Final Results

18 May 2010 08:34

RNS Number : 1009M
Tanzanite One Limited
18 May 2010
 



 

TanzaniteOne

2009 Financial Year Results

 

TanzaniteOne (AIM:TNZ) today announces its final results for the 12 months ended 31 December 2009.

 

Highlights

 

Financial

·; EBIDTA, loss of $1.2 million ($0.2 million excluding a one-off provision for missing tanzanite inventory from the Company's now closed South African office),

o 75% improvement from the 2008 EBIDTA loss of $4.8 million

·; Operating costs decreased 45% from $18.0 million in 2008 to $9.9 million in 2009

·; Net loss reduced by 71% from $8.7 million for the previous year to $2.5 million

·; Net loss of $2.5 million impacted by one-off charges relating to missing tanzanite inventory of $1.0 million

·; Revenues decreased by 54% to $12.5 million, reflecting reduced production as a result of the impact of the downturn in the global economy on the luxury goods segment

·; Gross margin of 48%, up from 40% in 2008 due to a combination of cost containment and a gradual increase in prices

·; Consolidated cash and cash equivalents at 31 December of $1.6 million

·; Tanzanite inventory stock at 31 December of $4.1 million

 

Operations

·; Tanzanite production of 1.9 million carats, 19% ahead of the internal target and 14% down on the prior year

·; 10% decrease in tonnes processed to 38,154 tonnes when compared to previous year

·; Average grade of 50 carats per tonne compared with 52 carats per tonne in previous year

·; Gradual increases in tanzanite prices towards year end

·; $6.6 million sales realised through the new Dubai marketing office that commenced operations during the second half of the year

·; Capital programs and exploration expenditure were strictly contained and some deferred pending the recovery in the tanzanite market

·; Drilling and sampling of the Tsavorite project commenced

Strategic

·; Successfully raised $5.3 million during the year through private placement

·; Appointment of Dr Bernard Olivier as CEO and Zane Swanepoel as COO (subsequent to year end)

·; Bye-laws amended to incorporate takeover protections

·; Acquisition of Tsavorite project completed

 

Outlook

·; First sight of 2010 achieved a 16.5% price increase compared to November 2009 sight

·; Production ramp-up programme re-initiated on the back of increased demand in 2010

·; 2010 production target of 2.2 million carats

·; Conversion of the Marketing and Sales MoU's to JV agreements

 

 

 

Commenting today Bernard Olivier, Chief Executive Officer said:

 

"Due to the economic crisis in the latter half of 2008, the beginning of 2009 saw weak demand for luxury goods and very low gemstone prices. As 2009 progressed the Tanzanite price, as mirrored in the diamond industry, made a consistent recovery, a trend reflected in our ongoing sight results. In addition to improving prices, our work optimising and streamlining operations quickly delivered tangible improvements to TanzaniteOne's margins. Operational optimisation resulted in a 19% increase in recovery of tanzanite compared to our 2008 forecast and 45% reduction in our operating costs. We have also achieved a 16.5% price increase from our first sight of 2010 compared to the November 2009 sight and accomplished impressive sales of $6.6 million, realised via our new Dubai marketing office. Our priority is to deliver on our core objective to continue to expand our tanzanite production, with our high-tech gemstone extraction operations, and achieve our production target of 2.2 million carats for 2010."

 

 

For more information please contact:

 

Willi Boehm

Company Secretary

+61 409 969 955

 

Bernard Olivier

Chief Executive Officer

+61 4089 481812

 

Nominated Advisor & Broker (AIM)

Ambrian Partners Limited

Richard Greenfield/ Richard Chase

+44 (0) 20 7634 4700

 

Threadneedle Communications

Laurence Read/Beth Harris

+44 (0)207653 9855

+44 (0)7979 955 923

 

 

Key Statistics - 2009

 

Key statistics:

FY 2009

FY 2008

Movement

EBIDTA loss (excluding provision for missing inventory)

