The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksROSN.L Regulatory News (ROSN)

  • There is currently no data for ROSN

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling in the Kara Sea Started

11 Aug 2014 07:00

RNS Number : 7417O
OJSC OC Rosneft
11 August 2014
 



Rosneft and ExxonMobil Start Drilling in the Kara Sea

Rosneft and ExxonMobil joint venture company Karmorneftegaz began drilling of Universitetskaya-1, the Russian Federation's northernmost well using the West Alpha rig.

The start of the drilling was launched by Russian President Vladimir Putin during a teleconference with head of Rosneft Igor Sechin and head of ExxonMobil Russia Glenn Waller who were both present in the Kara Sea. Special representative of President of the Russian Federation on international cooperation in the Arctic and Antarctic, member of the Board of Directors of Rosneft Artur Chilingarov and North Atlantic Drilling representative Jan Tore Theimann also took part in the ceremony.

"The start of exploratory drilling in the Kara Sea is the most important event of the year for the global oil and gas industry. As a result of this work we are planning to discover a new Kara sea oil province. Developing of the Arctic shelf has a huge multiplicative effect on the whole Russian economy" - said Igor Sechin.

The West Alpha rig was provided by the Norwegian company North Atlantic Drilling which signed long-term agreements with Rosneft on 30 July 2014 for the offshore drilling. West Alpha was transported via the Barents, Pechora and Kara Seas and installed on the drilling site of the East Prinovozemelskiy-1 License Area in the Kara Sea. The drilling rig made the way of over 1900 nautical miles to reach its destination. The rig is 30,700 tons in deadweight, 70 m long, 66 m wide, the derrick hangs 108.5 meters over the main deck, and it drafts during drilling for 21.5 m.

The rig is held on the drilling site by an 8-anchor positioning system, which provides advanced stability for the rig. Most of the platform is outside the reach of waves, which are no impediment for the rig's operation. The maximum drilling depth of West Alpha is 7 km. The drilling will continue for two months.

Rosneft and ExxonMobil experts spent several months preparing the rig for the Kara Sea drilling operation. West Alpha was upgraded to improve the overall reliability of its main and supplementary equipment and for all systems to be ready for low temperatures, including, most importantly, life support and evacuation systems.

The rig is equipped with an innovative system for the monitoring of ice condition, icebergs detection and tracking of sea ice. It uses infrared cameras and modern onboard radars, and analyzes satellite and air intelligence data.

To make sure West Alpha can operate safely in severe ice conditions, Rosneft and ExxonMobil developed a unique iceberg collision prevention plan. It even includes applying physical action to the ice. Should experts suspect a hummock or floe can damage the rig, special support vessels will tow it away to a safe distance. If physical action is impossible, the system will isolate the well in a way that is harmless for the environment, and the rig will transfer to a safer location. The rig is equipped with two groups of blowout preventers and an enhanced subsea shut-in device.

 

NOTES FOR EDITORS:

The Universitetskaya structure covers an area of 1200 thousand kilometers with a 550 m high hydrocarbon trap. Its resources account to more than 1.3 billion tons of oil equivalent. A total of some 30 structures were found in three East Prinovozemelskiy areas of the Kara Sea, and the entire resource base of the three areas is estimated at 87 billion barrels or 13 billion tonnes of oil equivalent.

According to expert opinion the Kara sea oil province will exceed in terms of resources volume such oil and gas provinces as Gulf of Mexico, Brazilian shelf, Arctic shelf of Alaska and Canada and is comparable with the current resource base of Saudi Arabia.

 The sea depth at the drilling site is 81 m, and the designed depth of the vertical well is 2350 m from the rotary table. An Environmental Impact Assessment, an Oil Spill Response Plan and other pieces of project documentation were developed and approved by regulatory authorities for the project to proceed. The operations were preceded by public consultations, a State Environmental Expertise and a Main State Expertise.

Rosneft and ExxonMobil are also working on the implementation of the approved strategy regarding other joint projects.

