Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSHG.L Regulatory News (SHG)

  • There is currently no data for SHG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

New Luika Gold Mine, Ilunga Exploration Update

6 Jul 2016 07:00

RNS Number : 3420D
Shanta Gold Limited
06 July 2016
 

6 July 2016

Shanta Gold Limited

("Shanta Gold", "Shanta" or the "Company")

New Luika Gold Mine, Ilunga Exploration Update

Shanta Gold (AIM: SHG), the East Africa-focused gold producer, developer and explorer, is pleased to provide an update from its ongoing exploration programme within and surrounding its flagship asset, the New Luika Gold Mine ("NLGM" or "the Mine") located in the Lupa Goldfield, southwest Tanzania. 

As a follow up to the encouraging Phase 1 drilling programmme announced in April 2016, a second phase drilling programme has been completed at the Ilunga mineralised prospect ("Ilunga"), located within the active Mining Licence approximately 2.5 kilometres northeast of the NLGM central processing facility. Phase 2 has primarily targeted the strike extension of Ilunga to the west, reaching approximately 300 metres ("m") down-dip, and a vertical depth in excess of 200 m. A prior resource (2015) of 74,000 ounces ("oz") (Indicated & Inferred) incorporated the top 100 m down-dip from surface. Results from Phase 1 and Phase 2 will be incorporated into the existing model and a new resource estimate produced.

Highlights:

· The Phase 2 upgrade drilling programme, included 20 drill holes in total, all of which intersected visually distinctive mineralised zones confirming the continuity of Ilunga both along strike and at depth. Encouraging mineralised intersections achieved include:

o 13 m at 4.19 grammes per tonne ("g/t") gold from 80 m in hole CSR 482

§ Including 10 m at 5.3 g/t

o 2.06 m at 10.46 g/t gold from 265.5 m in hole CSD096

o 3.2 m at 40.64 g/t gold from 277.1 m in hole CSD096

o 8.3m at 1.97 g/t gold from 234.81 m in hole CSD098

§ Including 2.14 m at 4.58 g/t

o 1.38 m at 10.19 g/t gold from 130.96 m in hole CSD100

o 2.93 m at 18.62 g/t gold from 157.87 m in hole CSD 100

· Approximately 100 m additional strike expression to the west at depth has been identified; and

· Ilunga remains open at depth and down-plunge to the west.

Toby Bradbury, Chief Executive Officer, commented:

"Our exploration team has a good handle on mineralisation and structure, enabling efficient exploration to take place. Today's results from Ilunga confirm good tenor and thicknesses and we are looking forward to producing an updated resource estimate. Ilunga shows potential as a high grade underground deposit and we expect the Ilunga ounces to contribute to the ongoing reserve replacement at NLGM. It is also encouraging that mineralisation is still potentially open down-plunge to the west and this will be evaluated in due course"

Enquiries:

 

Shanta Gold Limited

Toby Bradbury (CEO)

Mark Rosslee (CFO)

+255 (0)22 2601 829

Nominated Adviser and Broker

Peel Hunt LLP

Matthew Armitt / Ross Allister / Chris Burrows

+44 (0)20 7418 8900

Financial Public Relations

Tavistock

Emily Fenton / Jos Simson

+44 (0)20 7920 3150

 

About Shanta Gold

Shanta is an East Africa-focused gold producer, developer and explorer. It currently has defined ore resources on the New Luika and Singida projects in Tanzania and holds exploration licences over a number of additional properties in the country. Shanta's flagship New Luika Gold Mine commenced production in 2012 and produced 81,873 ounces in 2015. For further information please visit: www.shantagold.com.

The technical information contained within this announcement has been reviewed and approved by Mr. Awie Pretorius MSc.Pri.Sci.Nat. Mr. Pretorius is a consultant to Shanta and a member of the South African Council for Natural Scientific Professionals (SACNASP Membership Number 400060/91).

He has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' and for the purposes of the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009.

Regional Exploration Update

Drilling at the Ilunga deposit forms part of the Company's commitment to a systematic programme of exploration focused on the optimisation and upgrade of known mineralised prospects within the NLGM mining licence, as well as exploration on tenements in the vicinity of NLGM currently held by the Company. Shanta is exploring all options to bring additional resources into its Base Case Mine Plan, announced 29 September 2015, including high grade underground deposits which are open at depth.

Ilunga Deposit

The drilling programme described in today's update has increased the definition of mineralisation in the western reaches at Ilunga to approximately 300 m down-dip, reaching a vertical depth in excess of 200 m. The recent work has refined the company's interpretative capacity with regard to the identification and geometry of westerly plunging high grade payshoots.

