Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRMM.L Regulatory News (RMM)

  • There is currently no data for RMM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

31 May 2006 07:30

Rambler Metals & Mining PLC31 May 2006 31st May 2006 Latest Rambler Drilling Returns Multiple Intersections Grading Above 3% Copper Highlights O RM-06-04d returns 34.4 feet @ 3.20% copper O RM-06-04e returns 24.6 feet @ 4.17% copper plus 4.50 g/T gold and 57.1 feet @ 3.18% copper O RM-06-03b returns 21.0 feet @ 3.32% copper and 36.1 feet @ 2.42% copper London -Rambler Metals and Mining plc is pleased to report additional strongresults from its Phase II drilling program at the Rambler Project inNewfoundland and Labrador, Canada. The current drilling is designed todelineate the Ming Footwall Zone (MFZ) at approximately 50 metre centres isutilizing directional drilling techniques to complete offset holes from thepreviously drilled, widely spaced surface drill holes. Significantly, theresults reported here are from a part of the MFZ that occurs in close proximityto existing underground mining infrastructure related to historic mining of theoverlying Ming Massive Sulphide (MMS) deposit. "The MFZ is emerging as a very robust zone of mineralization and the delineationdrilling is quickly outlining a significant core volume of very good gradecopper mineralization. The excellent intersection of thick copper and goldmineralization on the MMS is also exciting as it is located less than 100 metresbeyond the limit of historic mining of this deposit, "commented Rambler ChairmanHarry Dobson. " We look forward to additional delineation drill results as wellas to starting the program of dewatering and underground rehabilitation." Two drill rigs are currently operating on the property from setups on holesRM-04-03 and RM-04-04, which are separated by approximately 225 metres. The holelocation map can be viewed at http://www.ramblermines.com/. The results from theoffset holes are summarized below. Zones in each hole are listed consecutivelyand the intervening intervals represent sections of later intrusive rocks thatare unmineralized or sections of mineralization grading less than 1% copper. Drill From To Length Length Cu Au Zone (meters) (meters) (meters) (feet) (%)Hole (ppb) RM06-04d 889.85 894.80 4.95 16.20 2.17 2657 MMS RM06-04d 1069.00 1072.00 3.00 9.84 1.74 210 MFZRM06-04d 1074.00 1084.50 10.50 34.44 3.20 338 MFZRM06-04d 1116.50 1122.50 6.00 19.68 1.94 88 MFZRM06-04d 1146.30 1150.80 4.50 14.76 2.13 212 MFZ RM06-04e 885.50 897.50 12.00 39.34 3.03 3343 MMSincluding 888.50 896.00 7.50 24.59 4.17 4503 MMSRM06-04e 1094.90 1106.90 12.00 39.36 2.06 214 MFZRM06-04e 1110.10 1115.80 5.70 18.70 1.60 36 MFZRM06-04e 1118.00 1135.40 17.40 57.07 3.18 178 MFZ RM06-03b 891.70 898.10 6.40 21.00 3.32 153 MFZRM06-03b 903.80 914.80 11.00 36.10 2.42 115 MFZ Holes 4f and 3c are currently in progress. The permitting process for a planneddewatering and underground rehabilitation program that will facilitateadditional underground drilling programs is also progressing well. Leslie Little, Company Secretary Guy WilkesRambler Metals & Mining Plc Ocean EquitiesTel No: 020-7661-8062 T: 020 7786 4370 J.Geoffrey Thurlow, Ph.D., P.Geo. is the Qualified Person responsible fortechnical content of this release. Drill intercepts quoted are core lengths;true widths are estimated to be 90% to 95% of the intersected core lengths.National Instrument 43-101 compliance information regarding sampling andanalytical protocols pertaining to the Rambler Project can be accessed via thefollowing link: http://www.ramblermines.com Exploration on the Rambler property is being conducted by Altius Resources Inc.under a service agreement with Rambler Metals and Mining plc. All drill holeshave produced 47.6 millimetre diameter (1.875-inch) NQ diamond drill core. Thedrill core is descriptively logged on site, aligned, marked for sampling andthen split in half, longitudinally, using a diamond saw blade. One-half of thecore is preserved in core boxes for future reference. The samples comprising theother half of the core are bagged, sealed and delivered directly to theanalytical laboratory by Altius personnel. Base metal-bearing samples arenominally 1 metre to 1.8 metres (3.28 to 5.90 feet) in length except wherespecific geologic parameters require that a smaller interval be sampled.Samples with suspected precious metal content are nominally one metre or less,depending on the geological circumstances. The sawed samples are delivered directly to Eastern Analytical Ltd. inSpringdale, Newfoundland by Altius personnel where they are dried, crushed andpulped. Samples are crushed to approximately -10 mesh and split using a rifflesplitter to approximately 300 grams. The sample split is pulverized using aring mill to approximately 98% minus 150 mesh. In addition to regular samples,blank samples and quarter-split samples are also submitted for crushing/pulping. Check assays are conducted at Eastern Analytical on samples which are expectedto contain significant copper and gold. The sample pulps are picked up directly at Eastern Analytical by Altiuspersonnel and returned to the project site at which point analytical standardsamples and duplicate samples from previous batches are inserted into the samplestream. All sample rejects are also retrieved from Eastern Analytical by Altiuspersonnel and securely stored by Altius. The sample pulps are shipped by courier to Activation Laboratories Ltd. inAncaster, Ontario for analysis. A typical analysis consists of three,industry-standard