Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPOLY.L Regulatory News (POLY)

  • There is currently no data for POLY

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Ore reserves increase at Komar gold deposit

11 Oct 2017 07:00

RNS Number : 2847T
Polymetal International PLC
11 October 2017
 

Release time

IMMEDIATE

Date

11 October 2017

 

 

Polymetal International plc

Ore reserve increase at Komar

Polymetal International plc (LSE, MOEX: POLY; ADR: AUCOY) (together with its subsidiaries - "Polymetal", the "Company", or the "Group") is pleased to report a significant increase in Ore Reserves at the Komar gold deposit in Kazakhstan.

The updated reserve estimate was prepared under 2012 JORC standards and incorporates data from 387 diamond drill holes completed after Polymetal had agreed to acquire the asset in Q2 2016. In total, the exploration campaign comprised of 68,016 m of diamond drilling.

As a result, reserves have grown by 535 Koz of gold while the grade remained stable at 1.8 g/t. Most of the additional ounces represent an upgrade and conversion of inferred resources in the southern part of the property, as well as new mineralised material discovered along strike in the extreme northern part of the 5km-long deposit. The re-designed open pit has a stripping ratio of 13 mt/mt, roughly at the same level as the previously designed open pit. The maximum mining depth remained unchanged at 190 m below the surface level. Mineralisation is open along strike in the northerly direction and down-dip in the southern part of the deposit.

Polymetal now plans to mine, transport by rail and process approximately 2 Mt of Komar ore per year at the Varvara processing plant. This compares with the 1 Mt per annum ore production rate envisaged at the time of the acquisition. During the first 9 months of 2017, 1.4 Mt of Komar ore was processed at Varvara. The additional Komar ore will displace the lower-grade material from the Varvara deposit and consequently, increase production and result in lower costs at the Varvara processing hub. Mine-to-mill transportation costs for Komar ore are low and comprise approximately US$4.5 per tonne. This makes processing Komar ore at the existing plant at Varvara a superior option compared to the construction of a new on-site processing facility in terms of return on invested capital (ROIC).

Total upgraded Ore Reserves are estimated as at 1 June 2017 at 24 Mt of ore with a grade of 1.8 g/t for 1.4 Moz of gold contained. This represents a significant increase over the previous estimate with a 60% increase in tonnage and a 57% increase in gold content, further extending the Varvara hub mine life by 3 years, until 2032.

Komar Ore Reserves

Ore Reserves

Category

01.01.2017

01.06.2017

Change, %

Proved

Tonnage, Kt

2,030

4,660

+130%

Au grade, g/t

1.1

1.6

+45%

Au content, Koz

74

236

+218%

 

 

 

 

 

Probable

Tonnage, Kt

12,970

19,390

+49%

Au grade, g/t

1.9

1.8

-5%

Au content, Koz

799

1,138

+42%

 

 

 

 

 

Proved + Probable

Tonnage, Kt

15,000

24,050

+60%

Au grade, g/t

1.8

1.8

0%

Au content, Koz

873

1,374

+57%

Notes: Ore Reserve estimate using Au= US$1,200/oz price. Ore Reserves are reported in accordance with the JORC Code (2012). Discrepancies in calculations are due to rounding.

Ore Reserve reconciliation, Koz of gold

 

Ore Reserves, 01.01.2017

Depletion

Revaluation

Ore Reserves, 01.06.2017

873

-35

535

1,374

"We are very happy about the positive exploration results at Komar. The reserve expansion, increased processing capacity and associated economies of scale have far outstripped our expectations at the time of the acquisition. Polymetal plans to continue exploration at Komar with the goal to further extend the life-of-mine of the Varvara hub", said Vitaly Nesis, Group CEO of Polymetal.

Enquiries

Media Investor Relations

FTI Consulting

Leonid Fink

Viktor Pomichal

+44 20 3727 1000

Polymetal

Evgenia Onuschenko

Maryana Nesis

Michael Vasiliev

ir@polymetalinternational.com

+44 20 7016 9505 (UK)

 

+7 812 334 3666 (Russia)

Joint Corporate Brokers 

Morgan Stanley

Sam McLennan

Richard Brown

Panmure Gordon

Adam James

Tom Salvesen

+44 20 7425 8000

 

 

 

+44 20 7886 2500

RBC Europe Limited

Tristan Lovegrove

Marcus Jackson

+44 20 7653 4000

 

