We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRMM.L Regulatory News (RMM)

  • There is currently no data for RMM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Rambler announces drilling results

26 Nov 2019 11:35

RNS Number : 7115U
Rambler Metals & Mining PLC
26 November 2019
 

26 November 2019

Rambler Continues Extensions to Depth of the Ming North and 1807 Massive Sulfide Zones in New Drilling at its Ming Copper-Gold Mine 

 

London, England - Newfoundland and Labrador, Canada - Rambler Metals and Mining plc (AIM: RMM) ("Rambler" or the "Company"), a copper and gold producer, explorer, and developer, is pleased to announce additional new high grade intersections in recent drilling at its Ming Copper-Gold Mine in Eastern Canada.

A full version of the announcement can be viewed at: http://www.rns-pdf.londonstockexchange.com/rns/7115U_1-2019-11-26.pdf

Please refer to this link to access all figures which are referred to below. 

EXPLORATION SUMMARY

·; 1,992 meters of exploration drilling was completed from September 1, 2019 (the cut-off date of the previous exploration press release dated November 4, 2019) to November 15, 2019, at an average all-in direct drilling cost of CDN$75 per meter;

·; New drill holes have intercepted the Ming North Zone (MNZ) of massive sulfide mineralization approximately 140 meters down plunge of the previous deepest hole drilled in the MNZ that intercepted the ore zone (Hole R19-745-04). Highlights from the latest drilling include:

o R19-745-08 - 74.75 meters (m) downhole width of 8.98% copper with 2.16 grams per tonne (g/t) gold and 14.23 g/t silver, which includes two separate intervals shown below;

o Including - 27.77 meters (m) downhole width of 11.97% copper with 3.14 grams per tonne (g/t) gold and 19.23 g/t silver

o And including - 19.30 meters (m) downhole width of 14.85% copper with 2.94 g/t gold and 21.57 g/t silver

·; A new drill hole has intercepted the 1807 Zone (1807) of massive sulfide approximately 130 meters down plunge of the previous deepest hole drilled in the 1807 Zone (Hole R17-660-26). Highlights include:

o R19-735-01 - 7.00 m (downhole) of 1.84% copper with 8.35 g/t gold and 40.83 g/t silver

o R19-735-01 - 5.43m (downhole) of 2.02% copper with 1.80 g/t gold and 20.57 g/t silver

o R19-735-01 - 10.94m (downhole) of 1.84% copper with 1.22 g/t gold and 26.79 g/t silver

o R19-735-01 - 14.00m (downhole) of 1.33% copper with 5.42 g/t gold and 63.16 g/t silver

 

 

Andre Booyzen, President and CEO, commented:

"The Ming North zone has, in the span of less than 18 months, gone from an exploration conceptual target to become an integral part of the short and long term mine production plan. This newest drilling continues to justify our faith in pushing the exploration drilling of this zone deeper, with the highest grade and longest downhole intersections seen since the mine commenced operations in 2011.

In addition, the 1807 zone, which has been the backbone of massive sulfide production at the Ming Mine since 2012, has been extended down-plunge with excellent results in terms of copper and gold grades.

Mineralized grades and thickness for all zones at the Ming Mine have been demonstrated to improve with depth. Both of the high-grade massive sulfide zones reported here will further support the extension of the LOM plan once resource modelling and reserve design and scheduling has been completed based on the new information gleaned from this drilling."

Figure 1: View of the 1807 and MNZ looking across plunge, to the southwest

 

 

THE MING NORTH ZONE (MNZ)

 

The main massive sulfide orebody exploited during the historic mining era from 1972-1982 was the Ming North Zone (MNZ). At that time, it was believed that the zone narrowed downward to uneconomical mining widths just prior to the mine's closure in 1982. Updated 3D modeling techniques and a better understanding of the geology of the mineralization have proven instead that the historic massive sulfide bodies continue at depth. Recent diamond drilling tested the MNZ below the 745 level and has proven the continuation of high-grade copper mineralization to the 890 level (see Figure 2). This zone remains unbounded and open at depth.

Since first discovering the continuation of the MNZ down-plunge in August 2018, the operation has integrated the zone into its development and production schedule with the first mining horizon commencing at the 725L earlier this year. In addition to the down plunge extension described in this release, this mineralization has also been traced up-plunge, with stopes defined up to the 620 level just below the historic pre-1982 workings.

