The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Argentina Workover and Group Production Update

2 Aug 2017 07:00

RNS Number : 8091M
President Energy PLC
02 August 2017
 

2 August 2017

PRESIDENT ENERGY PLC

("President", "the Company" or "President Energy")

 

Puesto Guardian Concession Workover and Group Production Update

Well PG-19 coming back into production after 19 years

 

President Energy (AIM: PPC), the upstream oil and gas company, provides an update on its continued work-over programme at its Puesto Guardian Concession, Argentina ("the Concession") together with an update on Group production.

Workover Programme

Since the Company's last update on 17 July 2017, President has successfully completed the workover of Well PG-19 at the Puesto Guardian Field.

 

PG-19, originally drilled in 1983, had been shut in for the last 19 years, by which time it already had produced 450,000 barrels of oil.

 

The workover included cleaning out the bottom hole section and perforating a previously ignored section of the producing Cretacious formation followed by an acid stimulation.

 

Both before and after the stimulation, successful swabbing produced light oil to surface, commensurate in quality with that produced in the Puesto Guardian Field. Immediately prior to cessation of swabbing, the well, cleaning up with impurities still present from the stimulation, had reached over 10% oil cut. A photo of the oil/water sample is posted on President's Twitter feed. Prior to the shut-in 19 years ago, the oil cut of PG-19 was 25%.

 

After a downhole jet pump is installed, work will commence to hook the well up to the Puesto Guardian battery. Taking into account the well history and whilst it is too early to be definitive, on the basis of historical information and up to date pressure data, by way example, an initial conservative gross fluid rate of 500-750 barrels per day would deliver 50-75bopd at a 10% oil cut.

 

The Workover Rig will then move to Well PG-20 in the Puesto Guardian Field, a well that was originally drilled in 1985, shut in from 2002, having produced a total of 650,000 barrels of oil in that period.

 

Group Production

 

Argentina

Argentinian production is currently limited by the significant ongoing infrastructure works at the Concession including installing five new surface pumps, photographs of two of which can now be seen on the Company's Twitter feed, lifting and cleaning out of existing downhole pumps, laying of production lines prior to hooking up new producing wells and the commissioning of two new water disposal wells to handle increased water generation arising from the new production wells. All these works are expected to be completed during September.

 

Accordingly, with the workover programme still continuing, whilst production is presently constrained to a maximum of approximately 600 bopd President intends to bring on stream an additional four producing wells during September with a further three wells, which are currently working at sub-optimal capacity, brought up to full volume within that same time period and a three well stimulation campaign also slated for that month.

 

Louisiana

After a prolonged period of shut-in due to heavy rains causing dangerously high water levels preventing offtake of oil by barges, production has now come back up to pre-shut in levels of 300 boepd net to President, with the most recent acquisition, Triche well, contributing comfortably in line with the expectations at the time of purchase.

 

Peter Levine, Chairman and Chief Executive, commented:

"It is good to see our producing well-stock further extended and we look forward to seeing PG-19 on stream.

Despite the challenges we have faced of working over old wells with a variety of foreseen and unforeseen downhole issues, this workover campaign has so far lasted 160 days of back to back seamlessly continuous work, without break or let up.

In that time and continuing even now, we have learned many things and operating teamwork and experience has been developed, not just internally, but also in conjunction with our main contractors. This capability is of significance as we move on to actively consider acquisitions of producing assets in the core heartlands of hydrocarbon production in Argentina".

