Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Operation and Production Update

7 Dec 2020 07:00

RNS Number : 6747H
President Energy PLC
07 December 2020
 

 

 

7 December 2020

 

PRESIDENT ENERGY PLC

("President" or the "Company")

 

Operation and production update

Production hits 4,000 boepd

Investor conference call scheduled

President Energy (AIM: PPC), the energy company with a diverse portfolio of production and exploration assets, announces an operations and production update in relation to its activities across the Group.

 

Key points

Compressor at Las Bases field, Rio Negro, now commissioned

Newly drilled well LB-1001 at the Las Bases field opened up and producing, new EVN-x1 at the Estancia Vieja field well to follow

Production in Salta, Argentina stable and South Louisiana, USA steady

Total current instantaneous Group net production estimated at approximately 4,000 boepd

Current net gas production in Argentina approximately 2,000 boepd

The Company is currently finalising plans for next year's capital expenditure

Investor conference call scheduled for 11:00 (GMT) on Tuesday 8th December 2020 

 

 

Operations

 

The new compressor infrastructure at the Las Bases field has been commissioned and is in operation. The compressor enables more gas to be delivered from the Company's Estancia Vieja gas wells. Accordingly, this is the first time four wells in this field have been able to produce together and are now flowing gas to market through President's pipeline infrastructure. The Company has identified potential to drill further wells in that field.

 

At the same time, the newly drilled LB-1001 (gas) well has been placed on production, with aggregate production from this well is currently ahead of expectation. The recently tested well LB-1, as yet not on stream, will be connected and placed into production before year end. Likewise the new well EVN-x1 is currently off-line having a pump fitted. President will monitor the results from that well in due course with a view to drilling shallow appraisal and production gas wells in the Las Bases field in 2021. Current cost projections per well, including artificial stimulation are around US$1 million.

 

The production from the Puesto Guardian concession in Salta is stable. As previously announced, President is progressing with planning and a feasibility study with a view to drilling 2 or 3 vertical development oil wells in 2021 in the Dos Puntitas field, part of the Puesto Guardian concession, and is in the process of applying for the relevant environmental and location permissions. The last vertical well drilled in Dos Puntitas initially produced 250 boepd.

 

In South Louisiana, USA, production is steady with only small declines over the last 12 months. The Simmons 2 well having been off-line for repair for over two months has come back on line with total net production from the wells now approximately 280 boepd.

 

In the light of the overall progress made, operational plans for the next 13 months are now being prepared and will be announced in January 2021 after Board review.

 

 

Production

 

Aggregate group net production has now reached 4,000 boepd with virtually an even split between oil and gas.

 

This is a current daily production rate and demonstrates the level that President, on present evidence, considers the wells can deliver. As such this rate varies day by day as wells go on and off-line. The average rate over time is a more valuable representation of the production and these figure will be published at appropriate times.

 

Nevertheless the general increase in production, with no material increase in opex, will have a beneficial effect on the costs per barrel and the bottom line of the Company taking into account the base opex cost in the fields has already been largely covered by core production.

 

President is now considering the most expedient long term production levels for optimum field and reservoir management. Such consideration will, inter alia, take into account the fluctuation between Argentina's domestic summer and winter gas pricing and the ability to constrain or increase each well's production depending on all prevailing circumstances.

 

Prices

 

In relation to prices, the Company notes the recent positive upward movement of both the oil price and Argentina gas prices, the latter particularly welcome since it coincides with the Company materially increasing its gas output.

 

The oil price receivable by President for December production is estimated at more than the US$42 per barrel mark for the first time since March with the current spot gas prices achieved in the first week of December being US$2.10 per MMBtu which prices fluctuate week by week. These prices permit the consideration of the drilling expenditure in 2021 referred to above.

 

 

Peter Levine, Chairman, commented

 

"Steady progress is being achieved but we have the capacity within ourselves to build on this and achieve more. In this regard the announcement today and those made recently demonstrate such capability and underline the potential in our assets which we continue to work hard to realise.

 

"We look forward to increased activity next year and expect to make an announcement within the next two months regarding future plans and timing".

Conference Call

 

The Company will be hosting a conference call, focussing on today's announcement, for Investors at 11:00 (GMT) on Tuesday 8th December 2020.