A total of 1,481 meters of new drilling were completed on the MNZ during the reporting period. Selected drill-holes are displayed in Figure 2. Highlights of composited mineralized intervals are included in Table 1 below; the complete set of individual assayed intervals for these composites is included in Appendix 1.

Table 1: MNZ exploration drilling results with composited down-hole and true widths and copper/gold/silver assay

Drill Hole

ZONE

From

(m)

To

(m)

Core Length

(m)

Copper

(%)

Gold

 (g/t)

Silver

 (g/t)

True Width

 (m)

R19-745-06

MNZ

187.40

203.00

15.60

2.51

1.58

9.03

7.3

R19-745-07

MNZ

246.00

251.00

5.00

1.69

0.83

4.45

2.2

R19-745-07

MNZ

253.63

258.18

4.55

2.26

1.96

21.00

1.3

R19-745-08

MNZ

317.00

391.75

74.75

8.98

2.16

14.23

19.4

Including

MNZ

331.00

358.77

27.77

11.97

3.14

19.23

7.2

Including

MNZ

367.70

387.00

19.30

14.85

2.94

21.57

4.6

 

 

Figure 2: Longsection view of the Ming North Zone (Upper) underground diamond drilling program; looking west

THE 1807 ZONE (1807)

The 1807 zone has been mined continually since 2012 from the 304 level down to the 735 level. Limited underground drilling currently shows the zone to narrow up-dip of the 304 level to uneconomic mining widths. This zone remains unbounded and open at depth.  The geology in the 1807 zone is characterized by massive pyrite-chalcopyrite-sphalerite that have been variably recrystallized. The sulfide horizons of the 1807 zone are up to six meters thick.

A total of 511 meters of new drilling were completed on the 1807 zone during the reporting period. Selected drill-holes are displayed in Figure 3. Highlights of composited mineralized intervals at the 735 level are included in Table 1 below; the complete set of individual assayed intervals for these composites is included in Appendix 1.

Table 2: 1807 exploration drilling results with composited down-hole and true widths and copper/gold/silver assays

Drill Hole

ZONE

From

(m)

To

(m)

Core Length

(m)

Copper

(%)

Gold

 (g/t)

Silver

 (g/t)

True Width

 (m)

R19-735-01

1807

117.00

124.00

7.00

1.84

8.35

40.83

1.6

R19-735-01

1807

129.57

135.00

5.43

2.02

1.80

20.57

0.6

R19-735-01

1807

176.60

192.00

10.94

1.84

1.22

26.79

1.8

R19-735-01

1807

266.00

280.00

14.00

1.33

5.42

63.16

1.5

 

Figure 3: Longsection view of the 1807 Zone underground diamond drilling program; looking west

Note 1

Results reported are accurate and reflective as of the date of release. The company performs regular auditing and reconciliation reviews on its processes following which past results may be adjusted to reflect any changes. Core lengths can vary depending on the angle the drill hole intersects the mineralized body. True widths are estimated to range between 10%-85% of core lengths, dependent upon drill sites and orebody intercept angles.

Tim Sanford, P.Eng., is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Sanford is an employee of Rambler Metals and Mining Canada Limited. Tonnes referenced are dry metric tonnes unless otherwise indicated.

Rambler maintains an ongoing quality assurance and quality control program ('QA/QC') to ensure that exploration data collected adheres to all compliance regulations and CIM best practices. Rambler maintains written field procedures and has had independent audit and verification of its geological database and all data related to drilling, surveying, sampling and assaying.

Rambler's QA/QC program includes insertion of blanks, duplicates and standard samples at regular intervals. Analytical control measures for the drilling program involve both internal and external laboratory check samples to ensure that data received and used are accurate and reliable. Rambler has utilized the Datamine database management program DHLogger as an effective and efficient way to manage assay data as well as QA/QC tracking and reporting.

With the exception of infill drill holes bearing only copper assays, which assays are performed at Rambler's on-site laboratory, all core samples assayed and pertaining to this report were completed by Eastern Analytical Limited (EAL) located in Springdale, Newfoundland. Eastern Analytical Limited is an ISO 17025 accredited laboratory and bears no relationship to Rambler.

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside is now considered to be in the public domain.

ABOUT RAMBLER METALS AND MINING

Rambler is a mining and development company that in November 2012 brought its first mine into commercial production. Rambler has a 100 per cent ownership in the Ming Copper-Gold Mine, a fully operational base and precious metals processing facility and year-round bulk storage and shipping facility; all located on the Baie Verte peninsula, Newfoundland and Labrador, Canada.

