Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
14.34    1.05 (7.90%)
Bid:
14.24
Ask:
14.40
Spread: 0.16 (1.124%)
Market Cap: £209.06m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Wilson Test Result

4 Jun 2007 08:12

Pantheon Resources PLC04 June 2007 June 4, 2007 PANTHEON RESOURCES PLC Highly Successful Initial Test Results on Wilson Prospect, Padre Island • The Board of Pantheon Resources ("Pantheon") is pleased to announce successful test results from the first zone in the Wilson well. • This test resulted in a peak flow of 3.3 million cubic feet ("mmcfd") of natural gas through a 10/64 inch choke. The well was shut in and the choke size reduced to 8/64 inches. It was then flowed for 27 hours and achieved a final rate of 1.8 mmcfd of natural gas, 3 barrels of oil per day and 56 barrels of water per day. Flow casing pressure was 6,007 psi. • Although it remains at an early stage, the Operator has indicated that once tied into the sales grid, this zone alone is capable of producing around 2.5 mmcfd. The small choke size combined with the high pressure regime provides confidence that with time this rate might be improved as more reservoir data is collected. • This is the first of four planned flow tests for the well. A further three selected zones will be tested over the coming weeks. These zones lie within a potential natural gas column of over 100 feet thick gross. Any success with these zones will increase further the productive capability of the well. • The Operator has stated that if similar results are obtained from one or more of the three, as yet untested, zones, it is possible that its pre-drill reserve estimate of 21 billion cubic feet ("bcf") for Wilson will be exceeded. This compares with pre-drill gross best estimate potential reserves (previously described as "P50 potential reserves") of 9 bcf as assessed by Pantheon's independent technical adviser. • Pantheon's April production on a gross basis was 79.6 thousand cubic feet a day. This all arose from three fields in its Project Wharton area. Based on the Operator's view of the potential from the first zone at Wilson alone, this would increase Pantheon's net output over ten-fold • The Kindee ST 949 #1 well on the Wilson Structure was spudded on 7 February 2007 (Texas, USA). • Pantheon's working interest in Wilson is 31.77%, subject to final documentation. Pantheon's Chairman, Sue Graham said "This successful initial test at Wilsonrepresents a major and material event for a small company like Pantheon andbuilds on the exploratory success achieved at its Wharton Project. Pantheon hasnow participated in eight exploration wells and achieved a commercial successrate of over 62%. This represents a very pleasing result. With only the initial result from Wilson, Pantheon may expect a significantincrease in cash flow over the coming months as it continues to grow organicallyits portfolio of oil and natural gas properties in the on and near-shore Gulf ofMexico region. Pantheon's conservative pre-drill expectation for recoverablenatural gas reserves at Wilson was 9 bcf. This was substantially lower than theOperator's estimate of 21 bcf. However, as reported by the Operator, it appearsthis well might deliver substantially higher reserves than even its estimate.This now represents the potential for material upside for Pantheon. The drilling at Padre Island has been challenging, especially after the drillingof Plum. With several more zones to test at Wilson in this well, there arereasonable expectations of higher natural gas flow rates. With strong US naturalgas prices and short lead times to production, the economics are veryattractive. The last two wells at Padre Island have also provided valuable dataon how to continue a more effective exploration effort which hopefully may leadto improving operational results. Apart from the current testing phase at Wilson, Pantheon