If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Peralonso Drilling Results

11 Mar 2013 07:00

RNS Number : 6405Z
Ormonde Mining PLC
11 March 2013
 



11 March 2013

Ormonde Mining plc

("Ormonde" or "the Company")

 

Further Drilling Results from Peralonso, Salamanca

 

The Board of Ormonde is pleased to report assay results from the final two holes of the second stage of drilling on the Peralonso Permit in the Salamanca Province of western Spain, which forms part of the joint venture with Aurum Mining plc.

 

A total of eight holes have been drilled to test for near-surface extensions to the gold mineralisation which had been identified by the first ever drilling on the permit carried out during 2012. The objective of the drilling was to test for near surface gold mineralisation. On 23 January 2013, Ormonde announced results from the first six holes, which indicated extensions at shallow depths of mineralised structures encountered in the original drilling. Results have now been received for the last two holes (PERDD010 and 011) of this eight hole programme, further confirming the presence of near-surface gold-bearing structures.

 

Highlights

·; Drill hole PERDD010 has returned a best interval of one metre grading 33.2 grams per tonne ("g/t") gold (from 92m depth).

·; Drilling to-date on the Prospect has identified near-surface, broad mineralised structures and higher grade intervals, with results including 10.1m grading 3.39g/t gold, 13.3m grading 2.59g/t gold, and 9.2m grading 2.09g/t gold.

·; Several structures are evidenced within a 400 x 400m gold-in-soil anomaly.

·; Recently reported prospecting work showed gold present in a significant number of float samples from an area of some 700m x 200m, centred approximately 1.2 kilometres east northeast (along strike) of the area of drilling at Peralonso. From a total of 23 samples of rock collected, 13 samples returned grades greater than 3g/t gold, with maximum values of 10.05g/t and 13.5g/t gold.

·; Work to-date suggests several gold-bearing structures in this area with considerable strike potential.

 

 

A map showing the locations of all drill holes can be viewed by clicking here and a cross-section can be accessed by clicking here.

 

 

Kerr Anderson, Ormonde's Managing Director, said:

 

"Drilling on the first target to be tested within the Peralonso Permit area has delivered good results and indicates that we are dealing with several near-surface mineralised structures. Additionally the recent prospecting work carried out approximately 1.2 kilometres east northeast of the drilling area, along the inferred strike extensions, returned very encouraging results. This suggests that the structures identified to date at Peralonso may have significant scale."

 

 

Detail

 

To date, eleven holes have been drilled at Peralonso for a total of 1,267 metres, the objective being to test for near surface gold mineralisation. The results from the initial three hole drill programme (PERDD001-3) were announced in July 2012, and the results from the first six holes (PERDD004-9) of the follow-up eight hole programme were announced in January 2013. The results of the last two holes (PERDD010-11) of this programme are covered in this release.

 

Drilling has tested the shallow depth extent of gold mineralisation encountered in previous trenching within an area where an extensive gold-in-soil geochemical anomaly (400 x 400m) had been identified. Results from all holes drilled to-date are reported in the table below. This drilling suggests that gold mineralisation is hosted within several steeply-dipping altered zones within granites, characterised by quartz veining and breccias which exhibit multiple phases of brecciation. Detailed structural interpretation and an assessment of the correlation of the mineralised structures identified by the two drilling campaigns are currently being carried out.

 

In addition, recent prospecting work (reported in February 2013) carried out approximately 1.2 kilometres ENE of the drilling area, along the inferred strike extensions, returned very encouraging results, suggesting that the structures identified to date at Peralonso may have significant scale.

 

Hole

Length (m)

Dip/Azimuth

From (m)

Thickness (m)

Gold (g/t)

PERDD001

126.1

-50o/288o

0

7.0

1.30

and

16.0

1.0

9.88

and

40.0

1.2

1.61

and

46.9

10.1

3.39

incl

46.9

1.1

22.7

and

78.0

1.0

0.89

and

110.7

13.3

2.59

incl

110.7

1.4

21.5

PERDD002

75.1

-50o/290o

8.9

5.8

1.14

PERDD003

75.2

-50o/290o

No significant mineralisation

PERDD004

100.0

-50o/290o

72.0

1.0

4.51

and

79.0

7.0

2.42

PERDD005

201.3

-50o/290o

32.0

1.0

0.89

and

68.0

1.0

0.88

and

75.0

6.0

1.87

and

99.8

9.2

2.09

and

150.0

1.0

0.82

and

164.0

1.0

2.68

and

171.0

2.0

1.24

PERDD006

125.5

-50o/290o

0.0

6.0

1.38

and

78.0

1.0

0.51

PERDD007

125.5

-50o/290o

49.0

2.0

10.18

PERDD008

89.5

-50o/290o

73.7

1.4

0.59

and

80.0

3.0

1.17

PERDD009

100.3

-50o/290o

40.0

18.0

0.70

and

63.0

1.0

0.52

New Assays

PERDD010

126.0

-50o/290o

31.0

3.0

1.59

and

56.0

1.0

0.56

and

92.0

1.0

33.2

and

110.0

6.0

0.69

PERDD011

123.0

-50o/293o

28.0

1.0

2.14

and

58.0

1.0

1.12

and

79.0

1.0

3.59

 

 

Significant Intercepts using a 0.5g/t cut (1m minimum width of intercept and 4m maximum internal dilution)

 

 

True thicknesses are currently interpreted to be around 70% of the drilled thickness (interval).

 

 

Notes to table:

 

Sampling, Assaying and Quality Control Measures

 

All drill core has been routinely logged by an experienced geologist. Relevant core intervals were split in half by diamond saw, with half being sent for assay and the other half being retained in the core boxes for reference. Sampling is mainly carried out over one metre intervals.