Following the completion of its recent productivity improvement initiative Rambler's focus is on sustaining mine and mill production at over 1,350 metric tonnes per day at 2% Copper at the Ming Mine. With a return to profitability and positive cash flow, Rambler will continue advancing engineering studies and capital asset additions with a view to further increase production.

Along with the Ming Mine, Rambler also owns 100 per cent of the former producing Little Deer/ Whales Back copper mines.

Rambler is listed in London under AIM:RMM.

For further information, please contact:

 

Andre Booyzen

President and CEO

Rambler Metals & Mining Plc

Tel No: +44 (0) 20 8652-2700

Fax No: +44 (0) 20 8652-2719

Sanjay Swarup

CFO

Rambler Metals & Mining Plc

Tel No: +44 (0) 20 7096 0662

Fax No: +44 (0) 20 8609 0313

Tim Sanford. P. Eng.

Vice President and

Corporate Secretary

Rambler Metals & Mining Plc

Tel No: +1 (709) 532 5736

Fax No: +1 (709) 800 1921

 

Nominated Advisor (NOMAD)

 

 

Ewan Leggat, Caroline Rowe

SP Angel Corporate Finance LLP

Tel No: +44 (0) 20 3470 0470

 

 

 

 

 

 

Website: www.ramblermines.com 

Caution Regarding Forward Looking Statements:

Certain information included in this press release, including information relating to future financial or operating performance and other statements that express the expectations of management or estimates of future performance constitute "forward-looking statements". Such forward-looking statements include, without limitation, statements regarding copper, gold and silver forecasts, the financial strength of the Company, estimates regarding timing of future development and production and statements concerning possible expansion opportunities for the Company. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief are based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include, without limitation, the price of and anticipated costs of recovery of, copper concentrate, gold and silver, the presence of and continuity of such minerals at modeled grades and values, the capacities of various machinery and equipment, the availability of personnel, machinery and equipment at estimated prices, mineral recovery rates, and others. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, interpretation and implications of drilling and geophysical results; estimates regarding timing of future capital expenditures and costs towards profitable commercial operations. Other factors that could cause actual results, developments or events to differ materially from those anticipated include, among others, increases/decreases in production; volatility in metals prices and demand; currency fluctuations; cash operating margins; cash operating cost per pound sold; costs per ton of ore; variances in ore grade or recovery rates from those assumed in mining plans; reserves and/or resources; the ability to successfully integrate acquired assets; operational risks inherent in mining or development activities and legislative factors relating to prices, taxes, royalties, land use, title and permits, importing and exporting of minerals and environmental protection. Accordingly, undue reliance should not be placed on forward-looking statements and the forward-looking statements contained in this press release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements contained herein are made as at the date hereof and the Company does not undertake any obligation to update publicly or revise any such forward-looking statements or any forward-looking statements contained in any other documents whether as a result of new information, future events or otherwise, except as required under applicable security law.

 

 

 

APPENDIX 1: INTERVAL AND COMPOSITE ASSAYS OF THE SELECTED DRILLHOLES

 

Drill Hole

ZONE

From

(m)

To

(m)

Core Length

(m)

Copper

(%)

Gold

(g/t)

Silver

(g/t)

