The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPOLY.L Regulatory News (POLY)

  • There is currently no data for POLY

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Prognoz Mineral Resources Update

10 Oct 2018 07:00

RNS Number : 5575D
Polymetal International PLC
10 October 2018
 

Release time

IMMEDIATE LSE, MOEX: POLY / ADR: AUCOY

Date

10 October 2018

 

 

Polymetal International plc

Mineral resource estimate for Prognoz silver deposit

Polymetal announces the JORC (2012) Mineral Resource estimate for the Prognoz silver deposit. The fresh estimate upgrades the property's resources to 256 Moz of silver equivalent at 789 g/t.

"In-fill drilling results exceeded our expectations and strengthened our belief that Prognoz may succeed Dukat as one of the largest primary silver deposits in the world", said Vitaly Nesis, Group CEO of Polymetal.

HIGHLIGHTS

· The new estimate incorporates data from 532 additional diamond drill holes (71,276 m) completed by Polymetal in 2017-2018.

· Compared with the previous Mineral Resource estimate completed by Micon in 2009, Polymetal added lead and used higher cut-off grades together with conservative extrapolation parameters to ensure a more robust and reliable estimate. As a result, the new estimate in comparison with the previous one has the following key characteristics:

o Silver equivalent contained totaled 256 Moz at 789 g/t

o Pure silver contained decreased by 19% from 293 Moz to 237 Moz

o Average silver grade increased by 25% from 586 g/t to 731 g/t

o Average vein width increased by 15% from 1.9 m to 2.2 m

o The share of open-pit resources comprises 46%

o The share of resources within the Indicated category increased from 50% to 61%

o The share of resources in two largest veins (Main and Swamp) increased from 73% to 80%

· In 2019 Polymetal plans to complete the following work:

o 24.3 km of diamond drilling to upgrade the existing inferred resources to indicated category. Based on historic experience, the management expects at least 80% conversion rate

o 15.7 km of diamond drilling to establish new resources on extensions of Main and Swamp Zones along the strike as well as at Lucky, Spring, Faraway, and Sunny veins. Polymetal expects to add at least 60 Moz of contained silver after completing this campaign.

o Advanced metallurgical testing and detailed geometallurgical mapping of all indicated resources to establish the preferred processing route and tailings storage method. The most likely flowsheet will include both cyanidation and conventional sulfide flotation.

o Geotechnical studies to establish the basic design criteria for open pit optimization and the selection of underground mining system

o Comprehensive analysis of potential construction sites and sources of water and construction aggregates

These activities are necessary to complete the Pre-Feasibility Study (PFS) and estimate JORC-compliant ore reserves at Prognoz. The results of the PFS are expected in H1 2020. The delay in timing is largely driven by the need to better understand the limits of oxidation within mineralized material, a key input for the selection of the processing plant design criteria.

 Prognoz Mineral Resource estimate in accordance with the JORC Code (2012) as at 01 August 2018

 

Tonnage

Grade

Content

 

Kt

Ag, g/t

Pb, %

Ag Eq, g/t

Ag, Moz

Pb, Kt

Ag Eq, Moz

Indicated

 

 

 

 

 

 

 

Open-pit

2,930

779

2.4

833

73

70.9

79

Underground

2,640

842

1.9

917

71

49.0

78

Total Indicated

5,570

808

2.2

873

145

119.8

156

 

 

 

 

 

 

 

 

Inferred

 

 

 

 

 

 

 

Open-pit

1,770

610

2.2

660

35

39.7

38

Underground

2,730

650

1.4

682

57

38.2

62

Total Inferred

4,500

635

1.7

673

92

77.9

99

 

 

 

 

 

 

 

 

Indicated + Inferred

 

 

 

 

 

 

 

Open-pit

4,700

716

2.4

769

108

110.6

116

Underground

5,370

744

1.6

807

128

87.2

140

Total Indicated + Inferred

10,070

731

2.0

789

237

197.8

256

Notes: Mineral Resources are reported on the basis of a 106 g/t Ag cut-off for the open pit component (within an optimized pit shell, based on a US$ 16/oz silver price), and a 240 g/t Ag cut-off for the underground component (below the pit shell). A Pb price of US$ 2,200/t was used for the metal equivalent calculation only. For more information please refer to the JORC Table 1 in the attached file.

The Mineral Resource estimate was prepared by Polymetal and independently audited by SRK Consulting (Russia) Ltd, effective as at 1 August 2018.  The review was carried out Robin Simpson, who is employed full-time by SRK Consulting (Russia) Ltd, as a Principal Consultant (Resource Geology). Mr Simpson is a Member of the Australian Institute of Geoscientists (AIG), and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined by the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (JORC Code).