Glossary

Bopd means barrels of oil per day

Boepd means barrels of oil equivalent

This announcement is inside information for the purposes of article 7 of Regulation 596/2014

 

Contact:

 

President Energy PLC

Peter Levine, Miles Biggins

+44 (0) 207 016 7950

 

finnCap (Nominated Advisor & Joint Broker)

Christopher Raggett, Scott Mathieson

 

+44 (0) 207 220 0573

BMO Capital Markets (Joint Broker)

Jeremy Low, Neil Haycock and Tom Rider

 

 +44 (0) 207 236 1010

 

Vigo Communications

Chris McMahon, Patrick d'Ancona

 

+44 (0) 207 830 9700

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBLGDIBBGBGRB
Date   Source Headline
24th Oct 20187:00 amRNSIssue of Equity
22nd Oct 20189:00 amRNSNew Website
22nd Oct 20187:00 amRNSDrilling update at Puesto Flores field, Argentina
15th Oct 20187:00 amRNSLouisiana Update
5th Oct 20185:17 pmRNSPDMR Shareholding
4th Oct 20184:21 pmRNSPDMR Shareholding
26th Sep 20187:00 amRNSInterim Results for H1 2018
24th Sep 20187:00 amRNSSpud of first new Puesto Flores development well
12th Sep 20187:00 amRNSPuesto Prado and Las Bases Concessions Update
28th Aug 201812:53 pmRNSPresenting at Oil Capital & Hosting Drinks Event
9th Aug 20187:00 amRNSTrading update
27th Jul 20187:00 amRNSPUESTO FLORES/ESTANCIA VIEJA CONCESSION UPDATE
11th Jul 20187:21 amRNSPosting of Corporate Video and Q&A
29th Jun 20183:00 pmRNSResult of AGM
29th Jun 201811:00 amRNSAGM GROUP UPDATE
29th Jun 20187:00 amRNSPDMR Shareholding
28th Jun 201812:35 pmRNSDirector/PDMR Shareholding
21st Jun 20187:00 amRNSDirector/PDMR Shareholding
20th Jun 20187:00 amRNSAward of Options
18th Jun 20187:00 amRNSARGENTINA UPDATE
7th Jun 20187:29 amRNSPosting of Annual Report and Notice of AGM
6th Jun 20185:19 pmRNSDirector/PDMR Shareholding
6th Jun 20187:00 amRNSFY Results for year ended 31 Dec 2017 & Q1 Update
14th May 20187:00 amRNSARGENTINA UPDATE
16th Apr 20187:25 amRNSPUESTO FLORES CONCESSION UPDATE
14th Mar 20187:00 amRNSDirector Appointments
12th Mar 20187:00 amRNSESTANCIA VIEJA SUCCESSFUL TEST RESULTS
5th Mar 20187:00 amRNSNew independent certified Argentine Reserves
28th Feb 20187:00 amRNSArgentinian Stock Exchange Secondary Listing
22nd Feb 20187:00 amRNSArgentina Trading Update
6th Feb 20183:51 pmRNSHolding(s) in Company
2nd Feb 20185:16 pmRNSHolding(s) in Company
12th Jan 20187:00 amRNSOperational Update
2nd Jan 20187:00 amRNSSale of Non-Operated Asset in Louisiana
15th Dec 20177:00 amRNSOperational Update
12th Dec 20177:00 amRNSLegislative approval of Extension Agreement
27th Nov 20177:00 amRNSPresident agrees Argentine Commercial Bank Loan
20th Nov 20172:02 pmRNSResult of Open Offer and Loan Conversion
16th Nov 20177:00 amRNSOperational Update
3rd Nov 20177:00 amRNSSalta Exploration Assets, Argentina Update
30th Oct 201711:54 amRNSHolding(s) in Company
30th Oct 20177:00 amRNSOpen Offer Announcement
23rd Oct 20174:53 pmRNSDirector/PDMR Shareholding
20th Oct 20177:00 amRNSProposed placing and open offer
17th Oct 20177:00 amRNSFirst Sale of oil from Puesto Flores Field
9th Oct 20177:00 amRNSOperational Update
29th Sep 20177:00 amRNSInterim Results
25th Sep 20173:54 pmRNSTR-1 Notification of Major Shareholdings
21st Sep 20175:55 pmRNSAcquisition of Assets in Argentina - Replacement
21st Sep 20177:00 amRNSAcquisition of Producing Assets in Argentina

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.