R19-735-01

1807

117.00

118.00

1.00

2.05

48.90

20.10

R19-735-01

1807

118.00

119.07

1.07

0.19

0.09

0.40

R19-735-01

1807

119.07

120.00

0.93

1.96

1.24

26.90

R19-735-01

1807

120.00

120.60

0.60

1.58

0.62

18.40

R19-735-01

1807

120.60

121.00

0.40

2.48

4.13

44.60

R19-735-01

1807

121.00

122.00

1.00

1.95

3.73

48.70

R19-735-01

1807

122.00

123.00

1.00

2.65

5.33

42.80

R19-735-01

1807

123.00

123.25

0.25

2.28

4.88

26.40

R19-735-01

1807

123.25

123.75

0.50

1.36

2.44

14.30

R19-735-01

1807

123.75

124.00

0.25

2.45

8.58

29.90

R19-735-01

COMP

117.00

124.00

7.00

1.84

8.35

40.83

R19-735-01

1807

129.57

130.00

0.43

3.72

1.49

40.70

R19-735-01

1807

130.00

131.00

1.00

1.96

1.72

20.10

R19-735-01

1807

131.00

132.00

1.00

0.72

1.30

8.50

R19-735-01

1807

132.00

133.00

1.00

1.09

1.61

12.50

R19-735-01

1807

133.00

134.00

1.00

2.22

3.28

24.00

R19-735-01

1807

134.00

135.00

1.00

3.44

1.24

29.10

R19-735-01

COMP

129.57

135.00

5.43

2.02

1.80

20.57

R19-735-01

1807

176.60

177.00

0.40

2.94

0.84

83.70

R19-735-01

1807

177.00

177.72

0.72

1.08

0.56

21.40

R19-735-01

1807

177.72

178.20

0.48

0.12

0.14

2.60

R19-735-01

1807

182.66

183.16

0.50

0.90

0.34

10.30

R19-735-01

1807

183.16

184.00

0.84

3.70

0.53

29.60

R19-735-01

1807

184.00

185.00

1.00

1.63

0.57

18.00

R19-735-01

1807

185.00

186.00

1.00

1.30

0.72

19.00

R19-735-01

1807

186.00

187.00

1.00

1.28

2.33

23.10

R19-735-01

1807

187.00

188.00

1.00

0.60

0.99

14.40

R19-735-01

1807

188.00

189.00

1.00

0.61

1.69

19.70

R19-735-01

1807

189.00

190.00

1.00

2.33

1.32

28.10

R19-735-01

1807

190.00

191.00

1.00

2.69

2.19

31.80

R19-735-01

1807

191.00

192.00

1.00

3.09

2.12

28.80

R19-735-01

COMP

176.60

192.00

10.94

1.84

1.22

26.79

R19-735-01

1807

266.00

267.00

1.00

2.68

5.64

79.20

R19-735-01

1807

267.00

268.00

1.00

2.60

9.62

59.60

R19-735-01

1807

268.00

269.00

1.00

1.49

7.90

33.50

Drill Hole

ZONE

From

(m)

To

(m)

Core Length

(m)

Copper

(%)

Gold

(g/t)

Silver

(g/t)

