Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPOLY.L Regulatory News (POLY)

  • There is currently no data for POLY

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Polymetal: The Board approves construction of the Veduga gold project

8 Nov 2021 07:00

Polymetal International plc (POLY) Polymetal: The Board approves construction of the Veduga gold project 08-Nov-2021 / 10:00 MSK Dissemination of a Regulatory Announcement, transmitted by EQS Group. The issuer is solely responsible for the content of this announcement.


Release time

IMMEDIATE LSE, MOEX, AIX: POLY / ADR: AUCOY

Date

08 November 2021

 

 

Polymetal International plc

The Board approves construction of the Veduga gold project

The Board of Polymetal has approved a US$ 447 million investment in the 4.0 Moz asset, based on the results of the Preliminary Feasibility Study ("PFS"). First production is expected in Q2 2025.

"The large high-grade reserve base, robust economics, and clear execution path to significant cash flows underpinned the Board's decision to approve Veduga", said Vitaly Nesis, Group CEO of Polymetal. "The management is currently planning a full consolidation of the asset in H1 2022".

HIGHLIGHTS

The updated Ore Reserve estimate as at 1 February 2021 comprises 31.9 Mt of ore with an average gold grade of 3.9 g/t containing 4.0 Moz of gold. This is a 50% or 1.3 Moz increase compared to the previous estimate. Open-pit reserves increased by 89% to 1.4 Moz and now represent 35% of the total Ore Reserves. Underground reserves extended by 35% to 2.6 Moz. Mineral Resources additional to Ore Reserves stand at 8.7 Mt of ore with an average grade of 4.5 g/t containing 1.3 Moz of gold representing an opportunity for significant conversion into reserves. The mine plan assumes 10 years of conventional open-pit mining until 2031 (including pre-production stripping in 2022-2024), and 12 years of underground mining using a skip shaft for hauling from 2030 to 2041. The PFS is based on a 2.0 Mtpa flotation concentrator with dry-stacking of tailings. Flowsheet development has been supported by extensive external and in-house metallurgical testing. Flotation concentrate will be processed at the future POX-2, while volumes in excess of the facility's capacity will be sold to 3rd parties. Veduga could also potentially become a source of feed for the future Pacific POX project. Average LOM annual production is 200 Koz of gold at TCC in the range of US$ 725-775/oz and AISC in the range of US$ 800-850/oz. First production is planned for Q2 2025 with full ramp-up by the end of Q3 2025. The project will materially contribute to Polymetal's carbon emission reduction targets. The mine will rely on hydro power ensuring relatively low emission intensity level of 405 kg CO2e/oz GE in 2025-2030 on average (well below the Group's target of 560 kg CO2e/oz GE by 2030). Total project CAPEX is estimated at US$ 447 million (including capitalised pre-stripping costs) and includes a post-launch skip shaft and underground infrastructure construction of US$ 77 million in 2027-2029. The extended open pit allows to shift underground development capital costs beyond the start-up CAPEX. The project's IRR is estimated at 19% with NPV of US$ 292 million (using a 10% discount rate, US$ 1,500/oz gold price, RUB/USD exchange rate of 72). Veduga has obtained the status of a Regional Investment Project, so should benefit from reduced income tax for the project in 2025-2028 and reduced Mineral Extraction Tax until 2034. Polymetal currently owns 59.4% stake in Veduga and holds a call option to increase its stake to 100% at a pre-determined price giving VTB a fixed rate of return on initial investment. Following the final statutory clearance which is expected in Q2 2022, Polymetal plans to fully consolidate the asset.

 Ore Reserves reconciliation

Ore Reserves

Category

01.03.2019

01.02.2021

Change, %

Open pit

Tonnage, Mt

6.7

13.3

+99%

Au grade, g/t

3.5

3.3

-5%

Au content, Moz

0.8

1.4

+89%

 

 

 

 

 

Underground

Tonnage, Mt

11.9

18.6

+55%

Au grade, g/t

5.1

4.4

-13%

Au content, Moz

2.0

2.6

+35%

 

 

 

 

 

Total

Tonnage, Mt

18.6

31.9

+71%

Au grade, g/t

4.5

3.9

-12%

Au content, Moz

2.7

4.0

+50%

Notes: Ore Reserves are reported on a 100% ownership basis in accordance with the JORC Code (2012) and are estimated using a gold price of US$ 1,500/oz. Cut-off grades for open-pit and underground are 0.7 g/t and 1.8 g/t of gold respectively. Ore Reserve estimate as at 01.03.2019 accounts for depletion in 2019-2020. Open-pit reserves Includes stockpiles. Discrepancies in calculations are due to rounding.