Phase 2 drilling illustrated that a single payshoot of limited lateral extent identified in the eastern portion of the mineralised prospect displays a shallow westerly plunge, and that the remainder of the eastern expression of the Ilunga Prospect hosts limited mineralisation potential at depth. Phase 2 also confirmed earlier interpretations that further high grade potential at Ilunga exists at depth and to the west, adjacent to a truncating structural deformational feature. Company geologists have refined the orientation and geometry of a western truncating fault and plan follow-up work targeting a structurally-displaced extension to mineralisation west of Ilunga.

The feasibility of future underground mining potential at Ilunga will be investigated once re-modelling and resource estimation programs are concluded.

 

Table 1: Mineralised Intersections1 

BHID

From

To

Sample No.

Au AVE

Width (m) 2

Au (ppm) 3

CSR477

76

77

293072

0.53

3.00

0.64

77

78

293073

0.29

78

79

293074

1.10

CSR482

80

81

293545

1.36

13.00

4.19

81

82

293546

0.70

82

83

293547

0.16

83

84

293548

7.97

84

85

293549

20.25

85

86

293550

10.95

86

87

293552

5.93

87

88

293553

1.39

88

89

293554

2.34

89

90

293555

2.04

90

91

293557

0.06

91

92

293558

0.17

92

93

293559

1.12

CSR483

97

98

293650

0.68

4.00

0.54

98

99

293652

0.42

99

100

293653

0.38

100

101

293654

0.69

CSD090

132.52

132.97

684273

0.58

1.88

0.72

132.97

133.56

684274

0.43

133.56

134.05

684275

0.89

134.05

134.40

684276

1.15

AND

CSD090

140.58

140.95

684294

1.39

0.37

1.39

CSD091

141.77

142.27

684341

1.19

1.16

1.00

142.27

142.60

684342

0.63

142.60

142.93

684343

1.09

AND

CSD091

156.02

156.50

684361

1.48

0.92

1.04

156.50

156.94

684362

0.57

CSD092

161.86

162.28

684427

0.53

0.42

0.53

AND

CSD092

163.15

163.52

684430

0.60

1.04

0.54

163.52

163.85

684431

0.57

163.85

164.19

684432

0.45

CSD093

186.44

186.90

684474

6.17

0.46

6.17

CSD094

196.53

196.76

684490

0.98

2.37

0.66

196.76

197.20

684491

1.34

197.20

197.71

684492

0.35

197.71

198.07

684493

0.38

198.07

198.62

684495

0.45

198.62

198.90

684496

0.62

CSD095

256.86

257.10

684595

20.50

3.00

2.64

257.10

257.41

684596

4.08

257.41

257.85

684598

0.45

257.85

258.44

684599

0.66

258.44

258.95

684600

0.23

258.95

259.54

684601

0.38

259.54

259.86

684602

2.56

AND

CSD095

272.05

272.29

684628

8.31

0.24

8.31

CSD096

265.50

265.97

684682

1.24

2.06

10.46

265.97

266.40

684683

9.93

266.40

266.90

684684

29.10

266.90

267.25

684685

5.07

267.25

267.56

684686

1.17

AND

CSD096

274.25

274.82

684705

0.81

1.71

0.65

274.82

275.10

684706

0.80

275.10

275.43

684707

0.51

275.43

275.96

684708

0.49

AND

CSD096

277.10

277.35

684713

27.85

3.20

40.64

277.35

277.64

684714

88.75

277.64

277.90

684715

2.54

277.90

278.17

684716

320.00

278.17

278.59

684718

1.57

278.59

279.10

684719

1.84

279.10

279.50

684720

3.74

279.50

279.98

684721

9.43

279.98

280.30

684722

8.32

AND

CSD096

292.59

293.05

684754

0.77

1.64

1.09

293.05

293.42

684755

0.78

293.42

293.78

684756

1.32

293.78

294.23

684758

1.50

AND

CSD096

309.07

309.50

684894

0.59

1.04

1.10

309.50

310.11

684895

1.46

AND

CSD096

315.00

315.28

684909

1.28

0.28

1.28

AND

CSD096

317.77

318.14

684917

5.20

0.37

5.20

CSD097

282.06

282.50

685174

2.19

0.44

2.19

AND

CSD097

312.50

312.94

685244

1.27

0.44

1.27

CSD098

214.09

214.43

684804

4.09

1.95

1.74

214.43

214.96

684805

0.93

214.96

215.54

684806

1.74

215.54

216.04

684807

1.01

AND

CSD098

234.81

235.24

684851

2.71

8.30

1.97

235.24

235.75

684852

6.08

235.75

236.35

684853

0.69

236.35

236.95

684855

8.53

236.95

237.37

684856

0.18

237.37

237.67

684857

0.84

237.67

238.16

684858

0.31

238.16