LOCATION

The Prognoz licence is located in the Verkhoyansk municipal district in the Republic of Sakha (Yakutia), part of the Russian Far East. The property is located approximately 450 km from the regional center of Yakutsk (population of 300,000) and approximately 220 km from the municipal center of Batagai (population of 3,700). The site is remote with seasonal access by winter road. There is no infrastructure at or near the property.

GEOLOGY

The property is located within the Verkhoyansk mobile belt of northeastern Yakutia. Silver-copper-lead-zinc mineralization, represented by quartz-carbonate-sulphide veins, is located in a sequence of sedimentary rocks composed of Triassic sandstones and siltstones. Nine mineralised zones are defined, with Main and Swamp being the largest (strike length of up to 4 km). Mineralized material is partially oxidised with the depth of weathering varying widely dependent on relief and proximity of water table.

ABOUT POLYMETAL

Polymetal International (LSE, MOEX: POLY, ADR: AUCOY) (together with its subsidiaries - "Polymetal", the "Company", or the "Group") is the top-20 global gold producer and top-5 global silver producer with assets in Russia, Kazakhstan and Armenia. The Company combines strong growth with a robust dividend yield.

The full version of the announcement with the JORC Table 1 is available in the attachment.

Enquiries

Media

 

Investor Relations

FTI Consulting

Leonid Fink

Viktor Pomichal

+44 20 3727 1000

Polymetal

Evgenia Onuschenko

Maryana Nesis

Michael Vasiliev

ir@polymetalinternational.com

+44 20 7016 9505 (UK)

 

+7 812 334 3666 (Russia)

Joint Corporate Brokers

 

Morgan Stanley

Andrew Foster

Richard Brown

Panmure Gordon

Adam James

James Stearns

+44 20 7425 8000

 

 

 

+44 20 7886 2500

RBC Europe Limited

Tristan Lovegrove

Marcus Jackson

+44 20 7653 4000

 