PROJECT TIMELINE

Polymetal envisages the following conceptual development timeline for the Veduga gold project:

Federal Anti-Monoploy Service approval and increase of Polymetal's share to 100% via call-option execution: Q2 2022 Start of construction: Q3 2022 Commissioning: Q1 2025 First production: Q2 2025 Full ramp-up: Q3 2025.

CAPITAL EXPENDITURE

Project capital costs in 2022-2029 are estimated at US$ 447 million, including US$ 77 million spend on a skip shaft and underground infrastructure construction incurred after the launch of the processing plant in 2027-2029, and US$ 58 million of capitalized stripping costs. CAPEX will be fully funded out of free cash flow.

Area

Capital Cost,

US$ million

Processing plant construction

98

Processing plant equipment

69

Infrastructure

94

Mining equipment

52

Capitalized stripping

58

Pre-launch Capital Costs

371

Skip shaft

55

Underground infrastructure

22

Total Project Capital Costs

447

During 2018[1]-2021, Polymetal has invested approximately US$ 68 million in Veduga, including exploration, evaluation and engineering activities, capitalized stripping as well as a significant infrastructure upgrade.

GEOLOGY

The Veduga deposit is a gold-sulphide mineralised formation and belongs to the pyrite-arsenopyrite-antimonite mineral type.

Mineralisation is represented by two contiguous sub-vertical ore bodies with an average true width of 20 and 35 m. Thickness of the ore bodies varies from 5 to 70 meters. Down dip, the mineralized bodies have been traced for 150-980 m and are currently open at depth.

MINING

Five open pits will be mined over 10 years starting from 2022 using conventional drill and blast, load and haul mining methods with electrical and diesel excavators, and diesel trucks. LOM stripping ratio is 15 t/t (without pre stripping).

The underground mine will utilise open stope mining followed by cemented paste backfill, with ore hauling by skip shaft. Further studies will be undertaken to evaluate alternative ore transportation options that could reduce the capital spending. Polymetal plans to utilize exclusively battery electric vehicles throughout the underground mine. Ore mining will start in 2030 and continue until 2041. This could be potentially extended by another 10 years following additional exploration to improve the confidence of the remaining Mineral Resources.

METALLURGY AND PROCESSING

Veduga ore is single refractory. Gold is closely associated with sulphides in the form of finely dispersed inclusions which determines the need for fine primary grinding of the ore prior to froth flotation.

The concentrator with a capacity of 2.0 Mtpa incorporates crushing, grinding, primary flotation and secondary flotation followed by carbon-in-pulp cyanidation of secondary (free-milling pyrite) concentrate. Primary (refractory) concentrates will be thickened, filtered, dried and bagged for off-site processing at Amursk POX-2 and off-take facilities. Loaded carbon from pyrite concentrate cyanidation will be transported to Amursk POX-2 for carbon stripping and dore production. Tails will be thickened, filtered, and dry stacked in tailings storage facility. Part of tailings will be used for backfill at the underground mine. Gold recovery to concentrate is expected to average 85%, with a mass pull ratio of 8%. Average concentrate gold grade expected at 43 g/t is expected. An additional 96.5% will be recovered to dore.

SUSTAINABLE DEVELOPMENT

Veduga gold project will further reinforce Polymetal's sustainable development strategy. The environmental footprint of the project is minimised on the back of several important design features.

Energy is expected to be mostly sourced from Boguchanskaya Hydroelectric Power Plant ensuring an increase in the Group's share of renewable electricity. The emission intensity level is expected to stand at an average of 405 kg CO2e/oz GE in 2025-2030, which is below the Group's target for carbon footprint reduction (560 kg CO2e/oz GE by 2030).

The processing plant will have a recycled water supply system, with the share of recycled water at 85%. In order to achieve this level and reduce freshwater withdrawal, storm and drainage water will be used, driving the freshwater intensity to 1.22 m3/oz GE, well below the average Group's current level (2.2 m3/oz GE in 2020).