($0.2)

($4.8)

(96%)

Net (loss)/profit

($2.5 m)

($8.7 m)

(71%)

Revenue

$12.5

$26.9 m

(54%)

Gross margin

48%

40%

20%

Depreciation and amortisation

($2.9)

($2.5)

16%

Corporate administration and other operating costs

($2.7)

($3.4)

(21%)

Mine administration

($2.4)

($3.1)

(23%)

Tanzanite inventory stock

$4.1

$5.1

(20%)

Cash and cash equivalents excluding overdraft

$2.2

$1.5

47%

Tonnes processed

38,154

42,318

(10%)

Carats recovered

1.9 million

2.2 million

(14%)

Carats per tonne

50

52

(4%)

On mine cash costs per carat

$3.63

$3.60

(1%)

 

 

 

Financial Performance

 

TanzaniteOne showed a significant improvement on the previous corresponding period with loss after tax reduced by 71% from $8.7 million in 2008 (US11.62 cents per share) to $2.5 million (US 2.54 cents per share) for the year ended 31 December 2009.

 

The result for the year was heavily influenced by a significant reduction in sales revenue experienced during the period, which saw sales decrease by 54% compared to the prior year. This was largely due to the impact of the global economic downturn on the global luxury goods sector to which the company responded by cutting production to contain costs.  

 

The result was also adversely affected by the recognition of a provision of $1.0 million for missing tanzanite inventory in South Africa for which management are currently pursuing insurance and legal channels to recover. The company's South African office has since been closed.

 

The Group achieved a gross margin for the year of 48% compared to 40% in 2008. The increase in gross margin was due to a combination of gradually increasing prices, and cost management and control.

 

Corporate administration and other operating costs of $2.7 million reflected costs incurred in administering the company's stock exchange listing, corporate compliance, investor relations activity, financial and legal consulting and non-recurring costs associated with the mergers and acquisitions activity. Costs are expected to reduce significantly in 2010.

 

Earnings before interest, taxes, depreciation and amortisation (EBITDA) improved by 75% from a loss of $4.8million in 2008 to a loss of $1.2 million. If the once off provision for missing inventory from the South African office is excluded, EBIDTA improved 96% to a loss of $0.2 million.

 

Operating costs decreased 45% from $18.0 million in 2008 to $9.9 million in 2009 and were down 22% compared to 2007 while tanzanite production levels were 0.2 million carats lower in 2007.

 

Inventory of tanzanite decreased 20% to $4.1 million as a result of the company being more successful than in the previous year in selling lower value stones.

 

Capital expenditure for the year of $2.8 million included the purchase of a new generator, development and exploration expenditure and other mining equipment.

 

TanzaniteOne's cash position has benefited post year-end with $1.4 million being received from debtors and $2.7 million through the sale of rough and polished tanzanite. The first sight sale for 2010 was held during March and raised $1.6 million.

 

Contingent liability

 

The activities of Tanzanite One Mauritius Limited, a wholly owned subsidiary of the Company have been wound down as a result of the effects of the global financial crisis on its operational viability. There is a possibility that the Company risks losing its South African tax residence status and could incur a tax liability of $1.4 million if the company did not develop and implement a strategy on operational viability. Management are aware of this situation and have already implemented certain structures and plan as part of its group sales and marketing restructure program to ensure that the residence status is not lost. Tanzanite One Mauritius forms and integral part of this revised sales initiatives being developed and is expected to lead the group's new entry into new market segments that have been identified by the group

 

Dividend

 

The directors have not declared a final dividend. The Board has a strong history of rewarding shareholders with dividends but feels it prudent to defer further dividends until market conditions strengthen.

 

Outlook

 

The sights conducted in March reflected an overall price increase of 16.5% and 26% for the upper ranges (category A and B). There is an indication of demand for the product exceeding supply, signalling a strengthening of the tanzanite gemstone market. The Company is confident that it will be able to participate in the recovery in the global coloured gemstone markets and maintain its position as the premier company in this sector.

