Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Algerian Operational Update

2 Aug 2011 07:00

RNS Number : 5323L
Petroceltic International PLC
02 August 2011
 



 

 

Petroceltic International plc

Algeria Operational Update

 

Petroceltic International plc ("Petroceltic" or "the Company"), the upstream oil and gas exploration and production company focused on North Africa, the Middle East and the Mediterranean, in association with its partner Sonatrach, the Algerian National Oil & Gas Company is pleased to issue an update on operations at the Ain Tsila field on its Isarene permit (Blocks 228 & 229a) in south eastern Algeria.

 

·; AT-5 tests gas at a maximum flow rate of 3.50mmscfd

·; AT-7 and AT-8 wells spudded

·; AT-9 well approved for drilling

·; Delineation programme on schedule for year end completion

 

 

AT-5 Well Test

 

The AT-5 well was drilled with a 376m of horizontal section through a "pop-up" feature in the Ordovician reservoir at a location about 4km to the east of the AT-1 discovery well. A multistage open hole packer completion with four zone isolation ports was successfully run before the well was suspended for rigless testing. All four zones were then fracture stimulated ("fracced") and a maximum flow rate of 3.50mmscf/d on a 64/64" choke with 60 bbl/d of condensate and 190 bbl/d of water was achieved. While the flow rate is lower than pre-test expectations, this is the third of four wells tested in the Ain Tsila discovery to flow at rates that are likely to be deemed commercial.

 

Upon completion of the operations at the AT-5 site, the rigless testing unit will be mobilised to the AT-6 location to commence testing operations there. The testing programme at AT-6 is expected to be completed in the first half of September.

 

Appraisal Drilling Update

 

Well AT-7, which is being drilled by the Dalma rig and is located in the south west of the field outside the 3D seismic survey approximately 10km south of the AT-3 well, commenced drilling on 26th July. It is designed as a vertical well to test the south westerly extension of the field and will be the 4th well in the current campaign.

 

Well AT-8 which is being drilled by the KCA Deutag rig started drilling on 19th July. This well is being drilled as a vertical well into a "pop-up" feature in the north of the field. The objective of the well is to further delineate the northern part of the field and test a potential fracture zone associated with a seismically mapped fault which may facilitate enhanced productivity rates. It will be the 5th well in the current campaign.

 

The Algerian Authorities have also recently approved the drilling of the 6th well, AT-9. This well will be the second well with the KCA Deutag rig following completion of drilling operations at AT-8. It is located in the centre of the field between wells AT-1 and AT-2 and will be drilled as a horizontal well designed to test a structurally different style of "pop-up" with seismically interpreted fractures and faults.

 

With the addition of the second rig, the current six well delineation programme will be completed by year end to allow for the preparation of the Final Discovery Report for submittal to the Algerian authorities by the end of Q1 2012.

 

Petroceltic operates the permit with a 56.625 % interest, Sonatrach holds a 25% interest, and Enel holds 18.375% interest, pending final Government of Algeria ratification.

 

Brian O'Cathain, Chief Executive of Petroceltic commented:

"While we are disappointed that the AT-5 flow rates did not meet our pre-test expectations, the well has achieved a commercial flow and provided important operational data in respect of the future design, drilling and testing of appraisal and development wells in the AinTsila Field. This is the third of the four wells tested to date to flow commercial rates of gas and further demonstrates the extent and scale of the discovery.

 

Operational activity is now at a peak with two rigs and a rigless testing unit currently active in the field and we await with interest the results of the remaining wells in this current campaign."

 

 

 

Ends

For further information, please contact:

 

Brian O' Cathain/Tom Hickey Petroceltic International Tel: +353 (1) 421 8300

Philip Dennis / Jenny Renton, Pelham Bell Pottinger Tel: +44 (20) 7861 3919

Joe Murray / Joe Heron, Murray Consultants Tel: +353 (1) 4980300

Hugh McCutcheon / John Frain, Davy Tel: +353 (1) 679 6363

 

Fabrice Toussaint, Head of Petroleum Engineering, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Mr. Toussaint holds a Diploma in Engineering from the Ecole Nationale Supérieure de l'Aéronautique et de l'Espace, Toulouse, and has over 17 years experience in oil & gas exploration and production. He is a member of the Society of Petroleum Engineers.

