Operational Update

23 Sep 2009 07:00

RNS Number : 5008Z
Regal Petroleum PLC
23 September 2009
 



Regal Petroleum plc

("Regal" or the "Company")

23rd September 2009

OPERATIONAL UPDATE

Regal, the AIM-listed (RPT) oil and gas exploration and production group, is pleased to provide an update on its drilling programme in Ukraine where the Company is developing the Mekhediviska Golotvshinska (MEX-GOL) and Svyrydivske (SV) gas and condensate fields.

MEX-106 testing and production

MEX-106, the first new generation well, was drilled to a total measured depth of 6,020 metres and passed through Carboniferous B-sand (Visean) and T-sand (Tournaisian) intervals. It also penetrated Devonian D-sand intervals toward the bottom of the well.

The main objective of the well was to develop the primary production of the B-sand sequence. An aggregate of 55 metres of B-sand perforations (B20, B22 and B23 layers) have been completed between depths of 4,800 and 5,250 metres, accessing 33 metres net reservoir as defined by wireline logs.The secondary objective of the well was to appraise potential reservoirs in the T-sand interval encountered between depths of 5,537 and 5,830 metres. Based on the log response, an aggregate of 16 metres of T-sand perforation intervals (T1, T2, T3 and T4 layers) have been identified to access 11 metres of net reservoir.

The wireline logs of the Devonian section between 5,830 metres and the bottom of the well at 6,020 metres define an aggregate of 31 metres of D-sand perforation intervals (D3 layer) to access 27 metres of net reservoir.

The well has been completedhooked up and the production test programme is underway. The B22 and B23 sections were opened to flow on the 11th of September, and a mixture of reservoir gas and completion fluid (diesel) was recovered to surface before the well stopped flowing when the completion brine column reached the surface. Nitrogen lift was therefore deployed using coiled tubing late on 18th September and MEX-106 commenced flowing naturally to the flare on 20th September. On 21st September, the B22-B23 production stream was diverted to flow gas and water through the test separator. It is estimated that a further 4 to 5 days flow will be required to fully unload and clean-up the well bore to then provide a stable rate. The unloading will remove the backpressure exerted by the weight of the fluid in the borehole that is acting on the reservoir and constraining gas flow. This in turn should allow gas production to develop towards the expected rate for the B22-B23.

The B20 interval will be added to the production stream by opening downhole access equipment, and further well intervention activities will then be conducted to enable the testing and perforation programme to continue to determine the relative proportion of the gross production attributable to each of the B-sand, T-sand and D-sand flowstreams. 

An update on this well's aggregate production will be provided once the above operations have been completed.SV-58 completion and hook-up

The second of the new generation wells, SV-58, has been drilled to a measured depth of 6,309 metres. The well has been logged and the final liner section is being run prior to completion. SV-58 was spud on 26th February 2009 in the SV field adjacent to the MEX-GOL field and penetrated the B-, and T-sand sequences essentially as expected, in addition to the D-sand.

The well also encountered a newly discovered limestone reservoir (the "B24 limestone") which delivers production from an offset field to the west of Regal's licences. Log data have identified 20 metres of net reservoir planned for perforation in the B24 interval 5,498 - 5,581 metres. From a depth of 5,498 metres, near the top of the B24 limestone, Regal's well engineering team have had to cope with gas influx into the well bore during drilling operations on several occasions. The well has kicked twice and each gas influx has had to be circulated out to stabilise the well in order to maintain safe control of the gas and well. These essential operational procedures will inevitably result in a delay to the start-up of this challenging well beyond the planned date of end October.

Nevertheless, target depth has been safely reached, and the lower section logged down to 6,003 metres which denotes the top of the T4 sand. The base of the T5 objective is located at 6,124 metres, and the D3 interval was encountered from 6,124 metres to the bottom of the well at 6,309 metres.On 20th September, the well had to be closed in again owing to an additional gas influx. SV-58 appears promising, but the well has shown higher than anticipated pressure to date and thus requires significant operational maintenance. The well is now moving into its completion, test and production hook-up phase and an update on this well will be provided once this critical phase has been completed.

SV-61 drilling

The third new generation well, SV-61, was spud on 5th September 2009 and Rig 5914 has made good progress to its present depth of 2,203 metres. This rapid progress is a direct result of the learning curve effects from drilling MEX-106 and SV-58, and will deliver savings in both cost and time.SV-66 drilling preparation

The location site of the fourth new generation well, SV-66, is close to readiness to accept Rig 5915 once it has completed the SV-58 operation.

David J Greer, CEO of Regal, commented:

"We are pleased that our team is meeting its significant operational challenges safely, while applying all lessons learned during the course of drilling MEX-106 and SV-58, in order to deliver both production growth and savings in drill time and cost. 