 

Production

 

The tanzanite resource is divided into five blocks. TanzaniteOne in Block C undertakes larger scale mining, medium scale mining is undertaken by Kilimanjaro Mining in Block A and Tanzanite Africa in Block D-extension. The Company's neighbouring Blocks B and D are mined largely by artisanal miners. This poses a challenge for TanzaniteOne, notably in terms of undermining, whereby, the artisanal miners are mining into TanzaniteOne's designated license area.

 

Production for the year totalled 1,9 million carats of tanzanite, from the processing of 38,154 tonnes at an average recovery of 50 carats per tonne. The processing and crushing plant continues to operate on a single shift basis. There is sufficient capacity to increase production through the introduction of a second shift at the plant as and when demand improves.

 

The Company's ability to increase production to 3 million carats per annum remains unchanged, with production currently being increased conservatively as markets slowly return to normality. Responding to the uncertainties created by volatility in the world financial markets production was decreased 10% from the 2008 tonnes processed. Production rates were greatly reduced in the first half of 2009 but were increased in the second half of 2009 as markets began to stabilised.

   

On Mine Cash Costs

 

On mine cash costs for the period increased by only 1% to $3.63 per carat from $3.60 in 2008 despite significantly reduced production. This was as mainly a result of strict cash and cost management efforts at the mineand the aggressive cost reduction strategy implemented by the Company during 2009. Cost reduction remains a primary focus with increased attention on improved efficiencies by way of selective stoping, restructured mine procurement policies and the recycling of used equipment. On mine cash costs include operating costs, mine administration costs and royalty charges incurred at the Merelani mine. With the production target now increased to 2.2 million carats for 2010, cash costs on a per carat basis are expected to reduce compared to 2009.

 

Production Statistics

 

2009

2008

Movement

Tonnes Processed

38,154

42,381

(10%)

Carats per tonne

50

52

(4%)

Production (carats recovered)

1.9 million

2.2 million

(14%)

On mine cash costs per carat *

$3.63*

$3.60*

1%

On mine revenue per carat

$4.90**

$7.07**

(31%)

 

*On mine cash costs include operating costs, mine administration costs and royalty charges incurred at Merelani mine

 

**Reduction in revenue per carat achieved is as a direct result of the lower overall quality of produced material and the drop in prices

 

Safety and Training

 

The Company experienced no fatalities during the year and only three Lost Workday Cases were reported. The Lost Time Injury Frequency Rate ("LTIFR") for 2009 was only 0.44. This is testimony to the Company's focus on safety and the success of the Safety and Training Department's safety awareness and training initiatives.

 

Training emphasis focused on skills upliftment and exposure to outcomes based training and assessment. This style of training consists of both theory and practical assignments. The aim for the future is to do multi-skilling type training, which ensures depth as well as flexibility at the work face. This will also ensure succession planning in the lower ranks.

 

The following number of persons have been trained and found competent. Certificates of excellence have been issued.

 

Scraper winch operator

8

Explosives handlers/chargers

28

Jack hammer operators

28

Supervisory skills

12

Team leader training

18

Blasting certificate refresher

 6

 

Social Responsibility

 

TanzaniteOne is committed in supporting the local community within its designated mining area. In 2009, the Company has supplied 90 bunk beds to Naisinyai Secondary School and is currently in the process of delivering 180 mattresses for the beds supplied. Several initiatives have been set up by TanzaniteOne to broaden assistance within Simanjiro District. By establishing a Committee involving members from TanzaniteOne, Naisinyai village council and Merelani town council, the Company is working at broadening the scope of community support to these communities by looking at providing support in the construction of dormitories, mortuaries, health centres as well as assisting in the construction of classrooms in some secondary schools.

 

TanzaniteOne continues to maintain and repair the dirt road from Kilimanjaro International Airport to the mine. The Company plans to conduct a Charitable Eye Care Mission once again in the very near future to provide treatment to people with eye problems.