Tailings from the plant will be stored in the form of dry cake, and no impoundments or dam structures will be required. The share of dry stack tailings on the Group level will increase to 18% (2020 - 11%).

Veduga currently employs more than 300 workers, and 627 new jobs will be created by 2027 for specialists in mining and metal processing. Employees will be mainly attracted locally from the Krasnoyarsk region. The Project will boost social development as Polymetal plans to invest approximately US$ 11.5 million in the social projects until 2028, with the focus on high-quality professional education and urban infrastructural improvements in the Krasnoyarsk region (sports, healthcare, etc.).

Veduga project will not disturb the wildlife and land in the area of its operation. The license area does not interfere with any protected natural areas, cultural heritage sites, or deer pastures. Archaeological material and signs of the presence of cultural heritage objects were not found. Rare or endangered species of animals are absent.

ABOUT VEDUGA

Veduga is a high-grade refractory gold deposit located in a prolific Northern Yenisey gold belt in the Krasnoyarsk Region, the top gold producing region of Russia, 520 km north from regional centre of Kranoyarsk (population of approximately 1.1 mln) and 160 km south from municipal centre of Severo-Eniseyskiy (population of approximately 6,700). Veduga comprises 4 license plots with the total area of 18 sq.km. The property is accessible by an all-year road and has direct access to the federal power grid.

Veduga was discovered in 1977 and extensively explored between 1988 and 1996. Polymetal has been a partial owner of the property since 2006 with the original 50% stake acquired through the JV with AngloGold Ashanti. The new exploration campaign was carried out thereafter. In 2012, mining of oxide ore started. In 2014, initial NI-compliant Ore Reserves and Mineral Resources estimate was prepared. In 2016, open-pit mining of sulfide ore commenced. In October 2018, the Company increased its ownership in Veduga to 74.3%. In 2019, JORC-compliant reserves grew from 1.3 Moz to 2.8 Moz of gold. In April 2020, VTB Bank invested US$ 71 million in exchange for a 40.6% stake in Veduga, while Polymetal was granted a call option to acquire the VTB's stake at a fixed implied rate of return, and thus increase its share in the asset to 100%.

 ORE RESERVE AND MINERAL RESOURCE STATEMENT[2]

The Ore Reserve and Mineral Resource estimates are reported on a 100% basis in accordance with the JORC Code (2012) as at 1 February 2021 using a gold price of US$ 1,500/oz and was prepared by CSA Global Pty Ltd. A cut-off grade of 0.7 g/t of gold has been applied for the open pit and 1.8 g/t for the underground.

Veduga Ore Reserve estimate as at 1 February 2021

Ore Reserves

Tonnage

Gold grade,

Gold content,

Mt

g/t

Koz

Proved

 

 

 

Stockpiles

1.1

2.5

87

Open-pit

0.8

3.6

91

Total Proved

1.8

3.0

178

 

 

 

 

Probable

 

 

 

Open-pit

11.5

3.4

1,242

Underground

18.6

4.4

2,628

Total Probable

30.0

4.0

3,870

 

 

 

 

Total Proved + Probable

31.9

3.9

4,048

Notes: Discrepancies in calculations are due to rounding.

Veduga additional Mineral Resource estimate as at 1 February 2021

Mineral Resources

Tonnage,

Gold grade,

Gold content,

Mt

g/t

Koz

Measured

Stockpiles

0.5

0.8

11

Open-pit

0.0

2.1

2

Total Measured

0.5

0.9

13

 

 

 

 

Indicated

Open-pit

0.4

1.6

21

Underground

1.1

3.3

112

Total Indicated

1.5

2.8

133

 

Measured + Indicated

Stockpiles

0.5

0.8

11

Open-pit

0.5

1.6

24

Underground

1.1

3.3

112

Total Measured + Indicated

2.0

2.3

146

 

 

 

 

Inferred

Open-pit

0.1

4.1

15

Underground

6.6

5.2

1,095

Total Inferred

6.7

5.1

1,110

 

Measured + Indicated + Inferred

Stockpiles

0.5

0.8

11

Open-pit

0.6

2.1

39

Underground

7.7

4.9

1,206

Total Measured + Indicated + Inferred

8.7

4.5

1,256

Notes: Discrepancies in calculations are due to rounding.