 

Rosneft Information Division

tel.: +7 (499) 517-88-97

August 11, 2014

 

 

 

These materials contain statements about future events and expectations that are forward-looking in nature. Any statement in these materials that is not a statement of historical fact is a forward-looking statement that involves known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements expressed or implied by such forward-looking statements to differ. We assume no obligations to update the forward-looking statements contained herein to reflect actual results, changes in assumptions or changes in factors affecting these statements.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEASPFFSLLEEF
Date   Source Headline
21st Jun 201312:14 pmRNSHoA with SODECO regarding sale and purchase of LNG
21st Jun 201312:12 pmRNSHoA with Marubeni for Sale and Purchase of LNG
21st Jun 201312:11 pmRNSRosneft and Eni Sign Completion Deed
21st Jun 201312:05 pmRNSAdvancement on Statoil Cooperation Agreement
21st Jun 201312:01 pmRNSAdvancement on ExxonMobil Strategic Cooperation
21st Jun 201311:54 amRNSCooperation Agreement with General Electric
21st Jun 201311:50 amRNS$2 bln Long-Term Loan from China Development Bank
21st Jun 201311:48 amRNSAgreement with CNPC on Crude Oil Supplies
21st Jun 20137:06 amRNSCrude Oil Supplies Contract with Trafigura
21st Jun 20137:00 amRNSContract for Crude Oil Deliveries to Czechia
21st Jun 20137:00 amRNSAGM Statement
7th May 20137:00 amRNSRosneft BoD Recommends Dividends at RUB 8.05
30th Apr 20136:00 pmRNSAnnual Financial Report
30th Apr 20132:02 pmRNS1st Quarter Results
15th Apr 20131:54 pmRNSRosneft Acquires Minority Stake in Saras S.p.A.
21st Mar 20131:13 pmRNSRosneft Consolidates 100% of TNK-BP
21st Mar 201312:49 pmRNSRosneft Finalises Acquisition of AAR 50% in TNK-BP
21st Mar 201312:45 pmRNSRosneft and BP Complete TNK-BP Purchase
5th Mar 20137:48 amRNSRosneft BOD Meeting Results
13th Feb 20133:40 pmRNSRosneft, ExxonMobil Expand Strategic Cooperation
13th Feb 201310:25 amRNSRosneft Signs Loan Agreements Worth $14.2 Bln
13th Feb 20139:57 amRNSRosneft BOD Meeting Results
1st Feb 201312:53 pmRNSLT supplies via Druzhba
1st Feb 201312:01 pmRNS2012 FY Results
22nd Jan 20137:00 amRNSAudit Of Reserves
24th Dec 201212:01 pmRNSRosneft Obtains Financing to Acquire 50% in TNK-BP
24th Dec 201211:47 amRNSHeads of Terms for Contracts with Glencore & Vitol
13th Dec 201212:34 pmRNSRosneft Board Approves Major Deals
12th Dec 20129:31 amRNSRosneft and AAR Sign Sale and Purchase Agreement
7th Dec 20127:00 amRNSRosneft Completes Debut Eurobond Issue
7th Dec 20127:00 amRNSRosneft and ExxonMobil Agreement For Tight Oil
3rd Dec 20123:38 pmRNSRosneft Held Extraordinary Meeting of Shareholders
22nd Nov 20124:16 pmRNSRosneft signs definitive agreements with BP
22nd Nov 20123:15 pmRNSRosneft Board Approves BP Deal
1st Nov 201210:15 amRNSRosneft and INTER RAO 25-Year Gas Supply Contract
1st Nov 20129:33 amRNS3rd Quarter Results
22nd Oct 20121:28 pmRNSRosneft Agrees Heads of Terms with AAR
22nd Oct 201212:08 pmRNSRosneft agrees to acquire 50% in TNK-BP from BP
18th Sep 20127:10 amRNSRosneft Holds Board of Directors Meeting
6th Sep 20129:13 amRNSRosneft and Transneft to Build ESPO Offshoot
30th Aug 201211:40 amRNSRN Statoil additional agreements
6th Aug 20128:25 amRNSRosneft and ITERA Close Deal to Create JV
1st Aug 20124:58 pmRNS1H 2012 IFRS Financial Results
24th Jul 20127:16 amRNSNotice of intention
23rd Jul 20127:30 amRNSAgreement with ENI to Finance Exploration Works
21st Jun 20123:30 pmRNSRosneft and VTB Bank sign strategic agreement
21st Jun 20123:28 pmRNSNew agreements between Rosneft and Eni
21st Jun 20123:23 pmRNSRosneft and Statoil advance strategic cooperation
21st Jun 20127:50 amRNSRosneft Held Regular Meeting of Shareholders
18th Jun 201210:13 amRNSRosneft and ExxonMobil Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.