If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Drilling and Workover Update

22 Sep 2021 07:00

RNS Number : 3493M
President Energy PLC
22 September 2021
 

 

 

22 September 2021

 

PRESIDENT ENERGY PLC

("President" or the "Company")

 

Drilling and Workover Update

 

President Energy (AIM: PPC), the energy company with a diverse portfolio of production and exploration assets, announces a drilling and workover update on various of its assets.

Puesto Guardian Concession, Salta Province, Argentina

The Company has signed a drilling services contract for three firm wells to be drilled at the Puesto Guardian Concession before the end of this year. The contract also includes an option to retain the rig into the New Year for a further two wells after drilling of the third firm well.

This will enable continued drilling in the Concession, should the results from the ongoing seismic reprocessing confirm two additional prospects that have been previously identified.

The first three wells will be drilled in the Dos Puntitas field and the two contingent wells for 2022 in the Pozo Escondido field.

Each well is estimated to cost US$3.5 million and have a drilling time of 45 days with a mean success case initial projected oil production of 40 m3/d (250 bopd).

Site clearance for the first well has begun with the rig due to be mobilised during the first days of October. Drilling of the first well is now expected to commence by the end of the third week in October with drilling of all three wells expected to be completed by the end of the year with the final well in that sequence expected to be on stream in the first part of January 2022.

Triche and Simmons 2 wells, Louisiana

Both these wells remain offline as they have for the last three months awaiting workover of the Triche well to reinstate production. The operation of the Triche well is required for the Simmons 2 well to operate, as the Simmons 2 well used the gas produced from the Triche for gas lift.

The Triche well has not performed optimally all year due to the progressive breakdown of the downhole gravel pack in the well used to constrain sand production. The frustrating delay in fixing the problem has been materially exacerbated by the effects of Hurricane Ida which devastated the locality.

A rig is now available, but the Company is awaiting barge availability. It is hoped that the workover will be completed by the end of October and the wells will work at the levels enjoyed last year namely at 300 boepd net to President half being oil. Realisation prices are robust with oil currently at approximately $70 per barrel. Reserves levels are unaffected with lower than expected depletion due to the constrained production.

Peter Levine, Chairman, commented

 

"We look forward to the drilling campaign in Salta. With current prices there comparable to Rio Negro and fixed opex already covered by existing production, the incremental production will make a good contribution to Group.

 

"Louisiana, for various reasons out of our control, has been frustrating for much of this year. However we are close to being back on track. Nevertheless, the events have given management cause to assess the future of our Louisana assets within the Group and we will do so at or around the end of the year once the wells are back online and have been producing for a period".

 

Glossary

Bopd means barrels of oil per day

Boepd means barrels of oil equivalent per day

 

Contact:

President Energy PLC

Nikita Levine, Investor Relations

 

 

+44 (0) 207 016 7950

 

 info@presidentpc.com

finnCap (Nominated Advisor and broker)

Christopher Raggett, Tim Harper

 

+44 (0) 207 220 0500

 

 

 

 

 

 

 

Notes to Editors

President Energy is an oil and gas company listed on the AIM market of the London Stock Exchange (PPC.L) primarily focused in Argentina, with a diverse portfolio of operated onshore producing and exploration assets.

 

The Company has operated interests in the Puesto Flores, Estancia Vieja, Puesto Prado and Las Bases Concessions, and Angostura exploration contract, all of which are situated in the Rio Negro Province in the Neuquén Basin of Argentina and in the Puesto Guardian Concession, in the Noroeste Basin in NW Argentina. Alongside this, President Energy has cash generative production assets in Louisiana, USA and further significant exploration and development opportunities through its acreage in Paraguay and Argentina.

 

The Group is also actively pursuing value accretive acquisitions of high-quality production and development assets capable of delivering positive cash flows and shareholder returns. With a strong strategic and institutional base of support, including the international commodity trader and logistics company Trafigura, an in-country management team as well as the Chairman whose interests as the largest shareholder are aligned to those of its shareholders, President Energy gives UK investors access to an energy growth story combined with world class standards of corporate governance, environmental and social responsibility.

This announcement contains inside information for the purposes of article 7 of Regulation 596/2014

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDEADNEADNFEFA
Date   Source Headline
26th Jul 20067:01 amRNSAppointment of Nomad
24th Jul 20067:00 amRNSNative Title Agreement
20th Jul 20064:44 pmRNSGrant of share options
19th Jul 20067:00 amRNSCalvin Deep Acquisition
28th Jun 20067:01 amRNSPreliminary Results
20th Jun 20067:00 amRNSActivity Update
9th Jun 20067:00 amRNSOperational update
26th May 20067:01 amRNSCoal bed methane prospect
22nd May 20064:43 pmRNSExercise of Options
15th May 20067:00 amRNSDelores Prospect
27th Apr 20067:02 amRNSActivity Update
24th Apr 20065:57 pmRNSExercise of Warrants
4th Apr 20067:01 amRNSVictory 1-21 Drilling Update
13th Mar 20062:00 pmRNSActivity Update
20th Feb 20064:16 pmRNSPlacing
14th Feb 20063:16 pmRNSOrion Lease Signed
7th Feb 20066:01 pmRNSHolding(s) in Company
7th Feb 20066:00 pmRNSHolding(s) in Company
3rd Feb 200610:32 amRNSCalvin Drilling Update
1st Feb 20063:59 pmRNSHolding(s) in Company
31st Jan 20062:33 pmRNSHolding(s) in Company
30th Jan 20062:00 pmRNSHolding(s) in Company
25th Jan 20065:36 pmRNSHolding(s) in Company
24th Jan 20067:00 amRNSCalvin Well Commercial
17th Nov 20053:51 pmRNSActivity Update
25th Oct 200511:21 amRNSHolding(s) in Company
11th Oct 20051:20 pmRNSActivity Update
30th Sep 20055:53 pmRNSInterim Results
22nd Sep 20052:14 pmRNSHurricane Rita
1st Sep 20057:00 amRNSHurricane Katrina
18th Aug 200510:59 amRNSHolding in Company
12th Aug 20057:00 amRNSPlacing
29th Jul 20057:00 amRNSOperational Update
16th Jun 20052:46 pmRNSActivity Update
19th May 20052:07 pmRNSDiscovery on Milford 36
11th May 20057:01 amRNSFinal Results
9th May 20059:00 amRNSSpudding of Well
5th Apr 20058:59 amRNSAppointment of Adviser
4th Feb 20053:09 pmRNSManagement Appointment
4th Jan 20052:43 pmRNSHolding in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.