R19-735-01

1807

269.00

270.00

1.00

0.96

4.43

19.10

R19-735-01

1807

270.00

271.00

1.00

0.92

3.64

19.80

R19-735-01

1807

271.00

272.00

1.00

0.76

3.27

28.10

R19-735-01

1807

272.00

273.00

1.00

0.50

2.98

20.80

R19-735-01

1807

273.00

273.40

0.40

0.56

1.00

16.60

R19-735-01

1807

273.40

274.40

1.00

1.45

2.70

25.20

R19-735-01

1807

274.40

275.00

0.60

1.73

2.08

27.70

R19-735-01

1807

275.00

276.00

1.00

1.47

6.01

35.40

R19-735-01

1807

276.00

277.00

1.00

0.86

3.27

21.00

R19-735-01

1807

277.00

278.00

1.00

0.53

3.38

16.30

R19-735-01

1807

278.00

279.00

1.00

2.24

8.56

237.00

R19-735-01

1807

279.00

280.00

1.00

1.21

12.80

266.00

R19-735-01

COMP

266.00

280.00

14.00

1.33

5.42

63.16

R19-745-06

MNZ

187.40

188.00

0.60

6.16

5.15

10.50

R19-745-06

MNZ

188.00

1 89.00

1.00

3.27

1.33

7.70

R19-745-06

MNZ

189.00

190.00

1.00

2.01

1.33

7.20

R19-745-06

MNZ

190.00

191.00

1.00

1.10

0.43

3.00

R19-745-06

MNZ

191.00

192.00

1.00

0.63

0.44

2.40

R19-745-06

MNZ

192.00

193.00

1.00

2.05

2.12

10.30

R19-745-06

MNZ

193.00

194.00

1.00

1.55

0.77

7.00

R19-745-06

MNZ

194.00

195.00

1.00

6.00

3.54

13.50

R19-745-06

MNZ

195.00

196.00

1.00

2.31

1.36

6.10

R19-745-06

MNZ

196.00

197.00

1.00

1.52

1.29

16.20

R19-745-06

MNZ

197.00

198.00

1.00

1.88

0.94

7.30

R19-745-06

MNZ

198.00

199.00

1.00

1.64

1.33

8.00

R19-745-06

MNZ

199.00

200.00

1.00

1.13

0.61

3.50

R19-745-06

MNZ

200.00

201.00

1.00

5.27

3.21

20.00

R19-745-06

MNZ

201.00

202.00

1.00

2.67

1.99

18.9

R19-745-06

MNZ

202.00

203.00

1.00

2.36

0.80

3.50

R19-745-06

COMP

187.40

203.00

15.60

2.51

1.58

9.03

R19-745-07

MNZ

246.00

247.00

1.00

1.20

2.43

10.20

R19-745-07

MNZ

247.00

248.00

1.00

1.19

0.47

2.40

R19-745-07

MNZ

248.00

248.55

0.55

8.65

0.32

13.10

R19-745-07

MNZ

248.55

249.00

0.45

0.56

0.04

0.10

R19-745-07

MNZ

249.00

250.00

1.00

0.54

0.46

1.30

R19-745-07

MNZ

250.00

251.00

1.00

0.49

0.58

1.10

R19-745-07

COMP

246.00

251.00

5.00

1.69

0.83

4.45

Drill Hole

ZONE

From

(m)

To

(m)

Core Length

(m)

Copper

(%)

Gold

(g/t)

Silver

(g/t)

R19-745-07

MNZ

253.63

254.00

0.37

2.37

0.68

3.60

R19-745-07

MNZ

254.00

255.00

1.00

3.86

0.96

6.40

R19-745-07

MNZ

255.00

256.00

1.00

5.53

1.59

10.80

R19-745-07

MNZ

256.00

256.80

0.80

3.94

1.37

5.70

R19-745-07

MNZ

256.80

257.68

0.88

0.47

0.03

0.10

R19-745-07

MNZ

257.68

258.18

0.50

0.09

0.01

0.10

R19-745-07

COMP

253.63

258.18

4.55

2.26

1.96

21.00

R19-745-08

MNZ

317.00

318.00

1.00

1.99

0.56

2.60

R19-745-08

MNZ

318.00

319.00

1.00

0.04

0.13

0.50

R19-745-08

MNZ

319.00

320.00

1.00

1.09

0.19

1.90

R19-745-08

MNZ

320.00

321.00

1.00

1.21

0.77

2.60

R19-745-08

MNZ

321.00

322.00

1.00

1.26

0.45

2.50

R19-745-08

MNZ

322.00

323.00

1.00

0.76

0.22

2.00

R19-745-08

MNZ

323.00

324.00

1.00

0.64

0.23

1.40

R19-745-08

MNZ

324.00

325.00

1.00

3.08

0.45

4.30

R19-745-08

MNZ

325.00

326.00

1.00

0.31

0.16

0.60

R19-745-08

MNZ

326.00

327.00

1.00.

1.61

1.66

2.80

R19-745-08

MNZ

327.00

328.00

1.00

1.20

0.16

1.80

R19-745-08

MNZ

328.00

329.00

1.00

2.40

0.26

3.60

R19-745-08

MNZ

329.00

330.00

1.00

3.39

3.20

5.50

R19-745-08

MNZ

330.00

331.00

1.00

4.17

0.38

5.70

R19-745-08

MNZ

331.00.

332.00

1.00

10.40

0.40

12.10

R19-745-08

MNZ

332.00

333.00

1.00

11.90

4.34

18.00

R19-745-08

MNZ

333.00

334.00

1.00

16.20

10.3

22.10

R19-745-08

MNZ

334.00

335.00

1.00

13.30

2.63

18.00

R19-745-08

MNZ

335.00

336.00

1.00

13.30

6.46

19.90

R19-745-08

MNZ

336.00

337.00

1.00

8.01

2.46

14.60

R19-745-08

MNZ

337.00

338.00

1.00

5.32

1.68

11.30

R19-745-08

MNZ

338.00

339.00

1.00

6.73

2.59

14.00

R19-745-08

MNZ

339.00

340.00

1.00

6.43

2.43

12.10

R19-745-08

MNZ

340.00

341.00

1.00

7.72

1.97

12.80

R19-745-08

MNZ

341.00

342.00

1.00

7.24

1.34

13.90

R19-745-08

MNZ

342.00

343.00

1.00

11.10

2.96

21.70

R19-745-08

MNZ

343.00

344.00

1.00

13.20

9.32

25.70

R19-745-08

MNZ

344.00

345.00

1.00

12.20

2.49

25.80

R19-745-08

MNZ

345.00

346.00

1.00

13.60

4.26

27.00

R19-745-08

MNZ

346.00

347.00

1.00

16.30

3.67

30.40

R19-745-08

MNZ

347.00

348.00

1.00

12.80

3.04

21.40

Drill Hole

ZONE

From

(m)