We are especially pleased to have encountered and appraised the B-sand reservoir as planned, and to have confirmed upside potential in the T-sand as well as the newly discovered D-sand and B24 limestone sequences which have hitherto not been tested in our licences.

The gas encountered in SV-58 appears potent and, whilst encouraging, it must continue to be treated with the highest degree of safety awareness throughout the ongoing well completion and testing phase to determine its deliverability and commerciality".

For further information, please contact:

Regal Petroleum plc Tel: 020 7408 9500

David J Greer, CEO

Strand Partners Limited Tel: 020 7409 3494 

Simon Raggett / Rory Murphy

Mirabaud Securities Tel: 020 7878 3362

Peter Krens / Pav Sanghera

Citigate Dewe Rogerson Tel: 020 7638 9571

Media Enquiries: Martin Jackson

Analyst Enquires: Emma Woollaston

Ronan McElroy, PhD Geology, SPE, Chief Technologist of Regal Petroleum plc, has reviewed and approved the technical information contained within this press release in his capacity as a qualified person, as required under the AIM Rules.

Definitions:

Metres All thicknesses and depths rounded to the nearest whole metre

m3 standard cubic metres

m3/d cubic metres per day

psi  pounds per square inch

in inch

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFGGZLMZGGLZZ
Date   Source Headline
28th May 20202:35 pmRNSChange of Company Name
27th May 20207:00 amRNSChange of Name
22nd May 20207:00 amRNSSV-54 Well Results
15th May 20204:36 pmRNSPrice Monitoring Extension
15th Apr 20207:00 amRNSUkraine Update
9th Apr 20207:00 amRNS2019 Audited Results
6th Apr 20204:40 pmRNSSecond Price Monitoring Extn
6th Apr 20204:35 pmRNSPrice Monitoring Extension
1st Apr 20207:00 amRNSTermination of Memorandum of Understanding
24th Mar 20203:26 pmRNSAcquisition of Assets in Ukraine
10th Jan 20207:01 amRNSUkraine Update
30th Dec 20194:35 pmRNSPrice Monitoring Extension
26th Nov 20197:00 amRNSPotential Acquisition of Assets in Ukraine
17th Oct 20197:00 amRNSSpud of SV-54 Well
10th Oct 20197:00 amRNSUkraine Update
9th Oct 20197:00 amRNSAppointment of Broker
8th Oct 20197:00 amRNSResults of MEX-119 Well
13th Sep 20197:00 amRNSInterim Results
27th Aug 20197:00 amRNSAmendment Agreed for Gas Sales to Related Party
21st Aug 20197:00 amRNSReserves & Resources Update
5th Jul 20197:00 amRNSUkraine Update
26th Jun 20192:07 pmRNSResult of AGM
21st Jun 20197:00 amRNSIncrease in Shareholding of Majority Shareholder
21st Jun 20197:00 amRNSStandard form for notification of major holdings
21st Jun 20197:00 amRNSNotification of Major Interest in Shares
21st Jun 20197:00 amRNSNotification of Major Interest in Shares
6th Jun 20193:18 pmRNSManagement Appointments
3rd Jun 20197:00 amRNSPosting of Annual Report and Notice of AGM
30th May 20194:35 pmRNSPrice Monitoring Extension
20th May 20197:00 amRNSNotification of Major Interest in Shares
20th May 20197:00 amRNSNotification of Major Interest in Shares
1st May 20197:00 amRNS2018 Audited Results - Amendment
30th Apr 20197:00 amRNSFull Year Results
4th Apr 20197:00 amRNSUkraine Update
19th Mar 20193:54 pmRNSVAS Licence Order Update
12th Mar 20192:38 pmRNSVAS Licence Order
28th Feb 201911:37 amRNSHolding(s) in Company
21st Feb 20197:00 amRNSSpud of MEX-119 Well
9th Jan 20197:00 amRNSUkraine Update
12th Dec 20187:30 amRNSShareholding Restructure by Majority Shareholder
12th Dec 20187:00 amRNSHolding(s) in Company
12th Dec 20187:00 amRNSHolding(s) in Company
6th Dec 201812:02 pmRNSPrice Monitoring Extension
5th Dec 20187:00 amRNSVAS-10 Well Testing Update
30th Nov 201812:07 pmRNSSecond Price Monitoring Extn
30th Nov 201812:02 pmRNSPrice Monitoring Extension
28th Nov 20184:40 pmRNSSecond Price Monitoring Extn
28th Nov 20184:35 pmRNSPrice Monitoring Extension
21st Sep 20183:21 pmRNSHolding in Company
21st Sep 20187:00 amRNSInterim Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.