components: (1) an aqua regia digestion followed by a 34 element ICP analysis, (2) a gold assay consisting of a one assay ton fire assay with finish by atomic absorption, and (3) an assay of specific base metals by aqua regia digestion followed by atomic absorption spectroscopy for those elements which exceed the limits of ICP accuracy. The drill program and sampling protocol are being supervised by J.GeoffreyThurlow, Ph.D., P.Geo., of VMS Consultants Inc. and a Director of Altius; aQualified Person as defined under the Canadian Securities Administrators'National Instrument 43-101. About the Company Rambler was established to invest in the base metal sector in politically stablejurisdictions. Its principal project is the Rambler copper-gold property,located on the Baie Verte Peninsula of Newfoundland and Labrador, Canada, whichis at the delineation drilling stage. Rambler acquired the property from AltiusMinerals Corporation in exchange for ordinary shares during 2005. The Rambler property contains the former producing Ming and Ming Westcopper-gold mines. The Ming Mine last operated in 1982 and the Ming West Minein 1996. Mining of the Ming Mine ceased when workings reached a neighbouringproperty boundary. Rambler Metals and Mines acquired the property after it hadbeen successfully consolidated. The Ming and Ming West Mines exploited relatively narrow zones of high gradecopper and gold mineralization. Sections of this mineralization remain in thelower part of the Ming Mine and it is open to depth. In 2004, two holes were drilled to test the depth potential of the underlyingMing Footwall Zone (MFZ), which was partially outlined nearer to surface by theprevious mining operator. These drill holes both returned wide zones of goodgrade copper mineralization and the MFZ became a priority for delineationdrilling. The first phase of drilling was carried out from April through December 2005 andinvolved the completion of widely spaced holes from which offset holes could becompleted using directional drilling technology. The directional drillingprogram began in January of 2006 and holes are now being nominally spaced at 50metre centres in order to delineate the mineralized areas. A program of dewatering and rehabilitation of the Ming Mine undergroundinfrastructure is currently at the permitting stage. This work is beingundertaken with a view towards accelerating resource delineation and, hopefully,the resumption of mining operations on the property. Rambler Metals and Mining plc trades on London's AIM market under symbol RMM. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
27th Apr 20237:00 amRNSBlock Listing Six Monthly Return
21st Apr 20237:00 amRNSUpdate – Creditors Voluntary Liquidation
17th Apr 20237:00 amRNSSale and Investment Solicitation Process
12th Apr 20231:53 pmRNSCompany Website Update
11th Apr 20235:45 pmRNSRambler Metals & Mining
11th Apr 20237:00 amRNSCreditors Voluntary Arrangement and Cancellation
6th Apr 20234:27 pmRNSMaterials publicly filed in the CCAA Proceedings
4th Apr 20232:42 pmRNSCompany Website
30th Mar 20238:33 amRNSOperational Update
24th Mar 20232:33 pmRNSGrant and Vesting of Restricted Share Units
17th Mar 20231:54 pmRNSMaterials publicly filed in the CCAA Proceedings
16th Mar 20233:58 pmRNSCCAA Proceedings
14th Mar 20239:12 amRNSMaterials publicly filed in the CCAA Proceedings
8th Mar 20237:00 amRNSMaterials publicly filed in the CCAA Proceedings
7th Mar 20237:00 amRNSCorrection: Materials publicly filed
6th Mar 20236:15 pmRNSMaterials publicly filed in the CCAA Proceedings
28th Feb 20236:15 pmRNSMaterials publicly filed in the CCAA Proceedings
28th Feb 20237:00 amRNSRambler Announces Strategic Process
27th Feb 20237:00 amRNSApplication for Initial Order for CCAA Protection
20th Feb 20237:00 amRNSUpdate on Gold Stream Repurchase Agreement
17th Feb 20237:00 amRNSUpdate on Financing and Operations
10th Feb 20237:00 amRNSUpdate on Gold Streaming Agreement
18th Jan 20237:00 amRNSQ4 2022 Operational Results
5th Dec 20223:49 pmRNSForward Sale on Copper Production
15th Nov 20227:00 amRNSForward Sale on Copper Production
10th Nov 20229:28 amRNSRambler Provides an Operational Update
1st Nov 20227:00 amRNSRambler Provides an Update on Financial Position
27th Oct 20227:30 amRNSSuspension - Rambler Metals & Mining PLC
27th Oct 20227:01 amRNSBlock Listing Six Monthly Return
27th Oct 20227:00 amRNSRambler Provides an Update on Financial Position
21st Oct 20227:00 amRNSQ3 2022 Operational Results
3rd Oct 20229:05 amRNSSecond Price Monitoring Extn
3rd Oct 20229:00 amRNSPrice Monitoring Extension
30th Sep 20222:06 pmRNSSecond Price Monitoring Extn
30th Sep 20222:00 pmRNSPrice Monitoring Extension
28th Sep 20224:41 pmRNSSecond Price Monitoring Extn
28th Sep 20224:35 pmRNSPrice Monitoring Extension
27th Sep 20224:40 pmRNSSecond Price Monitoring Extn
27th Sep 20224:35 pmRNSPrice Monitoring Extension
27th Sep 20222:00 pmRNSPrice Monitoring Extension
26th Sep 20224:32 pmRNSFinancial Results Half Year Ended 30 June 2022
15th Sep 20222:05 pmRNSSecond Price Monitoring Extn
15th Sep 20222:00 pmRNSPrice Monitoring Extension
13th Sep 20224:41 pmRNSSecond Price Monitoring Extn
13th Sep 20224:35 pmRNSPrice Monitoring Extension
9th Sep 20224:40 pmRNSSecond Price Monitoring Extn
9th Sep 20224:35 pmRNSPrice Monitoring Extension
9th Sep 202212:19 pmRNSRambler Provides a Corporate Update
1st Sep 20227:00 amRNSSignificance of Stope In-fill Drilling Program
23rd Aug 20227:00 amRNSRambler Updates 2022 Diamond Drilling Program

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.