238.68

684859

0.65

238.68

239.25

684861

0.50

239.25

239.75

684862

0.31

239.75

240.12

684863

5.89

240.12

240.44

684864

2.64

240.44

241.07

684865

0.89

241.07

241.62

684866

0.81

241.62

242.12

684867

0.65

242.12

242.57

684868

0.61

242.57

243.11

684869

1.19

CSD099

187.19

187.39

685359

1.20

1.52

2.90

187.39

187.58

685360

1.97

187.58

187.77

685362

1.50

187.77

187.97

685363

10.31

187.97

188.27

685364

2.21

188.27

188.71

685365

1.80

CSD100

130.96

131.28

685408

36.65

1.38

10.19

131.28

131.43

685409

11.90

131.43

131.90

685410

0.61

131.90

132.34

685411

0.59

AND

CSD100

157.87

158.10

685432

14.40

2.93

18.62

158.10

158.46

685433

23.20

158.46

158.86

685434

68.80

158.86

159.36

685435

15.30

159.36

159.72

685436

1.41

159.72

159.88

685438

2.52

159.88

160.18

685439

2.69

160.18

160.44

685440

2.44

160.44

160.80

685441

14.95

 

1 See link for accompanying plan of drill hole locations and cross-sections http://www.rns-pdf.londonstockexchange.com/rns/3420D_-2016-7-5.pdf 

2 All holes were drilled at inclinations of -50o to -60o into a sub-vertical mineralised zone 

3 No top-cut applied

 

This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.

ENDS

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBELLBQDFBBBQ
Date   Source Headline
21st Oct 20147:00 amRNSDirectors Dealings
20th Oct 20147:01 amRNSQ3 2014 PRODUCTION AND OPERATIONAL UPDATE
20th Oct 20147:00 amRNSUpdated Resource & Reserve for New Luika Gold Mine
10th Oct 20144:00 pmRNSDirectors Dealings
19th Sep 20147:00 amRNSDirectors Dealings
12th Sep 20149:03 amRNSDirectors Dealings
3rd Sep 20141:18 pmRNSDirectors Dealings
2nd Sep 20147:00 amRNSDirectors Dealings
1st Sep 20147:00 amRNSInterim Results
21st Jul 20147:00 amRNSQ2 2014 Production and Operational Update
1st Jul 20147:00 amRNSOperational Update
30th May 201411:57 amRNSResult of AGM
22nd May 20147:00 amRNSDirectors Dealings
14th May 20147:00 amRNSChange To Management Reward Structure
14th May 20147:00 amRNSDirectors' Interests & Total Voting Rights
7th May 20144:39 pmRNSPosting of Report & Accounts and Notice of Annual
28th Apr 20147:00 amRNSQ1 Production & Operational Update
22nd Apr 20147:01 amRNSFinal Results
14th Apr 20143:36 pmRNSHolding(s) in Company
20th Mar 20147:00 amRNSChange of Advisers
17th Mar 201411:36 amRNSHolding(s) in Company
24th Feb 20141:55 pmRNSDirector/PDMR Shareholding - Replacement
20th Feb 20142:33 pmRNSDirectors Dealings
29th Jan 20147:00 amRNSMaiden Reserve at Singida Gold Mining Project
22nd Jan 201410:43 amRNSHolding(s) in Company
20th Jan 20147:00 amRNSQ4 2013 Production and Operational Update
16th Jan 20147:00 amRNSUpdated Resource & Reserve for New Luika Gold Mine
9th Jan 20147:00 amRNSQ4 2013 Production Update
23rd Dec 20137:00 amRNSAppointment of Non-Executive Director
13th Dec 20138:59 amRNSDirectors Dealings
11th Nov 201312:32 pmRNSDirectors Dealings
30th Oct 20137:00 amRNSDirectors Dealings
21st Oct 20133:51 pmRNSInvestor Presentation
21st Oct 20137:01 amRNSMaiden Reserve at New Luika Gold Mine
21st Oct 20137:00 amRNSQ3 2013 Production and Operational Update
14th Oct 20139:03 amRNSDirectors Dealings
11th Oct 20133:38 pmRNSHolding(s) in Company
11th Oct 201312:43 pmRNSHolding(s) in Company
11th Oct 20137:57 amRNSDirectors' Interests and Total Voting Rights
30th Sep 20135:27 pmRNSResult of EGM
19th Sep 201312:05 pmRNSDirectors Dealings
18th Sep 20134:13 pmRNSDirectors Dealings
18th Sep 20137:00 amRNSDrill Results at New Luika Gold Mine
17th Sep 20137:00 amRNSInterim Results
11th Sep 20137:00 amRNSNotice of EGM
30th Aug 20137:00 amRNSSuccessful Debt Restructuring
1st Aug 20133:07 pmRNSHolding(s) in Company
29th Jul 20137:00 amRNSAppointment of Non-Executive Director
22nd Jul 20137:00 amRNSQ2 2013 Production Report and Operational Update
9th Jul 201312:19 pmRNSHolding(s) in Company - Replacement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.