 

Lastly, TanzaniteOne also supplies water to Naisinyai village for domestic and livestock use. In the recent past, TanzaniteOne has offered 10 bursaries to students from various secondary schools within Simanjiro District in an effort to promote education in the district.

 

Marketing

 

The slowdown in the market in late 2008 and early 2009 allowed for a significant evaluation of the sales and marketing processes and strategies. Sorting and valuation process improvements have resulted in the extraction of greater valuation from previously lower contributing categories.

 

New marketing initiatives targeting growth of the lighter and included material were launched with a target of opening up in new markets, thus expanding the tanzanite distribution. Cutting and polishing technologies have been implemented to realize the maximum value that these categories are able to deliver. As economies begin to pick up and retail restocking occurs, this is expected to feed through into sales.

 

TanzaniteOne CuttingEdge was also launched in 2009 and resulted in the establishment of two Memoranda of Understandings ("MoU's") with high technology processing partners that will lead the value-addition process and movement of goods into markets less targeted to date.

  

TanzaniteOne Trading

During 2009, 56,520 carats of rough tanzanite were purchased for a total of US$2.0 million. Of this, US$1.3 million was spent on purchasing large size A, B quality (>2 gram) material with a total weight of 23,374 carats.

 

The Tanzanite Experience (TTE)

 

The Tanzanite Experience retail showcase expanded during 2009 to three locations, including a Mine Visitor Centre. The product mix was improved with retail experience, and good linkages made with the Tanzanian tourism industry provided a regular stream of clients.

 

 

Tsavorite

 

Work on the Tsavorite exploration area commenced during the third quarter of 2009 and resulted in the following exploration activities being conducted in 2009:

 

1. 13 Drill lines (19 kilometres) were cleared and surveyed

2. 41 Drill holes were drilled to bedrock or a maximum depth of 26 metres

3. 818 metres of RAB drilling completed

4. 9 Pits, spaced at 50 metre intervals, were dug to an average depth of 10 metres

5. On site treatment plant was commissioned

6. 2 bulk samples of ca. 40bcm were treated by the on site bulk treatment plant (results pending)

 

Corporate Matters

In April 2009, the Company successfully passed amendments to its bye-laws with a 79.71% in favour vote. The amendments now afford shareholder equivalent takeover protection in line with standard UK practice and ensures that all shareholders are treated equally.

In May 2009, TanzaniteOne raised £3.49 million (approximately US$5.3 million) through a private placement of 23,270,469 common shares at 15p per Placing Share. The proceeds of the private placement enabled the company to continue acquiring gem quality tanzanite in the local market at a time of significant price volatility, to fund the tsavorite exploration programme, fund further development work on the tanzanite mine and provide general working capital for the group.

 

Board and Management (post reporting period)

 

In March 2010 the Company appointment of Dr Bernard Olivier, aged 34, as Chief Executive Officer, having served the Company since 2008 as a Director. In addition to being an expert on Tanzanite geology, Dr Olivier has worked with a series of mining companies helping to develop value from their core assets. His appointment to the CEO role aims to leverage more extensively this commerciality combined with in-depth knowledge of coloured gemstones.

 

As part of the Company's strategic restructuring Mr Zane Swanepoel, aged 50, becomes Chief Operating Officer - Tanzania. Mr Swanepoel, based in Tanzania, will devote himself fully to operational mining and development work in Tanzania.

