Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPOL.L Regulatory News (POL)

  • There is currently no data for POL

JORC Compliant Maiden Resource Statement

7 Oct 2009 11:09

RNS Number : 3820A
Polo Resources Limited
07 October 2009
 



7 October 2009

Polo Resources Limited ("Polo" or "the Company")

Erds Coal Project - JORC Compliant Maiden Resource Statement

Total Indicated and Inferred resource estimate of 807 million tonnes thermal coal

Polo Resources (PRL), the AIM listed mining company with uranium and coal interests in Africa, Australia, Europe and Asia, is pleased to announce a maiden JORC compliant resource estimate for the Erds coal project in Mongolia, operated by its recently established 50:50 joint venture with Peabody Energy Corporation (NYSE:BTU) ("Peabody"). The joint venture was formed to hold all of Polo's coal and mineral interests in Mongolia. The joint venture has 54 licenses throughout the South Gobi and elsewhere in Mongolia which are currently being explored for coal.

The Erds Coal Project adjoins a tenement to the west owned by Gulfside Minerals Ltd who recently announced NI 43-101 compliant resources of 1,185 million tonnes of thermal coal at the Onjuul coal deposit. Polo, through its joint venture company with Peabody Energy, also has tenements (Altanshiree) immediately south of the Gulfside resource and adjoins the Erds resource to the east. The geology of the coal basin, combined with the large thicknesses of coal reported at Onjuul and Erds, strongly indicates that additional coal resources will be discovered at Altanshiree. Drilling is due to commence there this coming month.

The Erds coal project is located in the sub province of Altanshiree of the Dornogovi province. The project is approximately 430km south-east of Ulaanbaatar. It is close to rail and power infrastructure and is around 140km from the border of China. The deposit style for the project is a rift basin, which coincides with the Jurassic-Cretaceous intracontinental rift evolution. Deposits in the project area are hosted in the Huhteeg Formation, which contains thick coal seams. The area has undergone a series of exploration campaigns and the results indicate potential for large scale, multi bench, and open-cut operations.

Micromine designed a resource development programme in order to collect sufficient data of a high enough standard to allow a JORC compliant resource estimate, which was subsequently conducted in May 2009. The programme delivered an estimate for the total Indicated and Inferred resource of 807 million tonnes of thermal coal.

The resource estimation process included performing quality checks on the geological and assay information and modelling coal seam morphology, moisture, ash, volatiles, fixed carbon, sulphur, relative density and specific energy on an air-dried basis. Resource estimation was based on modelling of morphology of the seams by gridding, followed by interpolation of coal quality data and categorisation of resources based upon points of observation. 

Boreholes drilled in the 2009 exploration campaign were cored from near surface and all boreholes were geophysically logged to check coal depths and thickness in situ. Coal seam continuity was interpreted from cross sections and nine major seam groups identified with further subdivision into 60 plies. The resource estimate excludes weathered coal (typically 12 to 28 metres below surface) and resources outside the tenement boundary. 

Total indicated and inferred rounded resources are estimated as follows: 

Table 1Classified total Resource, air-dried basis.

Class

Volume 

m3

Tonnes 

t

RD t/m3

ASH 

%

CV kcal/kg

IM 

%

VM 

%

FC 

%

%

Indicated

162,955,539

254,000,000

1.56

26.13

3,658.65

19.26

29.71

24.9

1.33

Inferred

356,869,903

553,000,000

1.55

24.95

3,734.28

19.24

29.7

26.11

1.27

Total

519,825,442

807,000,000

1.55

25.32

3710.46

19.25

29.70

25.73

1.29

Analytical work shows that the low rank Erds coal can be classified as "Lignite A" according to the ASTM classification system, or a "Brown Coal" in the Australian classification system. The test work to date suggests the coal would be suitable for mine mouth feedstock for local coal fired power generation. 

From a 10kg composite sample for detail testing, indications are that the coal is suitable for power generation with a favourable Hardgrove Index, but high sulphur (1.86%) and moderate ash fusion temperatures (1,150 to 1,300 degrees C).

The geotechnical parameters of the deposit need further assessment. Preliminary observations show sediments overlying the coal have weak rock strength, which may place constraints on potential future pit designs. However, defect spacing and bedding plane shears do not appear to be an issue based on the core logging observations. Overall the Erds coal deposit has very good potential for development into a large scale mine with a low strip ratio, producing a low rank thermal coal product.

Neil Herbert, Managing Director of Polo Resources, said:

"The Erds coal deposit has very good potential for development into a large scale mine with a low strip ratio, producing a low rank thermal coal product for power stations. The project is close to the existing rail network and approximately 140km from the Chinese border. With additional licenses in the area the JV has further potential to expand the resource."

The full report can be viewed on Polo Resources' website at www.poloresources.com.

The JV also completed a preliminary exploration programme on a number of its South Gobi licenses during the season now ending but there were no new significant findings to report.

- Ends -

The information contained in this announcement has been reviewed by Mr. Paul Ingram, CEO, Australia & Director of Polo, P.Geo, AIMM, MICA, BSc Geo. Mr. Ingram has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Qualified Person for the purposes of this announcement.

Contacts:

Polo Resources Limited

Neil Herbert, Managing Director

+ 27 82 404 36 37 

Canaccord Adams Limited

Mike Jones / Ryan Gaffney

+ 44 (0) 20 7050 6500

Financial Dynamics

Ben Brewerton / Ed Westropp

+ 44 (0) 20 7831 3113

Glossary

Air-dried basis

An analysis expressed on the basis of a coal sample that has been dried in the laboratory until the moisture content is in approximate equilibrium with the surrounding atmosphere.

