focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSGZ.L Regulatory News (SGZ)

  • There is currently no data for SGZ

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

June Quarterly Report

29 Jul 2010 09:14

RNS Number : 1416Q
Scotgold Resources Ltd
29 July 2010
 



 

Scotgold Resources Limited ("Scotgold" or the "Company")

 

JUNE 2010 QUARTERLY REPORT

 

CONONISH GOLD AND SILVER PROJECT

 

·; HIGH GRADE INTERSECTIONS FROM INFILL AND EXTENSION DRILLING RESULTS INCLUDING:

o Con 10 02 - 15.82g/t Au, 52.6g/t Ag over 1.41m

o Con 10 05 - 5.00g/t Au, 22.8g/t Ag over 6.16m (including 14.82 g/t Au, 55.5g/t Ag over 2.15m)

o EA 02 - 7.84g/t, 12.2g/t Ag over 2.25m

·; Progress to production decision

o Revised date for planning permission decision - anticipated 18 August

o AMC commissioned to update Studies to higher accuracy

 

 

GRAMPIAN GOLD PROJECT UPDATE

 

·; Beinn Udlaidh PROSPECT

o Ground magnetic survey completed over selected pipes

o Further litho-geochemical sampling completed

o Eight AQ holes on Beinn Udlaidh pipes and vein completed

·; Auch / Allt Kinglass PROSPECTS

o Three AQ holes completed

o Further litho-geochemical sampling completed

 

 

 

CONONISH GOLD AND Silver project

Infill and Eastern Extension Drilling

Scotgold has completed the first phase of its Infill and Eastern Extension drilling program at the Cononish gold and silver project.

Infill drilling into the main vein within the Inferred Resource envelope above the 400 metre level continued to encounter high grades and excellent widths of gold and silver mineralization in most cases.

Drilling results from the Eastern Extension encountered additional mineralization below the 400 metre level, where a westerly plunging payshoot may extend over 300 metres beyond the eastern boundary of the previously defined JORC resource. Further drilling in this area is hampered by extreme topography and will be followed up from underground.

Drilling results are shown in Table 1 and Table 2 for Infill and Eastern Extension results respectively. Drill statistics are shown in Appendix A.

Underground holes EA UG 03 and 02 were drilled to test the possible extension of the high grade vein (the 'adit' vein) encountered in the adit. The results indicate vein continuity with encouraging values and warrants further investigation at a later stage.

Table 1: Resource Infill Drilling Results

Hole

From

(m)

To

(m)

Downhole

intersection (m)

Est. true thickness (m)

Au g/t

Ag g/t

Comment

Con 09 01

103.95

106.00

2.05

1.98

9.84

41.6

Main Vein intersection

Con 10 02

103.00

104.50

1.50

1.41

15.82

52.5

Main Vein intersection

Con 10 02a

126.90

127.25

0.35

0.31

0.39

42.4

Main Vein Sheared, dyke

Con 10 05

67.24

83.75

11.04

6.16

5.09

22.8

Mineralised intersection

Including

66.24

70.46

4.22

2.35

2.55

7.2

Upper vein

and

79.15

83.00

3.85

2.15

14.82

55.5

Main vein intersection

 

Table 2: Eastern Extension Drilling Results:

Hole

From

(m)

To

(m)

Downhole

intersection (m)

Est. true thickness (m)

Au g/t

Ag g/t

Comment

EA 01

49.30

51.60

2.30

1.99

2.68

1.8

Main vein intersection

 

EA 02

 

Including

 

60.40

 

60.40

63.00

64.00

 

60.65

64.00

3.60

 

0.25

1.00

2.25

 

0.18

0.72

7.84

 

28.35

15.67

12.2

 

16.6

33.8

Main vein intersection

EA 03

46.73

47.30

0.57

0.52

3.67

4.8

Main vein intersection

E

EA 04

62.80

65.00

2.20

1.58

0.94

1.4

Out of payshoot?

EA 05

112.6

113.15

0.55

0.25

0.54

0.5

Out of payshoot?

EA 06

74.92

76.00

1.08

0.68

1.24

Out of payshoot?

EA UG 03

2.50

3.00

0.50

5.16

3.4

'Adit' vein

EA UG 02

0.50

1.00

0.50

7.50

5.4

'Adit' vein

 

Progress towards Production Decision

Scotgold commissioned Australian Mining Consultants ("AMC") to update critical components of the Cononish Scoping study to improved levels of accuracy.