 

Glossary

 

ct

Carat

 

dollar or $

United States Dollar

 

g/t

grammes per tonne, measurement unit of grade (1g/t = 1 part per m)

 

JORC code

Australasian code for reporting of Mineral Resources and Ore Reserves

 

LTIFR

Lost Time Injury Frequency Rate, being the number of lost-time injuries expressed as a rate per 200,000 man-hours worked

 

NOSA

National Occupational Safety Association

 

On mine cash costs

On mine cash costs include operating costs, mine administration costs and royalty charges incurred at Merelani mine

 

tonne

1 Metric tonne (1,000kg)

 

 

 

Financial Statements

 

TanzaniteOne Limited

Condensed Consolidated Statement of Comprehensive Income

Year ended 31 December 2009

(Unaudited)

($000)

 

FY 2009

FY 2008

Revenue

12,459

26,895

Cost of sales

(6,458)

(16,213)

Gross profit

6,001

10,682

Gross margin %

48%

40%

Corporate Administration and other operating costs

(2,729)

(3,363)

Defence costs

-

(1,703)

Mine Administration

(2,449)

(3,140)

Selling and distribution costs

(1,700)

(4,241)

Royalties

(337)

(1,226)

Interest income received

17

72

Foreign exchange gains/(losses)

1,126

(1,826)

Financing costs paid

(138)

(81)

Loss before depreciation, amortisation and missing inventory

 

(209)

(4,826)

Missing inventory

(963)

-

Depreciation and amortisation

(2,853)

(2,500)

Loss before tax

(4,025)

 

(7,326)

 

Income tax credit/(expense)

1,570

 

(1,381)

 

Loss after tax

(2,455)

 

(8,707)

 

Non-controlling interest

 

46

 

52

Loss attributable to equity holders of parent

(2,409)

(8,655)

EPS (basic - cents)

(2.54)

(11.62)

EPS (diluted - cents)

(2.48)

 

(10.47)

 

 

 

 

 

TanzaniteOne Limited Condensed Consolidated Statement of Financial Position As at 31 December 2009

(Unaudited) ($'000)

 

2009

2008

Non-current assets

Property, plant and equipment

31,882

29,892

Inventory

129

327

Deferred tax assets

1,696

193

Total non-current assets

33,707

30,412

Current assets

Inventory

3,979

4,756

Income tax receivable

1,980

1,916

Trade and other receivables

3,184

2,647

Cash and cash equivalents

2,193

1,491

Total current assets

11,336

10,810

Total assets

45,043

41,222

Equity

Issued share capital

32

22

Share premium

46,020

38,709

Share options outstanding

706

706

Foreign currency translation reserve

(684)

(20)

Retained earnings

(8,728)

(6,319)

Total equity attributable to parent equity holders

37,346

33,098

Non-controlling interest

(42)

4

Total equity

37,304

33,102

Non-current liabilities

Interest-bearing borrowings

804

378

Provisions

107

100

Deferred tax

5,417

5,140

Total non-current liabilities

6,328

5,618

Current liabilities

Bank overdraft

570

697

Interest-bearing borrowings

196

6

Income tax payable

-

28

Trade and other payables

645

1,771

Total current liabilities

1,411

2,502

Total liabilities

7,739

8,120

Total equity and liabilities

45,843

41,222

 

 

 

Number of shares in issue (million)

106.3

74.5

Net asset value per share (US cents)

35.08

44.45

 

 

 

 

 

 

TanzaniteOne Limited Condensed Consolidated Statement of Cash Flows For the Year Ended 31 December 2009

(Unaudited) ($'000)

 

 

 

 

FY 2009

FY 2008

Cash flows from operating activities

Cash (utilised in)/generated from operations

(2,191)

3,220

Interest income received

17

72

Financing cost paid

(138)

(75)

Taxation paid

(6)

(1,666)

Net cash (to)/ from operating activities

(2,318)

1,551

Cash flows from investing activities

Acquisitions of property, plant and equipment

(2,810)

(5,433)

Net cash to investing activities

(2,810)

(5,433)

Cash flows from financing activities

Net proceeds from issue of share capital

5,341

-

Repayment of interest-bearing borrowings

616

(526)

Dividends paid

-

(7,733)

Net cash from/ (to) financing activities

5,957

(8,259)

Net increase/(decrease) in cash and cash equivalents

829

(12,141)

