The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Argentina Workover and Group Production Update

2 Aug 2017 07:00

RNS Number : 8091M
President Energy PLC
02 August 2017
 

2 August 2017

PRESIDENT ENERGY PLC

("President", "the Company" or "President Energy")

 

Puesto Guardian Concession Workover and Group Production Update

Well PG-19 coming back into production after 19 years

 

President Energy (AIM: PPC), the upstream oil and gas company, provides an update on its continued work-over programme at its Puesto Guardian Concession, Argentina ("the Concession") together with an update on Group production.

Workover Programme

Since the Company's last update on 17 July 2017, President has successfully completed the workover of Well PG-19 at the Puesto Guardian Field.

 

PG-19, originally drilled in 1983, had been shut in for the last 19 years, by which time it already had produced 450,000 barrels of oil.

 

The workover included cleaning out the bottom hole section and perforating a previously ignored section of the producing Cretacious formation followed by an acid stimulation.

 

Both before and after the stimulation, successful swabbing produced light oil to surface, commensurate in quality with that produced in the Puesto Guardian Field. Immediately prior to cessation of swabbing, the well, cleaning up with impurities still present from the stimulation, had reached over 10% oil cut. A photo of the oil/water sample is posted on President's Twitter feed. Prior to the shut-in 19 years ago, the oil cut of PG-19 was 25%.

 

After a downhole jet pump is installed, work will commence to hook the well up to the Puesto Guardian battery. Taking into account the well history and whilst it is too early to be definitive, on the basis of historical information and up to date pressure data, by way example, an initial conservative gross fluid rate of 500-750 barrels per day would deliver 50-75bopd at a 10% oil cut.

 

The Workover Rig will then move to Well PG-20 in the Puesto Guardian Field, a well that was originally drilled in 1985, shut in from 2002, having produced a total of 650,000 barrels of oil in that period.

 

Group Production

 

Argentina

Argentinian production is currently limited by the significant ongoing infrastructure works at the Concession including installing five new surface pumps, photographs of two of which can now be seen on the Company's Twitter feed, lifting and cleaning out of existing downhole pumps, laying of production lines prior to hooking up new producing wells and the commissioning of two new water disposal wells to handle increased water generation arising from the new production wells. All these works are expected to be completed during September.

 

Accordingly, with the workover programme still continuing, whilst production is presently constrained to a maximum of approximately 600 bopd President intends to bring on stream an additional four producing wells during September with a further three wells, which are currently working at sub-optimal capacity, brought up to full volume within that same time period and a three well stimulation campaign also slated for that month.

 

Louisiana

After a prolonged period of shut-in due to heavy rains causing dangerously high water levels preventing offtake of oil by barges, production has now come back up to pre-shut in levels of 300 boepd net to President, with the most recent acquisition, Triche well, contributing comfortably in line with the expectations at the time of purchase.

 

Peter Levine, Chairman and Chief Executive, commented:

"It is good to see our producing well-stock further extended and we look forward to seeing PG-19 on stream.

Despite the challenges we have faced of working over old wells with a variety of foreseen and unforeseen downhole issues, this workover campaign has so far lasted 160 days of back to back seamlessly continuous work, without break or let up.

In that time and continuing even now, we have learned many things and operating teamwork and experience has been developed, not just internally, but also in conjunction with our main contractors. This capability is of significance as we move on to actively consider acquisitions of producing assets in the core heartlands of hydrocarbon production in Argentina".

Glossary

Bopd means barrels of oil per day

Boepd means barrels of oil equivalent

This announcement is inside information for the purposes of article 7 of Regulation 596/2014

 

Contact:

 

President Energy PLC

Peter Levine, Miles Biggins

+44 (0) 207 016 7950

 

finnCap (Nominated Advisor & Joint Broker)

Christopher Raggett, Scott Mathieson

 

+44 (0) 207 220 0573

BMO Capital Markets (Joint Broker)

Jeremy Low, Neil Haycock and Tom Rider

 

 +44 (0) 207 236 1010

 

Vigo Communications

Chris McMahon, Patrick d'Ancona

 

+44 (0) 207 830 9700

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBLGDIBBGBGRB
Date   Source Headline
5th Nov 20207:00 amRNSHolding(s) in Company
27th Oct 20207:00 amRNSDrilling Update
26th Oct 20202:15 pmRNSCGC Share Subscription
26th Oct 20207:00 amRNSUnaudited Interim Results and Current trading
26th Oct 20207:00 amRNSDrilling Update
20th Oct 20205:20 pmRNSHolding(s) in Company
14th Oct 20207:00 amRNSDrilling Update
7th Oct 20207:00 amRNSChange of Auditor
7th Oct 20207:00 amRNSDrilling Update
22nd Sep 20207:00 amRNSWorkover and Drilling Update
15th Sep 20207:00 amRNSOperational Update
3rd Sep 20207:00 amRNSOperational Update
26th Aug 20207:00 amRNSOperational and Corporate Update
28th Jul 202011:30 amRNSCGC Share Subscription
27th Jul 20207:00 amRNSOil Export and Production Update
22nd Jul 20202:00 pmRNSResult of AGM
20th Jul 20207:00 amRNSAGM and Investor Meet Company Presentation
13th Jul 20207:00 amRNSDrilling and Workover Update
26th Jun 20207:00 amRNSPosting of Annual Report and Notice of AGM
24th Jun 20205:12 pmRNSHolding(s) in Company
24th Jun 20205:09 pmRNSHolding(s) in Company
24th Jun 20207:00 amRNSDirector Appointment
22nd Jun 20202:07 pmRNSResult of General Meeting
22nd Jun 202011:54 amRNSAudited Results for year ended 31 December 2019
22nd Jun 20207:00 amRNSAppointment of sole broker
17th Jun 20204:23 pmRNSGeneral Meeting Update
15th Jun 20207:00 amRNSDrilling and workover plan update Rio Negro
5th Jun 20207:00 amRNSPosting of Circular and Notice of General Meeting
4th Jun 20204:41 pmRNSSecond Price Monitoring Extn
4th Jun 20204:36 pmRNSPrice Monitoring Extension
4th Jun 202011:06 amRNSSecond Price Monitoring Extn
4th Jun 202011:00 amRNSPrice Monitoring Extension
4th Jun 20207:00 amRNSResult of PrimaryBid Offer
3rd Jun 20204:31 pmRNSPrimaryBid.com Offer
3rd Jun 20204:30 pmRNSSubscription for new ordinary shares by Trafigura
19th May 202011:46 amRNSMarket Update
27th Apr 20207:00 amRNSCGC Share Subscription
23rd Apr 20202:51 pmRNSHolding(s) in Company
7th Apr 20205:14 pmRNSHolding(s) in Company
12th Mar 20207:00 amRNSMarket Update
3rd Mar 20207:00 amRNSNew Rio Negro pipeline update
27th Feb 20207:00 amRNSNew Company Presentation
7th Feb 20202:19 pmRNSPDMR Shareholding
6th Feb 202012:57 pmRNSResult of General Meeting
3rd Feb 20207:00 amRNS2019 full year Trading Update
29th Jan 20205:15 pmRNSHolding(s) in Company
28th Jan 20203:59 pmRNSChange of Registered Office
28th Jan 20203:58 pmRNSCGC Share Subscription
27th Jan 202011:55 amRNSHolding(s) in Company
27th Jan 20207:00 amRNSNew independently certified reserves report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.