To

(m)

Core Length

(m)

Copper

(%)

Gold

(g/t)

Silver

(g/t)

R19-745-08

MNZ

348.00

349.00

1.00

7.56

1.29

13.60

R19-745-08

MNZ

348.00

349.00

1.00

7.56

1.29

13.60

R19-745-08

MNZ

349.00

349.50

0.50

6.91

1.39

13.90

R19-745-08

MNZ

349.50

350.00

0.50

15.24

4.04

23.00

R19-745-08

MNZ

350.00

351.00

1.00

11.37

1.67

16.00

R19-745-08

MNZ

351.00

352.00

1.00

13.25

1.95

19.00

R19-745-08

MNZ

352.00

353.00

1.00

14.14

3.13

21.00

R19-745-08

MNZ

353.00

354.00

1.00

17.00

2.42

24.50

R19-745-08

MNZ

354.00

355.00

1.00

15.03

2.77

21.60

R19-745-08

MNZ

355.00

356.00

1.00

13.98

3.52

22.00

R19-745-08

MNZ

356.00

357.00

1.00

15.60

1.63

20.40

R19-745-08

MNZ

357.00

358.00

1.00

13.94

1.89

18.70

R19-745-08

MNZ

358.00

358.77

0.77

17.78

2.59

23.20

R19-745-08

MNZ

358.77

360.00

1.23

6.87

1.16

9.00

R19-745-08

MNZ

360.00

361.00

1.00

0.19

0.02

0.60

R19-745-08

MNZ

361.00

362.70

1.70

1.58

0.19

3.20

R19-745-08

MNZ

362.70

363.11

0.41

19.20

2.70

29.90

R19-745-08

MNZ

363.11

364.00

0.89

0.20

0.03

0.50

R19-745-08

MNZ

364.00

365.00

1.00

0.07

0.01

0.30

R19-745-08

MNZ

365.00

366.00

1.00

0.02

0.005

0.30

R19-745-08

MNZ

366.00

367.00

1.00

0.02

0.005

0.20

R19-745-08

MNZ

367.00

367.70

0.70

0.25

0.08

0.50

R19-745-08

MNZ

367.70

368.20

0.50

23.10

7.33

37.00

R19-745-08

MNZ

368.20

369.00

0.80

22.60

2.61

28.40

R19-745-08

MNZ

369.00

370.00

1.00

23.00

3.89

31.80

R19-745-08

MNZ

370.00

371.00

1.00

25.80

4.77

34.70

R19-745-08

MNZ

371.00

372.00

1.00

17.70

2.60

26.00

R19-745-08

MNZ

372.00

373.00

1.00

23.10

2.13

30.60

R19-745-08

MNZ

373.00

374.00

1.00

18.00

4.32

24.30

R19-745-08

MNZ

374.00

375.00

1.00

17.40

5.34

24.80

R19-745-08

MNZ

375.00

376.00

1.00

18.70

5.43

24.50

R19-745-08

MNZ

376.00

377.00

1.00

18.30

3.34

24.20

R19-745-08

MNZ

377.00

378.00

1.00

15.60

2.53

22.30

R19-745-08

MNZ

378.00

379.00

1.00

13.70

2.86

20.70

R19-745-08

MNZ

379.00

380.00

1.00

13.70

2.77

23.30

R19-745-08

MNZ

380.00

381.00

1.00

13.10

1.92

23.20

R19-745-08

MNZ

381.00

382.00

1.00

10.30

2.95

18.20

R19-745-08

MNZ

382.00

383.00

1.00

8.58

1.95

15.20

Drill Hole

ZONE

From

(m)

To

(m)

Core Length

(m)

Copper

(%)

Gold

(g/t)

Silver

(g/t)

R19-745-08

MNZ

383.00

384.00

1.00

4.77

0.84

8.60

R19-745-08

MNZ

384.00

385.00

1.00

6.11

1.00

6.70

R19-745-08

MNZ

385.00

386.00

1.00

7.57

1.70

10.70

R19-745-08

MNZ

386.00

387.00

1.00

1.56

0.72

5.20

R19-745-08

MNZ

387.00

388.00

1.00

1.60

1.29

11.30

R19-745-08

MNZ

388.00

389.00

100

1.86

1.83

14.50

R19-745-08

MNZ

389.00

390.00

1.00.