 

Conference call dial-in details:

 

· United Kingdom Toll-Free: 08003589473 PIN: 56808439#

· United Kingdom Toll:  +44 3333000804 PIN: 56808439#

 

 

 

 Glossary:

 

Boepd means barrels of oil equivalent (oil and gas) per day

LB means a well in Las Bases field, Rio Negro Province, Argentina

M3/d means cubic metres of production of gas or oil as the case may be

MMBtu means Million british thermal units of gas

MMcf/d means Million standard cubic feet per day

P50 means mid-case

 

 

Contact:

President Energy PLC

Rob Shepherd, Group FD

Nikita Levine, Investor Relations

 

 

 

+44 (0) 207 016 7950

 Info@presidentpc.com

finnCap (Nominated Advisor)

Christopher Raggett, Charlie Beeson

 

+44 (0) 207 220 0500

 

Shore Capital (Corporate Broker)

Jerry Keen, Antonio Bossi

 

 

+44 (0) 207 408 4090

 

 

Notes to Editors

 

President Energy is an oil and gas company listed on the AIM market of the London Stock Exchange (PPC.L) primarily focused in Argentina, with a diverse portfolio of operated onshore producing and exploration assets.

 

The Company has operated interests in the Puesto Flores, Estancia Vieja, Puesto Prado and Las Bases Concessions, and Angostura exploration contract, all of which are situated in the Rio Negro Province in the Neuquén Basin of Argentina and in the Puesto Guardian Concession, in the Noroeste Basin in NW Argentina. Alongside this, President Energy has cash generative production assets in Louisiana, USA and further significant exploration and development opportunities through its acreage in Paraguay and Argentina.

 

The Group is also actively pursuing value accretive acquisitions of high-quality production and development assets capable of delivering positive cash flows and shareholder returns. With a strong strategic and institutional base of support, including the international commodity trader and logistics company Trafigura, an in-country management team as well as the Chairman whose interests as the largest shareholder are aligned to those of its shareholders, President Energy gives UK investors access to an energy growth story combined with world class standards of corporate governance, environmental and social responsibility.

This announcement contains inside information for the purposes of article 7 of Regulation 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDUNUKRRNUURRA
Date   Source Headline
26th Jul 20067:01 amRNSAppointment of Nomad
24th Jul 20067:00 amRNSNative Title Agreement
20th Jul 20064:44 pmRNSGrant of share options
19th Jul 20067:00 amRNSCalvin Deep Acquisition
28th Jun 20067:01 amRNSPreliminary Results
20th Jun 20067:00 amRNSActivity Update
9th Jun 20067:00 amRNSOperational update
26th May 20067:01 amRNSCoal bed methane prospect
22nd May 20064:43 pmRNSExercise of Options
15th May 20067:00 amRNSDelores Prospect
27th Apr 20067:02 amRNSActivity Update
24th Apr 20065:57 pmRNSExercise of Warrants
4th Apr 20067:01 amRNSVictory 1-21 Drilling Update
13th Mar 20062:00 pmRNSActivity Update
20th Feb 20064:16 pmRNSPlacing
14th Feb 20063:16 pmRNSOrion Lease Signed
7th Feb 20066:01 pmRNSHolding(s) in Company
7th Feb 20066:00 pmRNSHolding(s) in Company
3rd Feb 200610:32 amRNSCalvin Drilling Update
1st Feb 20063:59 pmRNSHolding(s) in Company
31st Jan 20062:33 pmRNSHolding(s) in Company
30th Jan 20062:00 pmRNSHolding(s) in Company
25th Jan 20065:36 pmRNSHolding(s) in Company
24th Jan 20067:00 amRNSCalvin Well Commercial
17th Nov 20053:51 pmRNSActivity Update
25th Oct 200511:21 amRNSHolding(s) in Company
11th Oct 20051:20 pmRNSActivity Update
30th Sep 20055:53 pmRNSInterim Results
22nd Sep 20052:14 pmRNSHurricane Rita
1st Sep 20057:00 amRNSHurricane Katrina
18th Aug 200510:59 amRNSHolding in Company
12th Aug 20057:00 amRNSPlacing
29th Jul 20057:00 amRNSOperational Update
16th Jun 20052:46 pmRNSActivity Update
19th May 20052:07 pmRNSDiscovery on Milford 36
11th May 20057:01 amRNSFinal Results
9th May 20059:00 amRNSSpudding of Well
5th Apr 20058:59 amRNSAppointment of Adviser
4th Feb 20053:09 pmRNSManagement Appointment
4th Jan 20052:43 pmRNSHolding in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.