Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPanther Metals Regulatory News (PALM)

Share Price Information for Panther Metals (PALM)

Share Price is delayed by 15 minutes
Get Live Data
135.00    5.00 (3.85%)
Bid:
130.00
Ask:
140.00
Spread: 10.00 (7.692%)
Market Cap: £14.41m
PALM Live PriceLast checked at - London Stock Exchange

Intraday Panther Metals Share Chart

Obonga Project: Wishbone Drill Programme Update

Today 07:00

RNS Number : 7886L
Panther Metals PLC
10 July 2026
 

NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY IN OR INTO AUSTRALIA, CANADA, JAPAN, THE REPUBLIC OF SOUTH AFRICA, THE UNITED STATES OR ANY OTHER JURISDICTION WHERE TO DO SO WOULD CONSTITUTE A VIOLATION OF THE RELEVANT LAWS OF SUCH JURISDICTION

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF ARTICLE 7 OF REGULATION 2014/596/EU WHICH IS PART OF DOMESTIC UK LAW PURSUANT TO THE MARKET ABUSE (AMENDMENT) (EU EXIT) REGULATIONS (SI 2019/310) ("UK MAR"). UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION (AS DEFINED IN UK MAR) IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.

FOR IMMEDIATE RELEASE

PANTHER METALS PLC

("Panther" or the "Company")

(Incorporated in the Isle of Man with company number 009753V)

10 July 2026

Obonga Project: Wishbone Drill Programme Update

Panther Metals Plc (LSE: PALM), the exploration company focused on mineral projects in Canada, is pleased to provide an update in relation to the Phase 1 diamond drill programme at the Wishbone volcanogenic hosted massive sulphide ("VMS") prospect on the Company's Obonga Project located upon the Obonga Greenstone Belt, Ontario, Canada.

Further to the placing announced 18 June 2026 and the extension of the Obonga option agreement to 30 April 2027 (announced 6 July 2026), the Company's drilling contractor is commissioning a second diamond core drill rig in advance of it mobilising to the Obonga site from Manitoba. Once onsite the additional drilling capacity will accelerate exploration past the originally planned 2,000 metre drilling budget.

The first diamond core drill hole (BR26-WB-P1-1) at Wishbone, successfully attained the planned downhole depth of 300m, it intersected nine distinct zones of massive, semi-massive and iron-silicate dominated sulphide mineralisation commencing at a downhole depth of 77.75m to a downhole depth of 245m.

These intersections included 3.45m of pyrrhotite dominated massive sulphide and 9.9m of semi-massive sulphide from 77.75m downhole depth. Between 98m to 105m downhole depth, visual core logging has identified sulphide rich metasediments interpreted as greenalite exhalite rocks which may have formed when iron and silica rich hydrothermal fluids mixed with seawater in proximity to the ancient seafloor hydrothermal vents associated with VMS and precious metal mineralisation. These greenalites continued alternating in sulphide tenor from 112.5m to 119m with further pyrrhotite massive sulphide (137m to 139m) and semi-massive sulphide intervals (162m to 172m, 187.5m to 188m and 237m to 240m).

The second diamond core drill hole (BR26-WB-P1-2) at Wishbone, has intersected the target VMS horizons along strike to the south with a projected end of hole depth horizontal spacing between the inclined holes of circa 170m.

In BR26-WB-P1-2 alternating massive and semi-massive sulphide has been intersected between 63.5m and 78.4m downhole and between 107m and 120m downhole. Alternating sulphide rich metasediments interpreted as greenalite exhalite rocks and semi-massive sulphides continue from 120m to the currently logged core depth of 158m downhole.

A further two drill pads have been prepared ready to commence following a scheduled rig maintenance and a fifth drill pad will be ready in advance of the second drill rig arriving onsite.

 

Darren Hazelwood, Chief Executive Officer commented:

"The sulphide mineralisation observed in the first and second diamond drill holes of the current Wishbone drilling programme is particularly encouraging when viewed alongside the assay results from previous drilling at Wishbone, where we intersected 3.6 metres grading 3.9% zinc, including 2.0 metres at 6.8% zinc and 4.3 g/t silver, with individual assays returning up to 11.65% zinc.

Whilst the drill core has yet to be cut, sampled and laboratory assayed, the visual core logging of significant widths of sulphide mineralisation, which coincides with our three-dimensional geophysical inversion model, show we are building out a large-scale VMS system at Wishbone".

 

For further information, please contact:

Panther Metals PLC:

Darren Hazelwood, Chief Executive Officer:

+44 (0)1462 429 743

+44 (0)7971 957 685

 

Brokers:

Optiva Securities Limited

Christian Dennis

Mick McNamara

+44 (0)20 3137 1902

Hybridan LLP

Claire Louise Noyce

+44 (0)20 3764 2341

 

SI Capital Limited

Nick Emerson

+44 (0)1438 416 500

Obonga Project - Advancing a High-Impact VMS and Critical Minerals District

Panther Metals' Obonga Project in Ontario continues to demonstrate strong potential as a district-scale exploration opportunity targeting base and critical minerals. Since acquiring the Obonga Greenstone Belt in July 2021, the Company has advanced multiple high-priority targets including Wishbone, Awkward, Survey, Ottertooth, and Silver Rim.

On 9 February 2026 Panther announced plans for an approximately 2,000-metre diamond drilling program at the Wishbone Prospect, following the grant of an Exploration Permit in June 2024 valid through 2027. Previous work confirmed compelling VMS-style mineralisation, including 27.3m of massive sulphide and 51m of sulphide-dominated mineralisation across multiple lenses, supported by high-grade copper anomalies in lake sediments.