 

COMPETENT PERSONS

The quality assurance/quality control (QAQC) analysis to support the Mineral Resource estimate was completed by Mr Alexander Sobolev, Principal Geologist of GeoConsult Group. Alexander assumes Competent Person status for the data which supports the reported Mineral Resource. Alexander has the necessary qualifications and relevant experience in the style of mineralisation under consideration at Veduga to qualify as a Competent Person under the JORC Code.

The Mineral Resource modelling methodology review was completed by Mr Dmitry Pertel, Principal Resource Geologist of CSA Global. Dmitry has the necessary qualifications and relevant experience in the style of mineralisation under consideration at Veduga to qualify as a Competent Person under the JORC Code. Mr Dmitry Pertel assumes Competent Person status for the reported Mineral Resource.

The Ore Reserve review was completed by Mr Mark Laing, Principal Mining Engineer of CSA Global. Mr Laing has the necessary qualifications and relevant experience in the style of mineralisation under consideration at Veduga to qualify as a Competent Person under the JORC Code. Mr Mark Laing assumes Competent Person status for the reported Ore Reserves.

About Polymetal 

Polymetal International plc (together with its subsidiaries - "Polymetal", the "Company", or the "Group") is a top-10 global gold and silver producer with assets in Russia and Kazakhstan. The Company combines strong growth with a robust dividend yield.

Enquiries

Media   Investor Relations

FTI Consulting

Leonid Fink

Viktor Pomichal

+44 20 3727 1000

Polymetal

Evgeny Monakhov

Timofey Kulakov

Kirill Kuznetsov

ir@polymetalinternational.com

+44 20 7887 1475 (UK)

 

+7 812 334 3666 (Russia)

Joint Corporate Brokers  

Morgan Stanley & Co. International plc

Andrew Foster

Richard Brown

Panmure Gordon

John Prior

Rupert Dearden

+44 20 7425 8000

 

 

 

 

+44 20 7886 2500

RBC Europe Limited

Marcus Jackson

Jamil Miah

+44 20 7653 4000

Forward-looking statements

This release may include statements that are, or may be deemed to be, "forward-looking statements". These forward-looking statements speak only as at the date of this release. These forward-looking statements can be identified by the use of forward-looking terminology, including the words "targets", "believes", "expects", "aims", "intends", "will", "may", "anticipates", "would", "could" or "should" or similar expressions or, in each case their negative or other variations or by discussion of strategies, plans, objectives, goals, future events or intentions. These forward-looking statements all include matters that are not historical facts. By their nature, such forward-looking statements involve known and unknown risks, uncertainties and other important factors beyond the company's control that could cause the actual results, performance or achievements of the company to be materially different from future results, performance or achievements expressed or implied by such forward-looking statements. Such forward-looking statements are based on numerous assumptions regarding the company's present and future business strategies and the environment in which the company will operate in the future. Forward-looking statements are not guarantees of future performance. There are many factors that could cause the company's actual results, performance or achievements to differ materially from those expressed in such forward-looking statements. The company expressly disclaims any obligation or undertaking to disseminate any updates or revisions to any forward-looking statements contained herein to reflect any change in the company's expectations with regard thereto or any change in events, conditions or circumstances on which any such statements are based.

 

 


[1] Year of consolidation of Veduga in IFRS statements.

[2] Please see the compliance letter on our website for the full MR and OR estimate disclosure (including total Mineral Resources).


ISIN:JE00B6T5S470
Category Code:MSCM
TIDM:POLY
LEI Code:213800JKJ5HJWYS4GR61
OAM Categories: 3.1. Additional regulated information required to be disclosed under the laws of a Member State
Sequence No.:126184
EQS News ID:1246803
 
End of AnnouncementEQS News Service

UK Regulatory announcement transmitted by DGAP - a service of EQS Group AG. The issuer is solely responsible for the content of this announcement.