The study is expected to be available in August and will enable the Company to finalise development options for the project leading to a production decision. Subject to certain project milestones, including grant of planning permission and financing for the project, Scotgold anticipates first gold production in late 2011.

AMC will review and update the mining development and production schedule and mining capital and operating costs (with a target +/-15% accuracy) based on recent additions to the resource at Cononish (see ASX and AIM Release 5 February 2010 - Cononish Drilling and JORC Update). 

The study will also be updated with work completed since the 2009 study in the areas of processing, tailings disposal and infrastructure to similar levels or better levels of accuracy and review the financial model including gold price forecasts.

Scotgold recently commissioned Gekko Systems Pty ("Gekko") to complete a Definitive Costing Study (+/- 10% accuracy) for the Cononish project processing plant. Gekko and Scotgold's metallurgical consultant recently finalised the proposed flowsheet and Gekko will proceed to complete the study based on the agreed flowsheet.

The flowsheet encompasses two stages of crushing, milling followed by a gravity recovery section and subsequent flotation. Concentrates from both the gravity and flotation process will be combined and reground to maximize recovery of 'free gold' and to reduce the mass of concentrate required to be transported for further processing.

The study is due to be completed shortly.

A final metallurgical sample has been processed in accordance with the agreed flowsheet to confirm the recoveries to be used in the AMC study.

AMEC Earth and Environmental (AMEC) has completed a feasibility level design for the Tailings Management Facility for the Cononish project. The design provides for a facility to retain 0.8Mt of tailings to cater for possible future extensions to resources at Cononish and is designed in accordance with all applicable EU and UK legislation. The design is undergoing costing for input to the revised study.

Revised Date for Planning Permission Decision

Scotgold lodged its application for planning permission on 25 January 2010. In response to recently introduced legislation and also the requests for further information from the Planning Authority, Scotgold submitted further documentation in early June. This submission required further advertisement and consultation with statutory and other consultees. The Planning Authority has indicated a decision date of 18 August for the application.

 

GRAMPIAN GOLD PROJECT EXPLORATION UPDATE

Beinn Udlaidh breccia pipes

An initial systematic litho-geochemical rock chip sampling program was conducted over the Beinn Udlaidh breccia pipefield for characterization in order to prioritize follow up work.

A number of small diameter AQ holes were drilled into Pipes BU 12, BU 22 and BU 13. Results are awaited

A hand held magnetic survey was recently completed by Aurum Exploration Services Ltd over selected areas of the Beinn Udlaidh breccia pipe field and interpretation is ongoing.

Beinn Udlaidh vein

Further rock chip outcrop sampling was carried out over the possible extension to the Beinn Udlaidh vein.

Four small diameter AQ holes were drilled into the possible extension of the vein, results are awaited.

Auch

Three small diameter AQ drillholes were drilled into a vein occurrence and results are awaited.

Further litho-geochemical rock chip sampling was conducted in the area.

Regional

Further rock chip sampling was carried out on occurrences identified by previous explorers, results are awaited.

 

For further information:

 

United Kingdom:

Scotgold Resources Limited

Westhouse Securities Limited

Bankside Consultants

Chris Sangster (CEO)

Richard Baty / Petre Norton

Simon Rothschild / Oliver Winters

Tel: +44 (0)1838 400 306

Tel: +44 (0)20 7601 6100

Tel +44 (0)20 7367 8888

 

Australia:

Scotgold Resources Limited

Professional Public Relations

Shane Sadleir

(Non-Executive Director)

Karen Oswald

Tel: +61 (8) 9428 2950

Mobile: +61 (0) 411 704 498

Tel: +61 (8) 9388 0944

Mobile: +61 (0) 423 602 353

 

 

Competent Persons Statement:

 

The information in this report that relates to Exploration Results is based on information compiled by Mr David Catterall. Pr Sci Nat, who is a member of the South African Council for Natural Scientific Professions. Mr Catterall is employed as a consultant to Scotgold Resources Ltd. Mr Catterall has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Catterall consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

.Forward Looking Statements:

 

This release includes certain "forward looking statements." All statements, other than statements of historical fact, are forward looking statements that involve various risks and uncertainties.

There can be no assurances that such statements will prove accurate and actual results and future events could differ materially from those anticipated in such statements.