FORWARD-LOOKING STATEMENTS

THIS RELEASE MAY INCLUDE STATEMENTS THAT ARE, OR MAY BE DEEMED TO BE, "FORWARD-LOOKING STATEMENTS". THESE FORWARD-LOOKING STATEMENTS SPEAK ONLY AS AT THE DATE OF THIS RELEASE. THESE FORWARD-LOOKING STATEMENTS CAN BE IDENTIFIED BY THE USE OF FORWARD-LOOKING TERMINOLOGY, INCLUDING THE WORDS "TARGETS", "BELIEVES", "EXPECTS", "AIMS", "INTENDS", "WILL", "MAY", "ANTICIPATES", "WOULD", "COULD" OR "SHOULD" OR SIMILAR EXPRESSIONS OR, IN EACH CASE THEIR NEGATIVE OR OTHER VARIATIONS OR BY DISCUSSION OF STRATEGIES, PLANS, OBJECTIVES, GOALS, FUTURE EVENTS OR INTENTIONS. THESE FORWARD-LOOKING STATEMENTS ALL INCLUDE MATTERS THAT ARE NOT HISTORICAL FACTS. BY THEIR NATURE, SUCH FORWARD-LOOKING STATEMENTS INVOLVE KNOWN AND UNKNOWN RISKS, UNCERTAINTIES AND OTHER IMPORTANT FACTORS BEYOND THE COMPANY'S CONTROL THAT COULD CAUSE THE ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS OF THE COMPANY TO BE MATERIALLY DIFFERENT FROM FUTURE RESULTS, PERFORMANCE OR ACHIEVEMENTS EXPRESSED OR IMPLIED BY SUCH FORWARD-LOOKING STATEMENTS. SUCH FORWARD-LOOKING STATEMENTS ARE BASED ON NUMEROUS ASSUMPTIONS REGARDING THE COMPANY'S PRESENT AND FUTURE BUSINESS STRATEGIES AND THE ENVIRONMENT IN WHICH THE COMPANY WILL OPERATE IN THE FUTURE. FORWARD-LOOKING STATEMENTS ARE NOT GUARANTEES OF FUTURE PERFORMANCE. THERE ARE MANY FACTORS THAT COULD CAUSE THE COMPANY'S ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS TO DIFFER MATERIALLY FROM THOSE EXPRESSED IN SUCH FORWARD-LOOKING STATEMENTS. THE COMPANY EXPRESSLY DISCLAIMS ANY OBLIGATION OR UNDERTAKING TO DISSEMINATE ANY UPDATES OR REVISIONS TO ANY FORWARD-LOOKING STATEMENTS CONTAINED HEREIN TO REFLECT ANY CHANGE IN THE COMPANY'S EXPECTATIONS WITH REGARD THERETO OR ANY CHANGE IN EVENTS, CONDITIONS OR CIRCUMSTANCES ON WHICH ANY SUCH STATEMENTS ARE BASED

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDMBBATMBIBMFR
Date   Source Headline
19th Apr 20177:00 amRNSQ1 2017 Production Results
31st Mar 20177:00 amRNSTotal Voting Rights
29th Mar 20177:00 amRNSAnnual and Sustainability Reports, Notice of AGM
21st Mar 20177:35 amRNSTransaction on Nezhda announced by Polyus
16th Mar 20172:17 pmRNSDirector/PDMR Shareholding
15th Mar 20177:13 amRNSAppointment of Corporate Broking Advisor
15th Mar 20177:08 amRNSFinal dividend and approval of revised policy
15th Mar 20177:01 amRNSPreliminary results for the FY2016
14th Mar 20177:02 amRNSReserve and Resource update as at 1 January 2017
1st Mar 20177:09 amRNSPayment of deferred consideration for Primorskoye
31st Jan 20177:10 amRNSTotal Voting Rights
31st Jan 20177:00 amRNSPolymetal increases interest in Tarutin to 100%
26th Jan 20177:00 amRNSQ4 and full year 2016 production results
23rd Jan 20177:00 amRNSChanges in the executive management team
19th Jan 20177:00 amRNSPolymetal acquires interest in Prognoz property
30th Dec 20167:00 amRNSTotal Voting Rights
23rd Dec 20169:44 amRNSTR-1: Notification of major interest in shares
20th Dec 20162:23 pmRNSExchange rate for dividend payment
19th Dec 20167:00 amRNSEuromoney Global Gold Index inclusion
13th Dec 20167:30 amRNSTR-1: Notification of major interest in shares
8th Dec 20167:00 amRNSSpecial dividend of US$0.15 per share
5th Dec 20163:05 pmRNSPolymetal acquires controlling interest in Saum
2nd Dec 20168:38 amRNSDirector/PDMR Shareholding
28th Oct 20169:41 amRNSTR-1: Notification of major interest in shares
24th Oct 20167:00 amRNSSTOXX Global ESG Leaders Index inclusion
18th Oct 20167:00 amRNSQ3 2016 production results
14th Oct 20161:36 pmRNSDirector/PDMR Shareholding
29th Sep 20164:04 pmRNSTR-1: Notification of major interest in shares
28th Sep 20162:26 pmRNSTR-1: Notification of major interest in shares
28th Sep 20162:26 pmRNSTR-1: Notification of major interest in shares
23rd Sep 20168:57 amRNSHolding(s) in Company
19th Sep 20167:00 amRNSMineral resource estimate for the Viksha project
8th Sep 20169:57 amRNSExchange rate for dividend payment
31st Aug 20168:57 amRNSTotal Voting Rights
30th Aug 20165:02 pmRNSIssuance of new shares
30th Aug 20167:01 amRNSFirst production at Svetloye ahead of schedule
25th Aug 20164:06 pmRNSTR-1: Notification of major interest in shares
24th Aug 20167:04 amRNSDividend declaration of US$0.09 per share
24th Aug 20167:00 amRNSReport for the six months ended 30 June 2016
23rd Aug 20168:00 amRNSTR-1: Notification of major interest in shares
22nd Aug 20167:00 amRNSBoard approves expansion at the Amursk POX plant
18th Aug 20167:00 amRNSPolymetal increases its interest in Tarutin to 75%
2nd Aug 20167:00 amRNSCompletion of the acquisition of the Komarovskoye
19th Jul 20167:20 amRNSQ2 2016 production results
28th Jun 20167:00 amRNSReport on payments to governments FY2015
20th Jun 20161:53 pmRNSDirector/PDMR Shareholding
10th Jun 20167:00 amRNSCommitment to the Cyanide Management Code
19th May 201612:33 pmRNSHolding(s) in Company
18th May 20167:00 amRNSNew investor presentation and production guidance
17th May 20161:23 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.