ASTM

American Society for Testing and Materials 

JORC

The Australasian Joint Ore Reserves Committee, responsible for the creation of the Australasian Code for Reporting of Mineral Resources and Ore Reserves (the JORC Code).

Inferred Resource

that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a low level of confidence. It is inferred from geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered.

Indicated Resource

that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a reasonable level of confidence. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed

Jurassic-Cretaceous

Jurassic and Cretaceous are the two consecutive geologic time periods that extend from 200 Ma (million years ago) to 65 Ma

Ash

Inorganic residue left after the coal is burnt

CV

Calorific Value is the quantity of heat produced when a unit weight of coal burns. Calorific value is measured in British thermal units per pound or kilocalories per kilogram.

IM

Inherent Moisture is the moisture that is left in the coal after drying in the laboratory at ambient temperature and pressure.

VM

Volatile Matter is the percentage of coal which is lost as gases (mostly hydrocarbons and not including water) when coal is incinerated under standard conditions.

FC

Fixed Carbon is the carbon left in the coal after volatile compounds are driven off.

S

Sulphur is one of the inorganic elements found in coal.

RD

Relative Density is the density of a rock in relation to water, which has a density of 1.00 grams per cubic centimetre or 1.00 metric tonnes per cubic metre.

About the Company

Polo is an emerging energy company focused on acquiring and developing advanced stage uranium and coal properties. For complete details on Polo Resources Limited, management encourages investors and interested parties to view its public documents filed on AIM Exchange at www.poloresources.com.

About Peabody

Peabody is the world's largest private-sector coal company. Its coal products fuel approximately 10 percent of all U.S. electricity generation and 2 percent of worldwide electricity. www.peabodyenergy.com 

CAUTIONARY STATEMENT

The AIM Market of London Stock Exchange plc does not accept responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. All statements, other than statements of historical fact, in this news release are forward-looking statements that involve various risks and uncertainties, including, without limitation, statements regarding potential values, the future plans and objectives of Polo Resources Limited. There can be no assurance that such statements will prove to be accurate, achievable or recognizable in the near term. Actual results and future events could differ materially from those anticipated in such statements. These and all subsequent written and oral forward-looking statements are based on the estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. Polo Resources Limited assumes no obligation to update forward-looking statements should circumstances or management's estimates or opinions change.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUUGMUUUPBGUM
Date   Source Headline
6th Sep 20121:40 pmRNSHolding(s) in Company
6th Aug 20127:00 amRNSFiling of NI 43-101 Technical Report
12th Jul 20127:00 amRNSDirector/PDMR Shareholding
5th Jul 20127:00 amRNSNet Asset Value(s)
25th Jun 20127:00 amRNSDirector/PDMR Shareholding
19th Jun 20127:00 amRNSGold Update and Pre-Feasibility Study
14th Jun 201211:52 amRNSHolding(s) in Company
18th May 20127:00 amRNSHolding(s) in Company
16th May 20127:00 amRNSIncreases Interest in Signet Petroleum
1st May 20125:04 pmRNSChange of name of Nomad
2nd Apr 20127:00 amRNSDirector/PDMR Shareholding
30th Mar 201212:42 pmRNSIssue of Share Options
27th Mar 20127:00 amRNSPolo Resources Appoints Operator for Nimini
26th Mar 20127:00 amRNSHalf Yearly Report
7th Mar 20127:00 amRNSHolding(s) in Company
2nd Feb 20127:00 amRNSNimini Drill Results
1st Feb 20127:00 amRNSPolo Increases Interest in Signet Petroleum LTD
28th Dec 201112:27 pmRNSResult of General Meeting
14th Dec 20117:00 amRNSAcquisition of remaining shares in Nimini
9th Dec 20117:00 amRNSNotice of General Meeting
16th Nov 20114:40 pmRNSSecond Price Monitoring Extn
16th Nov 20114:35 pmRNSPrice Monitoring Extension
9th Nov 20117:00 amRNSIncreases Interest in Signet Petroleum
21st Oct 20113:12 pmRNSResult of AGM
20th Oct 20117:00 amRNSPolo Resources Nimini Update
6th Oct 201110:18 amRNSResult of EGM
5th Oct 201110:12 amRNSPayment of Dividend
29th Sep 20117:00 amRNSCompletion of Investment in AXMIN INC
28th Sep 20117:00 amRNSNotice of AGM
21st Sep 20117:00 amRNSShare Buyback
15th Sep 201110:51 amRNSPolo Resources Investment in Signet
12th Sep 20117:00 amRNSDividend Declaration
5th Sep 20117:00 amRNSFinal Results
2nd Sep 201111:28 amRNSPolo evaluates strategic options re GCM Resources
30th Aug 20113:38 pmRNSDirector/PDMR Shareholding
16th Aug 20117:00 amRNSSpecial dividend increase to 2p per share
2nd Aug 20117:00 amRNSChange of Adviser
1st Aug 20117:00 amRNSPolo Purchases 51% interest in Axmin Inc.'s Assets
4th Jul 20119:53 amRNSChange of Adviser
24th Jun 20114:29 pmRNSReplacement of Form 8.3 - Caledon Resources
24th Jun 20113:24 pmRNSForm 8.3 - Caledon Resources
24th Jun 201111:13 amRNSHolding(s) in Company
23rd Jun 20119:31 amRNSPolo to receive £100m on Caledon disposal
26th May 201112:14 pmRNSDirectorate Change
24th May 20117:00 amRNSInvestment in Joint Venture in Colombia
13th May 20116:22 pmRNSCancellation of Shares
5th May 20117:00 amRNSDirector/PDMR Shareholding
28th Apr 20116:29 pmRNSDirector/PDMR Shareholding
27th Apr 20117:00 amRNSDirector/PDMR Shareholding
26th Apr 201110:58 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.