 

 

 

Appendix A: Drill Statistics

Hole ID

Easting

Northing

Depth(m)

Elevation(m)

Azimuth

Inclination

Core

09 - 01

228918

728277

114.8

558

322

-45

NQ

10 - 02

228871

728247

117.8

562

317

-50

NQ

10 - 02a

228871

728247

142.5

562

306

-66

NQ

10 - 05

228641

728049

91.7

565

327

-77

NQ

EA 01

229094

728454

102.0

405

326

-45

NQ

EA 02

229094

728454

105.5

405

326

-65

NQ

EA 03

229125

728471

62.0

404

315

-43.5

NQ

EA 04

229125

728471

74.4

404

315

-66

NQ

EA 05

229125

728471

129.0

404

299

-80

NQ

EA 06

229156

728500

80.5

397

294

-68

NQ

EA UG 03

229098

728556

16.0

400

316

0

AQ

EA UG 02

229114

728574

9.0

400

316

0

AQ

 

 

 

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEAPXNAFAEEEF
Date   Source Headline
27th Dec 20237:00 amRNSCancellation - Scotgold Resources Limited
24th Nov 202310:09 amRNSAppointment of Administrators
22nd Nov 20237:00 amRNSPlanned Appointment of Administrators
8th Nov 20237:00 amRNSDirector Resignation
7th Nov 20238:00 amRNSPotential Administration Appointment
16th Oct 20237:00 amRNSUpdate On Financing Discussions
2nd Oct 202310:18 amRNSPotential Administration Appointment
29th Sep 20237:00 amRNSCorporate Update
19th Sep 20239:10 amRNSMining Review Update
11th Sep 20237:30 amRNSSuspension - Scotgold Resources Limited
11th Sep 20237:00 amRNSGeological review, mine plan and operations update
10th Jul 20237:00 amRNSProduction, Sales & Operations – Q2 2023 & H1 2023
14th Jun 20237:00 amRNSBoard Appointment
7th Jun 20237:00 amRNSInterim CEO Appointment
1st Jun 20237:00 amRNSOperational Update and Director Resignation
15th May 20237:00 amRNSSubscription and Open Offer GBP2 million raised
26th Apr 20237:00 amRNSPosting of Circular
21st Apr 20237:00 amRNSSubscription & Open Offer to raise £1.5-2.0m
5th Apr 20237:00 amRNSOfftake advance & commencement long hole stoping
31st Mar 20234:35 pmRNSPrice Monitoring Extension
30th Mar 20237:00 amRNSInterim Results
27th Mar 20234:35 pmRNSPrice Monitoring Extension
27th Mar 20232:05 pmRNSSecond Price Monitoring Extn
27th Mar 20232:00 pmRNSPrice Monitoring Extension
27th Mar 202311:06 amRNSSecond Price Monitoring Extn
27th Mar 202311:00 amRNSPrice Monitoring Extension
27th Mar 20239:05 amRNSSecond Price Monitoring Extn
27th Mar 20239:00 amRNSPrice Monitoring Extension
27th Mar 20237:00 amRNSOperations and Corporate Update
16th Feb 20237:00 amRNSResult of Retail Offer - Capital Raising of £3m
10th Feb 202311:05 amRNSSecond Price Monitoring Extn
10th Feb 202311:00 amRNSPrice Monitoring Extension
10th Feb 20239:05 amRNSSecond Price Monitoring Extn
10th Feb 20239:00 amRNSPrice Monitoring Extension
10th Feb 20237:00 amRNSResults of Capital Raise
9th Feb 20235:00 pmRNSRetail Offer
9th Feb 20234:42 pmRNSProposed Capital Raising
7th Feb 20239:00 amRNSPrice Monitoring Extension
31st Jan 20239:05 amRNSSecond Price Monitoring Extn
31st Jan 20239:00 amRNSPrice Monitoring Extension
30th Jan 20239:05 amRNSSecond Price Monitoring Extn
30th Jan 20239:00 amRNSPrice Monitoring Extension
20th Jan 20232:05 pmRNSSecond Price Monitoring Extn
20th Jan 20232:00 pmRNSPrice Monitoring Extension
19th Jan 20232:15 pmRNSResults of 2022 Annual General Meeting
19th Jan 20237:00 amRNSQ4 2022 Results and 2023 Outlook
29th Dec 20221:00 pmRNSNotice of AGM
21st Dec 20227:00 amRNSPre-close Q4 2022 – Production Update
21st Dec 20227:00 amRNSFinal Results
19th Dec 20227:00 amRNSIssue of Equity and Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.