Notes to Editors:

 

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on the Mediterranean and North African area, and listed on the London Stock Exchange's AIM Market and the Irish Stock Exchange's ESM Market. The Company has exploration and appraisal assets in Algeria, the Kurdistan Region of Iraq and Italy.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FURLFFSLTIILIIL
Date   Source Headline
13th Nov 20154:35 pmRNSPrice Monitoring Extension
3rd Nov 20154:40 pmRNSSecond Price Monitoring Extn
3rd Nov 20154:35 pmRNSPrice Monitoring Extension
30th Sep 20157:00 amRNSInterim Report and Operational Update
28th Sep 201512:45 pmRNSGrant of EGM Injunction
22nd Sep 201512:39 pmRNSHolding(s) in Company
18th Sep 20157:00 amRNSResponse to Worldview Letter
16th Sep 20156:01 pmRNSIssue of Legal Proceedings Against Worldview
11th Sep 201512:00 pmRNSFurther Response to Worldview Announcement
7th Sep 20155:30 pmRNSResults of EGMs
7th Sep 20151:30 pmRNSResponse to Worldview Announcement
25th Aug 20157:00 amRNSAppointment of Non Executive Director
20th Aug 20155:29 pmRNSAnonymous Blogsite - Court Update
20th Aug 20154:40 pmRNSSecond Price Monitoring Extn
20th Aug 20154:35 pmRNSPrice Monitoring Extension
20th Aug 20151:23 pmRNSAnonymous Blogsite
19th Aug 20157:00 amRNSAin Tsila Update
13th Aug 20154:40 pmRNSSecond Price Monitoring Extn
13th Aug 20154:35 pmRNSPrice Monitoring Extension
13th Aug 20154:15 pmRNSNotice of EGM and Publication of Circular
4th Aug 20154:15 pmRNSNotice of EGM and Publication of Circular
3rd Aug 20157:00 amRNSUpdate on Contemplated Bond Issue
24th Jul 20155:30 pmRNSResult of AGM
24th Jul 20154:40 pmRNSSecond Price Monitoring Extn
24th Jul 20154:35 pmRNSPrice Monitoring Extension
24th Jul 20151:00 pmRNSRequest for EGM & Legal Proceedings from Worldview
24th Jul 201510:00 amRNSOperational Update
20th Jul 201512:09 pmRNSResponse to Worldview EGM proposals
16th Jul 20157:00 amRNSRequest for EGM from Worldview
8th Jul 20155:29 pmRNSHolding(s) in Company
3rd Jul 20157:00 amRNSResponse to Worldview Announcement
29th Jun 20151:15 pmRNSAnnual Report and Notice of AGM
29th Jun 20151:15 pmRNSNotice of Annual General Meeting
29th Jun 20157:01 amRNSPreliminary Results
29th Jun 20157:00 amRNSContemplated Bond Issue
26th Jun 20151:37 pmRNSHolding(s) in Company
16th Jun 20157:00 amRNSRomania Licence Update
27th Apr 20157:00 amRNSAward of Rig Contract
25th Mar 20157:00 amRNSKurdistan Operations Update
23rd Mar 20157:00 amRNSBoard & Senior Management Changes
2nd Mar 20157:00 amRNSDirectorate Change
26th Feb 20154:15 pmRNSDirectorate Change
25th Feb 20153:15 pmRNSResult of EGM
19th Feb 201511:30 amRNSResponse to Worldview Announcement
18th Feb 201510:00 amRNSShareholder Letter
17th Feb 20157:00 amRNSGovernance Groups Support Petroceltic Board
13th Feb 20155:30 pmRNSHolding(s) in Company
11th Feb 20157:00 amRNSResponse to Worldview Circular
28th Jan 20157:00 amRNSEGM Requisition and Publication of Circular
28th Jan 20157:00 amRNSCapital Markets Day

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.