Date   Source Headline
10th Aug 20237:00 amEQSPolymetal: Resumption of trading on AIX
1st Aug 20236:00 pmEQSPolymetal: Suspension of Trading on the London Stock Exchange
28th Jul 20231:00 pmEQSPolymetal: Results of GM
25th Jul 20232:00 pmEQSPolymetal: Results of AGM
24th Jul 20233:00 pmEQSPolymetal: Q2 2023 production results webcast
21st Jul 20237:00 amEQSPolymetal: Update to the timetable of the Re-domiciliation
10th Jul 20234:55 pmEQSPolymetal: Proposed cancellation of listing on the Official List and from trading on the London Stock Exchange and notice of General Meeting
10th Jul 202311:30 amEQSPolymetal: Acquisition of the controlling stake in the Baksy property in Kazakhstan
10th Jul 20237:00 amEQSPolymetal: Clarification to the expected timetable of the Re-domiciliation
30th Jun 20233:00 pmEQSPolymetal: Report on payments to governments for the year 2022
29th Jun 20237:05 amEQSPolymetal: Update to the timetable of the Re-domiciliation
29th Jun 20237:00 amEQSPolymetal: Notice of 2023 AGM
19th Jun 20233:30 pmEQSPolymetal: Board changes
16th Jun 20237:01 amEQSPolymetal: Further Extension to Exchange Offer Timetable
5th Jun 20237:00 amEQSPolymetal: Update on the Company’s Russian-registered subsidiary, JSC Polymetal
30th May 20231:30 pmEQSPolymetal: Results of GM
26th May 20234:21 pmEQSPolymetal: Resignation of Bank of New York Mellon as depository bank for American Depositary Receipt programme
22nd May 20237:00 amEQSPolymetal: Update on the Russian-registered JSC Polymetal
18th May 20235:00 pmEQSPolymetal: General Meeting Voting Arrangements
16th May 20237:01 amEQSPolymetal: Circulation of General Meeting Materials
10th May 20237:01 amEQSPolymetal: Q1 2023 production results
10th May 20237:00 amEQSPolymetal: Proposed re-domiciliation to the AIFC (Кazakhstan) and notice of General Meeting
3rd May 20237:00 amEQSPolymetal: Analyst and Investor Briefing
23rd Mar 20237:00 amEQSPolymetal International plc: Integrated Annual Report 2022
16th Mar 20237:01 amEQSPolymetal: Preliminary results for the year ended 31 December 2022
16th Mar 20237:00 amEQSPolymetal: Board Committee Changes
1st Mar 20237:01 amEQSPolymetal: Ore Reserves, Mineral Resources and Exploration update as at 1 January 2023
10th Feb 20238:00 amEQSPolymetal: Statement in relation to trading of shares on the London Stock Exchange
10th Feb 20237:00 amEQSPolymetal: Statement in relation to trading of shares on the London Stock Exchange
27th Jan 20234:40 pmRNSSecond Price Monitoring Extn
27th Jan 20234:35 pmRNSPrice Monitoring Extension
25th Jan 20238:00 amEQSPolymetal: Q4 and FY 2022 production results
25th Jan 20237:00 amEQSPolymetal: Q4 and FY 2022 production results
17th Jan 20238:00 amEQSPolymetal: Analyst and Investor Day
17th Jan 20237:00 amEQSPolymetal: Analyst and Investor Day
11th Jan 20234:35 pmRNSPrice Monitoring Extension
30th Dec 20228:00 amEQSPolymetal: Total Voting Rights as at 30 December 2022
30th Dec 20227:00 amEQSPolymetal: Total Voting Rights as at 30 December 2022
12th Dec 20228:00 amEQSPolymetal: Results of the first tranche of the Exchange Offer
12th Dec 20227:00 amEQSPolymetal: Results of the first tranche of the Exchange Offer
8th Dec 20228:00 amEQSPolymetal: Extension to the settlement period in connection with the Exchange Offer
8th Dec 20227:00 amEQSPolymetal: Extension to the settlement period in connection with the Exchange Offer
1st Dec 20228:00 amEQSPolymetal: Board Changes
1st Dec 20227:00 amEQSPolymetal: Board Changes
10th Nov 20228:00 amEQSPolymetal: Board Committee Changes
10th Nov 20227:00 amEQSPolymetal: Board Committee Changes
2nd Nov 20228:00 amEQSPolymetal: Q3 2022 production results
2nd Nov 20227:00 amEQSPolymetal: Q3 2022 production results
12th Oct 20225:30 pmEQSPolymetal: Submission of resolutions to NSM
12th Oct 20225:30 pmEQSPolymetal: Submission of resolutions to NSM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.