec 20117:00 amRNSTanzania Drilling Update
1st Dec 20117:56 amRNSDisposal of Argentine Subsidiary
1st Dec 20117:00 amRNSInvestment in Argentina
30th Nov 20117:00 amRNSReport and Accounts and Notice of AGM
25th Nov 20117:00 amRNSAdditional investment
21st Nov 20117:00 amRNSTanzania Drilling Update
10th Nov 20117:00 amRNSEquity Line Facility
7th Oct 20117:00 amRNSDrilling Report
6th Oct 201110:18 amRNSTanzania Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.