 

Sample preparation and analyses were performed at ALS Chemex (Spain). Assays are reported using Fire Assay and AAS on a 50g sample.  Reference samples (blanks, duplicates and certified standards) are routinely included in each sample batch as quality control measures. In addition check assays are performed on selected mineralised samples.

 

Kerr Anderson PhD EurGeolPGeo, Managing Director of Ormonde Mining plc, and a qualified person as defined in the Note for Mining, Oil and Gas Companies, June 2009, of the London Stock Exchange, has reviewed and approved the technical information contained in this announcement.

 

 

A glossary explaining technical terms contained in this announcement can be found at www.ormondemining.com/en/investors/technical_glossary.

 

For more information please visit www.ormondemining.com or follow Ormonde on Twitter https://twitter.com/ormondemining or Linkedin http://www.linkedin.com/company/ormondemining-plc

 

 

Enquiries to:

 

Ormonde Mining plc

Kerr Anderson, Managing Director Tel: +353 (0)1 8253570

 

Bankside Consultants

Simon Rothschild Tel: +44 (0)20 7367 8888 Mob: +44 (0)7703 167065

 

Murray Consultants

Ed Micheau Tel: +353 (0)1 4980300 Mob: +353 (0)86 803 7155

 

Davy (Nomad / ESM Adviser)

Eugenée Mulhern / Roland French Tel: +353 (0)1 6796363

 

 

ENDS

 

 

About Ormonde

Ormonde Mining Plc is admitted to trading on the AIM market in London & the ESM market in Dublin. Ormonde is a mineral development and exploration company focused on Spain (Ticker: ORM).

 

Ormonde's key activities include:

 

Barruecopardo Tungsten - Ormonde is developing a low cost mining operation at Barruecopardo to become a major, secure European supply of tungsten.

 

La Zarza Copper- polymetallic massive sulphide deposit in the prolific Iberian Pyrite Belt of southern Spain.

 

Gold Explorationin several highly prospective areas of western Spain which includes its joint venture agreement with Aurum Mining plc (AIM: AUR), where Ormonde currently has a 40% interest in the Pino de Oro project in the Zamora Province and a 46% interest in the Peralonso and Cabeza projects in Salamanca Province of western Spain. Ormonde is Manager of the Joint Venture.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFFDVFITIIV
Date   Source Headline
4th Jun 20202:50 pmRNSHolding(s) in Company
15th May 20207:00 amRNSBusiness Update, Salary Reductions, Options Grant
8th Apr 20207:00 amRNSFinal Results
30th Mar 20204:41 pmRNSSecond Price Monitoring Extn
30th Mar 20204:37 pmRNSPrice Monitoring Extension
30th Mar 202011:00 amRNSPrice Monitoring Extension
13th Mar 202011:15 amRNSHolding(s) in Company
9th Mar 20207:55 amRNSDirector/PDMR Shareholding
17th Feb 20207:00 amRNSCompletion of Disposal
13th Feb 20201:53 pmRNSEGM Results
10th Feb 20207:00 amRNSDirectorate Change
27th Jan 20204:39 pmRNSPublishing of Circular and Proposed Board Changes
10th Jan 20203:58 pmRNSHolding(s) in Company
8th Jan 20204:41 pmRNSSecond Price Monitoring Extn
8th Jan 20204:36 pmRNSPrice Monitoring Extension
8th Jan 20202:05 pmRNSSecond Price Monitoring Extn
8th Jan 20202:00 pmRNSPrice Monitoring Extension
8th Jan 202012:58 pmRNSProposed Disposal
27th Dec 201911:05 amRNSSecond Price Monitoring Extn
27th Dec 201911:00 amRNSPrice Monitoring Extension
25th Nov 20197:00 amRNSOperational Update
24th Oct 20193:15 pmRNSHolding(s) in Company
24th Oct 20193:14 pmRNSHolding(s) in Company
17th Oct 20197:00 amRNSSaloro Financing Update
30th Sep 20197:00 amRNSInterim Results
23rd Sep 20193:31 pmRNSResult of AGM
20th Sep 20197:00 amRNSBarruecopardo Tungsten Mine Update
27th Jun 20192:49 pmRNSAnnual Financial Report
19th Jun 20197:00 amRNSFinal Results
23rd May 20197:00 amRNSBarruecopardo Update
26th Feb 20197:00 amRNSBarruecopardo Project Update
14th Dec 20187:00 amRNSBarruecopardo Tungsten Project Update
11th Oct 20183:14 pmRNSChange of Registered Office
27th Sep 20183:53 pmRNSResult of AGM
27th Sep 20187:00 amRNSInterim Results for six months ended 30 June 2018
12th Sep 20187:00 amRNSBarruecopardo Tungsten Project Update
27th Jun 201812:19 pmRNSAnnual Financial Report
19th Jun 20187:00 amRNSFinal Results
17th Jan 201811:58 amRNSGranting of Options
28th Nov 20177:00 amRNSBarruecopardo Tungsten Mine Construction Update
6th Oct 20174:07 pmRNSHolding(s) in Company
28th Sep 20177:00 amRNSInterim Results 2017
18th Sep 20172:09 pmRNSResult of AGM
5th Sep 20177:00 amRNSBarruecopardo Tungsten Project
28th Jun 20177:00 amRNSPublication of Annual Report
20th Jun 20177:00 amRNSFinal Results for the year ended 31 December 2016
2nd Jun 20177:00 amRNSBarruecopardo Project Update
22nd Dec 201612:36 pmRNSBarruecopardo Tungsten Project
6th Oct 20166:04 pmRNSGranting of Options
30th Sep 20167:00 amRNSInterim Results 2016

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.