In July 2024, Panther secured an Exploration Permit for Awkward West, enabling up to 31 drill holes. Historic drilling returned 27.2m at 2.25% TGC, with zones exceeding 5% TGC, alongside indications of nickel, copper, and platinum group elements, aligning with the Company's critical minerals strategy.

High-resolution magnetic and electromagnetic surveys continue to refine drill targeting across Obonga. Survey and Ottertooth remain highly prospective, hosting multiple untested geophysical anomalies and historic massive sulphide intercepts.

 

Winston Project - Tailings Evaluation and MRE Pathway

Panther Metals' Winston Project represents a near-term, development-focused opportunity centred on the evaluation of historic mine tailings and has been the subject of prior technical and commercial assessment involving Extrakt.

Current work is focused on tailings sampling, metallurgical testing, and data validation to define metal content, recoverability, and support the preparation of a Mineral Resource Estimate (MRE). This approach provides a clear value-creation pathway with lower geological risk than greenfield exploration and aligns with modern reprocessing and critical mineral's themes.

Dotted Lake Project - Hemlo-Adjacent Polymetallic Opportunity

Panther Metals' Dotted Lake Project, acquired in July 2020, is located approximately 16km from Barrick Gold's Hemlo Mine, within a well-established mining region.

Early exploration identified multiple gold and base metal anomalies, with initial drilling confirming gold mineralisation. In early 2025, follow-up drilling materially advanced the project, confirming nickel and magnesium mineralisation within an ultramafic intrusion and identifying a VMS-style system, significantly expanding the project's polymetallic potential.

The program refined structural controls, extended mineralisation, and identified multiple new drill targets, positioning Dotted Lake as a high-upside, multi-commodity exploration asset.

 

Commercial Strategy - Focused Value Creation

Panther Metals is focused on disciplined, discovery-driven value creation through efficient capital deployment and technical execution. With Obonga delivering high-impact exploration, Winston providing a resource-focused development pathway, and Dotted Lake offering polymetallic upside, the Company maintains a balanced portfolio aligned with favourable commodity market conditions.

The Company's strategy is to advance high-quality assets along the most efficient technical pathway, delivering tangible milestones that underpin long-term shareholder value.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLDKLFBQDLEBBD
Date   Source Headline
10th Jul 20267:00 amRNSObonga Project: Wishbone Drill Programme Update
6th Jul 20267:00 amRNSObonga Extension and Issue of Equity
30th Jun 20267:35 amRNSHolding(s) in Company
26th Jun 202612:53 pmRNSHolding(s) in Company
26th Jun 202612:31 pmRNSHolding(s) in Company
26th Jun 202612:30 pmRNSHolding(s) in Company
23rd Jun 202611:53 amRNSResult of AGM
19th Jun 202612:36 pmRNSExercise of Warrants
18th Jun 20267:00 amRNSStrategic Placing
11th Jun 202611:12 amRNSHolding(s) in Company
11th Jun 20267:00 amRNS-RObonga Project: Diamond Drilling Programme Update
10th Jun 20266:27 pmRNSExercise of Warrants
2nd Jun 20267:00 amRNSObonga Project: Awkward Drill Programme Update
1st Jun 20266:22 pmRNSNotice of AGM
1st Jun 20269:46 amRNSExercise of Warrants
26th May 20267:00 amRNSObonga Project: Awkward Drilling Programme Starts
13th May 20267:00 amRNSWinston Tailings Project: Batch 6 Assay Results
11th May 20267:00 amRNSDrilling/Production Report
6th May 20267:00 amRNSObonga Update: Drill Pad Preparation
1st May 20261:30 pmRNSHolding(s) in Company
28th Apr 20267:00 amRNSWinston Tailings Project: Batch 4 Assay Results
20th Apr 20267:00 amRNSAnnual Report and Financial Statements
14th Apr 20267:00 amRNSWinston Tailings Project: Batch 3 Assay Results
2nd Apr 20267:00 amRNSBoard changes, issue of equity
31st Mar 20264:13 pmRNSResult of General Meeting
19th Mar 202610:02 amRNSWinston Tailings Project: Batch 2 Assay Results
17th Mar 20263:13 pmRNSWinston Tailings Project: Batch 1 Assay Results
17th Mar 20267:00 amRNSWinston Tailings Project: Batch 1 Assay Results
16th Mar 20267:00 amRNSWinston Tailings Project: Sample Collection
13th Mar 202611:44 amRNSNotice of General Meeting
27th Feb 20267:00 amRNSObonga Project: Wishbone VMS Update
23rd Feb 20267:00 amRNSDotted Lake Project: Magnesium Recovery Testwork
19th Feb 202611:35 amRNSHolding(s) in Company
19th Feb 20267:00 amRNSWinston Tailings: Traxys Letter of Interest Signed
18th Feb 202612:42 pmRNSHolding(s) in Company
17th Feb 20264:22 pmRNSHolding(s) in Company
17th Feb 20263:38 pmRNSHolding(s) in Company
17th Feb 20263:33 pmRNSHolding(s) in Company
13th Feb 202610:00 amRNSChange of auditor
13th Feb 20267:00 amRNSFiling of Initial CSE Prospectus
10th Feb 20267:00 amRNS-RWinston Tailings Update
9th Feb 20267:00 amRNSStrategic Fundraise
15th Jan 20267:00 amRNSObonga Project: 3 Year Option
7th Jan 20267:00 amRNS-RWinston Tailings Project - Appointment of Extrakt
24th Dec 20257:00 amRNS-R2025 Review of Year
15th Dec 20259:11 amRNSHolding(s) in Company
26th Nov 20257:00 amRNSDirector Appointment
20th Nov 20254:38 pmRNSHolding(s) in Company
20th Nov 20257:00 amRNS-RAppointment of drilling contractor
11th Nov 20253:12 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.