1.49

0.94

7.00

R19-745-08

MNZ

390.00

391.00

1.00

3.01

1.17

9.40

R19-745-08

MNZ

391.00

391.35

0.35

1.64

0.40

2.80

R19-745-08

MNZ

391.35

391.75

0.4

1.83

0.60

4.00

R19-745-08

COMP

317.00

391.75

74.75

8.98

2.16

14.23

R19-745-08

MNZ

331.00

332.00

1.00

10.40

0.40

12.10

R19-745-08

MNZ

332.00

333.00

1.00

11.90

4.34

18.00

R19-745-08

MNZ

333.00

334.00

1.00

16.20

10.3

22.10

R19-745-08

MNZ

334.00

335.00

1.00

13.30

2.63

18.00

R19-745-08

MNZ

335.00

336.00

1.00

13.30

6.46

19.90

R19-745-08

MNZ

336.00

337.00

1.00

8.01

2.46

14.60

R19-745-08

MNZ

337.00

338.00

1.00

5.32

1.68

11.30

R19-745-08

MNZ

338.00

339.00

1.00

6.73

2.59

14.00

R19-745-08

MNZ

339.00

340.00

1.00

6.43

2.43

12.10

R19-745-08

MNZ

340.00

341.00

1.00

7.72

1.97

12.80

R19-745-08

MNZ

341.00

342.00

1.00

7.24

1.34

13.90

R19-745-08

MNZ

342.00

343.00

1.00

11.10

2.96

21.70

R19-745-08

MNZ

343.00

344.00

1.00

13.20

9.32

25.70

R19-745-08

MNZ

344.00

345.00

1.00

12.20

2.49

25.80

R19-745-08

MNZ

345.00

346.00

1.00

13.60

4.26

27.00

R19-745-08

MNZ

346.00

347.00

1.00

16.30

3.67

30.40

R19-745-08

MNZ

347.00

348.00

1.00

12.80

3.04

21.40

R19-745-08

MNZ

348.00

349.00

1.00

7.56

1.29

13.60

R19-745-08

MNZ

349.00

349.50

0.50

6.91

1.39

13.90

R19-745-08

MNZ

349.50

350.00

0.50

15.24

4.04

23.00

R19-745-08

MNZ

350.00

351.00

1.00

11.37

1.67

16.00

R19-745-08

MNZ

351.00

352.00

1.00

13.25

1.95

19.00

R19-745-08

MNZ

352.00

353.00

1.00

14.14

3.13

21.00

R19-745-08

MNZ

353.00

354.00

1.00

17.00

2.42

24.50

R19-745-08

MNZ

354.00

355.00

1.00

15.03

2.77

21.60

R19-745-08

MNZ

355.00

356.00

1.00

13.98

3.52

22.00

R19-745-08

MNZ

356.00

357.00

1.00

15.60

1.63

20.40

Drill Hole

ZONE

From

(m)

To

(m)

Core Length

(m)

Copper

(%)

Gold

(g/t)

Silver

(g/t)

R19-745-08

MNZ

358.00

358.77

0.77

17.78

2.59

23.20

R19-745-08

COMP

331.00

358.77

27.77

11.97

3.14

19.23

R19-745-08

MNZ

367.70

368.20

0.50

23.10

7.33

37.00

R19-745-08

MNZ

368.20

369.00

0.80

22.60

2.61

28.40

R19-745-08

MNZ

369.00

370.00

1.00

23.00

3.89

31.80

R19-745-08

MNZ

370.00

371.00

1.00

25.80

4.77

34.70

R19-745-08

MNZ

371.00

372.00

1.00

17.70

2.60

26.00

R19-745-08

MNZ

372.00

373.00

1.00

23.10

2.13

30.60

R19-745-08

MNZ

373.00

374.00

1.00

18.00

4.32

24.30

R19-745-08

MNZ

374.00

375.00

1.00

17.40

5.34

24.80

R19-745-08

MNZ

375.00

376.00

1.00

18.70

5.43

24.50

R19-745-08

MNZ

376.00

377.00

1.00

18.30

3.34

24.20

R19-745-08

MNZ

377.00

378.00

1.00

15.60

2.53

22.30

R19-745-08

MNZ

378.00

379.00

1.00

13.70

2.86

20.70

R19-745-08

MNZ

379.00

380.00

1.00

13.70

2.77

23.30

R19-745-08

MNZ

380.00

381.00

1.00

13.10

1.92

23.20

R19-745-08

MNZ

381.00

382.00

1.00

10.30

2.95

18.20

R19-745-08

MNZ

382.00

383.00.