is set to be active forthe rest of 2007. A potential natural gas zone remains to be tested at PlumDeep. Further appraisal at Wilson is being considered. In addition, two wellsare scheduled on the company's Project Wharton acreage later this year. Laterthis summer Pantheon also expects to spud the first well on its new project,Nottoway Dome, located in Louisiana close to Baton Rouge. This structure has apotential for 35 mmboe in the Oligocene section and the company has a 7.5%working interest. In the event of success, this would also have a materialimpact on Pantheon." In accordance with the AIM Rules, the information in this report has beenreviewed and signed off by Mr Robert Rosenthal, (BSc Geology, MSc Geology),Technical Director at Pantheon Resources Plc who has over 30 years relevantexperience within the sector. Contacts: Pantheon Resources PlcSue Graham, Chairman +44 20 7379 0118 Oriel Securities LimitedScott Richardson Brown +44 20 7710 7600 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
2nd Mar 20217:00 amRNSOperational update, Talitha #A well
1st Mar 20217:00 amRNSForthcoming AGM and COVID precautions
15th Feb 20217:00 amRNSTalitha #A – Operations Update
12th Feb 202110:08 amRNSNotification of major holdings
10th Feb 20211:19 pmRNSNotification of major holdings
3rd Feb 20212:52 pmRNSConversion of Shares
28th Jan 20217:00 amRNSAnnual Grant of Share Options
27th Jan 20217:00 amRNSFinal Results for the Year Ended 30 June 2020
19th Jan 20217:01 amRNSAcquisition of remaining 10.8% WI in Talitha
14th Jan 20217:31 amRNSAcquisition of New Acreage
14th Jan 20217:24 amRNSDispute Update – East Texas
14th Jan 20217:18 amRNSSpudding of Talitha #A Well
30th Dec 20207:00 amRNSExtension of Reporting Deadline & Operating Update
30th Nov 20207:00 amRNSNotification of major hioldings
25th Nov 20207:00 amRNSContract for a Drilling Rig for Talitha #A well
20th Nov 20207:00 amRNSResult of Capital Raise
19th Nov 20205:08 pmRNSRetail Offer via PrimaryBid.com
19th Nov 20205:02 pmRNSProposed Placing and Subscription
17th Nov 20204:18 pmRNSNotification of major holdings
13th Nov 202010:42 amRNSFormal Approval of the Talitha Unit
3rd Nov 202012:23 pmRNSFormal Approval of the Alkaid Unit
22nd Oct 20207:00 amRNSChange of Advisor
13th Oct 20207:00 amRNSUpgraded management resource estimates – Kuparuk
25th Sep 20207:00 amRNSReceipt of Independent Resource Report – Talitha
7th Sep 20207:00 amRNSTalitha Production Unit & Operational Update
1st Sep 20208:35 amRNSAlkaid Production Unit & Operational Update
16th Jul 20204:40 pmRNSSecond Price Monitoring Extn
16th Jul 20204:35 pmRNSPrice Monitoring Extension
7th Jul 20207:00 amRNSIssuance of Share Options to Directors and staff
22nd Apr 20204:41 pmRNSSecond Price Monitoring Extn
22nd Apr 20204:35 pmRNSPrice Monitoring Extension
21st Apr 20207:00 amRNSImplementation of cost saving initiatives
2nd Apr 20204:36 pmRNSPrice Monitoring Extension
1st Apr 20204:41 pmRNSSecond Price Monitoring Extn
1st Apr 20204:36 pmRNSPrice Monitoring Extension
31st Mar 202012:08 pmRNSSecond Price Monitoring Extn
31st Mar 202012:03 pmRNSPrice Monitoring Extension
27th Mar 202012:07 pmRNSSecond Price Monitoring Extn
27th Mar 202012:02 pmRNSPrice Monitoring Extension
23rd Mar 20204:41 pmRNSSecond Price Monitoring Extn
23rd Mar 20204:38 pmRNSPrice Monitoring Extension
23rd Mar 20203:35 pmRNSUpgraded resource estimates & Company presentation
20th Mar 20204:30 pmRNSResult of AGM
20th Mar 202010:24 amRNSInterim Results for 6 months ended 31/12/2019
19th Mar 20209:19 amRNSUpdate on AGM & investor presentation
18th Mar 20204:43 pmRNSSecond Price Monitoring Extn
18th Mar 20204:38 pmRNSPrice Monitoring Extension
16th Mar 20204:41 pmRNSSecond Price Monitoring Extn
16th Mar 20204:36 pmRNSPrice Monitoring Extension
13th Mar 20202:56 pmRNSForthcoming AGM and Coronavirus precautions

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.