Cash and cash equivalents at the beginning of the year

794

12,935

Cash and cash equivalents at the end of the year

1,623

 

794

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FR APMRTMBJBMMM
Date   Source Headline
7th Dec 20203:00 pmRNSChange of Name and Grant of Options
3rd Dec 20201:54 pmRNSHolding(s) in Company
23rd Nov 20204:45 pmRNSResult of AGM and Total Voting Rights
10th Nov 20208:00 amRNSSchedule One - Richland Resources Ltd
2nd Nov 20207:00 amRNSUpdate re Proposed Reverse Takeover Transaction
29th Sep 20203:30 pmRNSInterim Results for half-year ended 30 June 2020
27th Jul 20207:00 amRNSProposed Reverse Takeover Transaction
1st Jul 20207:30 amRNSSuspension of Trading on AIM & Corporate Update
1st Jul 20207:30 amRNSSuspension - Richland Resources Ltd
23rd Apr 20202:05 pmRNSSecond Price Monitoring Extn
23rd Apr 20202:01 pmRNSPrice Monitoring Extension
23rd Apr 202010:15 amRNSHolding(s) in Company
7th Apr 202011:15 amRNSFinal Results
2nd Apr 20204:41 pmRNSSecond Price Monitoring Extn
2nd Apr 20204:36 pmRNSPrice Monitoring Extension
31st Mar 202010:00 amRNSHolding(s) in Company
20th Mar 20202:20 pmRNSHolding(s) in Company
17th Mar 20204:41 pmRNSSecond Price Monitoring Extn
17th Mar 20204:36 pmRNSPrice Monitoring Extension
12th Mar 20203:30 pmRNSPlacing of approximately £100,000 gross
10th Mar 20204:12 pmRNSHolding(s) in Company
3rd Mar 202011:02 amRNSHolding(s) in Company
26th Feb 20202:47 pmRNSHolding(s) in Company
13th Jan 20207:00 amRNSEquity Fundraising of £150,000
2nd Jan 20207:00 amRNSCompletion of Disposal of Capricorn Sapphire
23rd Dec 20197:00 amRNSExtension and Amendment to Option Agreement
16th Dec 20197:00 amRNSExtension and Amendment to Option Agreement
9th Dec 20197:00 amRNSFurther Extension to Amended Option Agreement
18th Nov 20197:00 amRNSExtension to Amended Option Agreement
31st Oct 20199:04 amRNSExtension to Amended Option Agreement
30th Sep 20197:00 amRNSInterim Results for half-year ended 30 June 2019
29th Aug 20192:30 pmRNSFee Conversions and Director's Dealing
21st Aug 20199:01 amRNSHolding(s) in Company
19th Aug 20194:53 pmRNSHolding(s) in Company
19th Aug 20194:51 pmRNSHolding(s) in Company
19th Aug 20193:47 pmRNSResult of AGM and Update re: Option Agreement
29th Jul 20198:39 amRNSNotice of Annual General Meeting
22nd Jul 20197:00 amRNSAmendment to Option Agreement
18th Jul 201910:47 amRNSUpdate re: Option Agreement
9th Jul 20191:03 pmRNSHolding(s) in Company
9th Jul 201912:32 pmRNSHolding(s) in Company
9th Jul 201912:27 pmRNSHolding(s) in Company
4th Jul 20197:15 amRNSEquity Fundraising & Appointment of Broker
28th Jun 201911:30 amRNSFinal Results
3rd Jun 20197:00 amRNSExtension of Loan Facility and Strategy Update
1st May 20197:30 amRNSExtension of Loan Facility and Strategy Update
1st Apr 20197:00 amRNSExtension of Loan Facility and Strategy Update
28th Feb 201912:00 pmRNSExtension of Loan Facility and Strategy Update
2nd Jan 20197:00 amRNSStrategic update and Convertible Loan Facility
28th Sep 20184:20 pmRNSInterim Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.