1.00

8.58

1.95

15.20

R19-745-08

MNZ

383.00

384.00

1.00

4.77

0.84

8.60

R19-745-08

MNZ

384.00

385.00

1.00

6.11

1.00

6.70

R19-745-08

MNZ

385.00

386.00

1.00

7.57

1.70

10.70

R19-745-08

MNZ

386.00

387.00

1.00

1.56

0.72

5.20

R19-745-08

COMP

367.70

387.00

19.30

14.85

2.94

21.57

         

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLLLFVLLILRFIA
Date   Source Headline
27th Apr 20237:00 amRNSBlock Listing Six Monthly Return
21st Apr 20237:00 amRNSUpdate – Creditors Voluntary Liquidation
17th Apr 20237:00 amRNSSale and Investment Solicitation Process
12th Apr 20231:53 pmRNSCompany Website Update
11th Apr 20235:45 pmRNSRambler Metals & Mining
11th Apr 20237:00 amRNSCreditors Voluntary Arrangement and Cancellation
6th Apr 20234:27 pmRNSMaterials publicly filed in the CCAA Proceedings
4th Apr 20232:42 pmRNSCompany Website
30th Mar 20238:33 amRNSOperational Update
24th Mar 20232:33 pmRNSGrant and Vesting of Restricted Share Units
17th Mar 20231:54 pmRNSMaterials publicly filed in the CCAA Proceedings
16th Mar 20233:58 pmRNSCCAA Proceedings
14th Mar 20239:12 amRNSMaterials publicly filed in the CCAA Proceedings
8th Mar 20237:00 amRNSMaterials publicly filed in the CCAA Proceedings
7th Mar 20237:00 amRNSCorrection: Materials publicly filed
6th Mar 20236:15 pmRNSMaterials publicly filed in the CCAA Proceedings
28th Feb 20236:15 pmRNSMaterials publicly filed in the CCAA Proceedings
28th Feb 20237:00 amRNSRambler Announces Strategic Process
27th Feb 20237:00 amRNSApplication for Initial Order for CCAA Protection
20th Feb 20237:00 amRNSUpdate on Gold Stream Repurchase Agreement
17th Feb 20237:00 amRNSUpdate on Financing and Operations
10th Feb 20237:00 amRNSUpdate on Gold Streaming Agreement
18th Jan 20237:00 amRNSQ4 2022 Operational Results
5th Dec 20223:49 pmRNSForward Sale on Copper Production
15th Nov 20227:00 amRNSForward Sale on Copper Production
10th Nov 20229:28 amRNSRambler Provides an Operational Update
1st Nov 20227:00 amRNSRambler Provides an Update on Financial Position
27th Oct 20227:30 amRNSSuspension - Rambler Metals & Mining PLC
27th Oct 20227:01 amRNSBlock Listing Six Monthly Return
27th Oct 20227:00 amRNSRambler Provides an Update on Financial Position
21st Oct 20227:00 amRNSQ3 2022 Operational Results
3rd Oct 20229:05 amRNSSecond Price Monitoring Extn
3rd Oct 20229:00 amRNSPrice Monitoring Extension
30th Sep 20222:06 pmRNSSecond Price Monitoring Extn
30th Sep 20222:00 pmRNSPrice Monitoring Extension
28th Sep 20224:41 pmRNSSecond Price Monitoring Extn
28th Sep 20224:35 pmRNSPrice Monitoring Extension
27th Sep 20224:40 pmRNSSecond Price Monitoring Extn
27th Sep 20224:35 pmRNSPrice Monitoring Extension
27th Sep 20222:00 pmRNSPrice Monitoring Extension
26th Sep 20224:32 pmRNSFinancial Results Half Year Ended 30 June 2022
15th Sep 20222:05 pmRNSSecond Price Monitoring Extn
15th Sep 20222:00 pmRNSPrice Monitoring Extension
13th Sep 20224:41 pmRNSSecond Price Monitoring Extn
13th Sep 20224:35 pmRNSPrice Monitoring Extension
9th Sep 20224:40 pmRNSSecond Price Monitoring Extn
9th Sep 20224:35 pmRNSPrice Monitoring Extension
9th Sep 202212:19 pmRNSRambler Provides a Corporate Update
1st Sep 20227:00 amRNSSignificance of Stope In-fill Drilling Program
23rd Aug 20227:00 amRNSRambler Updates 2022 Diamond Drilling Program

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.