FORWARD-LOOKING STATEMENTS

THIS RELEASE MAY INCLUDE STATEMENTS THAT ARE, OR MAY BE DEEMED TO BE, "FORWARD-LOOKING STATEMENTS". THESE FORWARD-LOOKING STATEMENTS SPEAK ONLY AS AT THE DATE OF THIS RELEASE. THESE FORWARD-LOOKING STATEMENTS CAN BE IDENTIFIED BY THE USE OF FORWARD-LOOKING TERMINOLOGY, INCLUDING THE WORDS "TARGETS", "BELIEVES", "EXPECTS", "AIMS", "INTENDS", "WILL", "MAY", "ANTICIPATES", "WOULD", "COULD" OR "SHOULD" OR SIMILAR EXPRESSIONS OR, IN EACH CASE THEIR NEGATIVE OR OTHER VARIATIONS OR BY DISCUSSION OF STRATEGIES, PLANS, OBJECTIVES, GOALS, FUTURE EVENTS OR INTENTIONS. THESE FORWARD-LOOKING STATEMENTS ALL INCLUDE MATTERS THAT ARE NOT HISTORICAL FACTS. BY THEIR NATURE, SUCH FORWARD-LOOKING STATEMENTS INVOLVE KNOWN AND UNKNOWN RISKS, UNCERTAINTIES AND OTHER IMPORTANT FACTORS BEYOND THE COMPANY'S CONTROL THAT COULD CAUSE THE ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS OF THE COMPANY TO BE MATERIALLY DIFFERENT FROM FUTURE RESULTS, PERFORMANCE OR ACHIEVEMENTS EXPRESSED OR IMPLIED BY SUCH FORWARD-LOOKING STATEMENTS. SUCH FORWARD-LOOKING STATEMENTS ARE BASED ON NUMEROUS ASSUMPTIONS REGARDING THE COMPANY'S PRESENT AND FUTURE BUSINESS STRATEGIES AND THE ENVIRONMENT IN WHICH THE COMPANY WILL OPERATE IN THE FUTURE. FORWARD-LOOKING STATEMENTS ARE NOT GUARANTEES OF FUTURE PERFORMANCE. THERE ARE MANY FACTORS THAT COULD CAUSE THE COMPANY'S ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS TO DIFFER MATERIALLY FROM THOSE EXPRESSED IN SUCH FORWARD-LOOKING STATEMENTS. THE COMPANY EXPRESSLY DISCLAIMS ANY OBLIGATION OR UNDERTAKING TO DISSEMINATE ANY UPDATES OR REVISIONS TO ANY FORWARD-LOOKING STATEMENTS CONTAINED HEREIN TO REFLECT ANY CHANGE IN THE COMPANY'S EXPECTATIONS WITH REGARD THERETO OR ANY CHANGE IN EVENTS, CONDITIONS OR CIRCUMSTANCES ON WHICH ANY SUCH STATEMENTS ARE BASED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCMMBATMBTBMBP
Date   Source Headline
14th Mar 20224:40 pmRNSSecond Price Monitoring Extn
14th Mar 20224:35 pmRNSPrice Monitoring Extension
14th Mar 20222:30 pmEQSPolymetal: Important notice regarding FTSE exclusion
11th Mar 20224:41 pmRNSSecond Price Monitoring Extn
11th Mar 20224:36 pmRNSPrice Monitoring Extension
10th Mar 20224:41 pmRNSSecond Price Monitoring Extn
10th Mar 20224:36 pmRNSPrice Monitoring Extension
10th Mar 20227:00 amEQSPolymetal: TR-1 Notification (BlackRock)
9th Mar 20224:43 pmRNSSecond Price Monitoring Extn
9th Mar 20224:38 pmRNSPrice Monitoring Extension
9th Mar 20227:00 amEQSPolymetal: Shareholder Structure Update
9th Mar 20227:00 amEQSPolymetal: Business update and impact of sanctions
7th Mar 20226:30 pmEQSPolymetal: Integrated Annual Report 2021
7th Mar 20224:41 pmRNSSecond Price Monitoring Extn
7th Mar 20224:36 pmRNSPrice Monitoring Extension
7th Mar 20227:06 amEQSPolymetal: Board Changes
4th Mar 20224:41 pmRNSSecond Price Monitoring Extn
4th Mar 20224:36 pmRNSPrice Monitoring Extension
3rd Mar 20224:41 pmRNSSecond Price Monitoring Extn
3rd Mar 20224:36 pmRNSPrice Monitoring Extension
2nd Mar 20227:03 amEQSPolymetal: Final dividend declaration of US$ 0.52 per share
2nd Mar 20227:02 amEQSPolymetal: TR-1 Notification (Fodina B.V.)
2nd Mar 20227:00 amEQSPolymetal: Preliminary results for the year ended 31 December 2021
1st Mar 20227:01 amEQSPolymetal: Ore Reserves, Mineral Resources and Exploration update as at 1 January 2022
1st Mar 20227:00 amEQSPolymetal: TR-1 Notification (BlackRock)
24th Feb 202211:31 amEQSPolymetal: Response to the escalation in Ukraine
27th Jan 20227:00 amEQSPolymetal: Q4 2021 production results
24th Jan 20227:00 amEQSPolymetal: Novopetrovsky initial Mineral Resource estimate
20th Jan 20227:00 amEQSPolymetal: Pavlov initial Mineral Resource estimate
31st Dec 20217:00 amEQSPolymetal: Total Voting Rights as at 31 December 2021
14th Dec 202110:30 amEQSPolymetal: Issuance of new shares
7th Dec 20217:05 amEQSPolymetal: Tracey Kerr appointment to the Board of Hochschild Mining PLC
30th Nov 20217:00 amEQSPolymetal: Issuance of new shares
17th Nov 20217:00 amEQSPolymetal: Polymetal has been reaffirmed as a member of the Dow Jones Sustainability Indices
8th Nov 20217:13 amEQSPolymetal: New Company presentation with updated guidance
8th Nov 20217:00 amEQSPolymetal: The Board approves construction of the Veduga gold project
26th Oct 20218:24 amEQSPolymetal: CORRECTION Q3 2021 production results
26th Oct 20217:00 amEQSPolymetal: Q3 2021 production results
18th Oct 20217:00 amEQSPolymetal: Nezhda start-up
11th Oct 20217:00 amEQSPolymetal: Analyst and Investor Day
17th Sep 20213:20 pmEQSPolymetal: Exchange rates for interim dividend payment
26th Aug 202112:00 pmEQSPolymetal: Issuance of new shares
26th Aug 20217:03 amEQSPolymetal: Interim dividend declaration of US$ 0.45 per share
26th Aug 20217:02 amEQSPolymetal: Prognoz fast-track development approval
26th Aug 20217:00 amEQSPolymetal: Half-yearly report for the six months ended 30 June 2021
6th Aug 20217:00 amEQSPolymetal: Polymetal's MSCI ESG Rating has been upgraded to AA from A.
28th Jul 20217:00 amEQSPolymetal: Ollie Oliveira appointment at Vale S.A.
27th Jul 20217:00 amEQSPolymetal: Q2 2021 production results
30th Jun 202111:00 amEQSPolymetal: Report on payments to governments for the year 2020
30th Jun 20217:00 amEQSPolymetal: Total Voting Rights as at 30 June 2021

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.