Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNyota Minerals Regulatory News (NYO)

  • There is currently no data for NYO

Tulu Kapi Proximal Exploration Update - Guji

10 Oct 2011 10:57

RNS Number : 8741P
Nyota Minerals Limited
10 October 2011
 



 

 

Nyota Minerals Limited ("Nyota" or the "Company")

Tulu Kapi Proximal Exploration Update - Guji Prospect

Highlights

·; Guji is the first prospect in the Tulu Kapi Proximal drill out programme to be "drill-ready";

·; Of two styles of gold mineralisation identified, the saprolite targets warrant further investigation, with peak grades intersected of 21.1g/t Au over 1.0m, 9.85g/t Au over 0.90m, 6.38g/t Au over 0.70m and 3.07g/t Au over 1.10m;

·; Saprolite ore offers a low-cost easily accessible additional potential feedstock for future Tulu Kapi plant;

·; Subject to final interpretation, a programme of close-spaced vertical reverse circulation drilling will be completed over the Guji Prospect; 

 

Richard Chase, Chief Executive Officer commented "The Guji Prospect meets the criteria of one of the three elements of Nyota's strategy, in that it is a potential near-term proximal target, offering additional low-cost easily accessible ore feed that can be quickly monetised.

Shareholders should expect to see further updates around the Proximal Target drill outs, aimed at defining additional resources to both extend mine life and provide alternative sources of feed during the upcoming exploration season which will extend through to June, 2012."

Exploration Programme

A total of 19 diamond drillholes have been completed at Guji since 2007. Holes have been drilled over both gold in soil geochemical anomalies and geophysical targets, with two styles of gold mineralisation being identified. Firstly, near-surface saprolite mineralisation, which Nyota will prioritise, and secondly, gold associated with both sulphide veins - disseminations and quartz veins in fresh rock at depth.

The saprolite mineralisation at Guji will be evaluated with priority on the basis that:

·; The possible saprolite resource is expected to be unconsolidated material that will require no drilling or blasting, ie free dig

·; saprolitic ore may require screening to remove clays and oversize material but is unlikely to require crushing or milling;

·; Guji is located less than 3km from the proposed future Tulu Kapi plant site;

·; Current total cost (load - haul - treatment) is estimated at US$17/t for ore;

A detailed review of all exploration data from the Guji Prospect has been undertaken as part of the on-going process of drill target prioritisation ahead of the next exploration season and has lead to the Prospect being prepared for further drilling.

The Company will undertake some additional trenching prior to a close-spaced drill programme aimed at defining a new saprolite resource. Preliminary interpretation suggests two possible discrete mineralised horizons within the saprolite profile and only by drilling will the Company establish whether these horizons have the necessary strike length continuity and grade to achieve conversion to a resource.

Drilling will be completed using a Reverse Circulation drill rig. Holes will be aligned vertically and will be drilled to the base of the saprolite. Drillhole spacing will be determined once the current interpretation is complete.

Saprolite (Soft rock) mineralisation

Saprolite is defined as a predominantly clay-rich red-brown or grey-white soft rock derived from the in-place chemical weathering of rock such that original structures may still be visible. At Guji, the saprolite extends to a maximum depth of 30 metres over an area of approximately 500 metres by 250 metres. The saprolite is variably mineralised with grades ranging from 0.50g/t Au to 21.10g/t Au.

Sulphide (hard rock) mineralisation

Within the hard rock, underlying the saprolite, gold mineralisation is associated with sulphides inachlorite-carbonate-sericite schist. The host rock is highly deformed and characterised by brecciation, shearing and folding. Sulphide mineralisation occurs as narrow sulphide veins, as disseminated mineralisation, in quartz veins and finally as late-stage filling in fractures. Gold mineralisation is either associated with sulphide veins or disseminated sulphides with grades typically ranging between 0.50 and 4.00g/t Au or associated with fracture filling and gold grades above 4.0g/t Au.

Drilling to date suggests that the Guji sulphide mineralisation is highly complex and a programme of oriented core drilling will be required before a model can be produced that would lead to and drilling of a resource. The sulphide potential at Guji is not considered a priority and will be investigated at some point in the future.

To view Figure 1: Borehole Collar Location Plan - Guji Prospect, please go to the following link:

http://www.rns-pdf.londonstockexchange.com/rns/8741P_-2011-10-10.pdf 

 

To view Table 1: Guji Drillhole Gold Intersections and Grades above 0.50g/t Au cut-off, please go to the following link:

 http://www.rns-pdf.londonstockexchange.com/rns/8741P_1-2011-10-10.pdf

The technical exploration and mining information contained in this Announcement has been reviewed

and approved by Mr D Hage Pr.Sci.Nat, Chief Geologist for Nyota Minerals Limited. Mr Hage has sufficient

experience which is relevant to the style of mineralisation and type of deposit under consideration and to

the activity to which he is undertaking to qualify as a qualified person under the AIM Note for Mining, Oil and Gas Companies. Mr Hage is an employee of Nyota Minerals Limited and is a Member of the South African Council for Natural and Scientific Professions (SACNASP). Mr Hage consents to the inclusion in this Announcement of such information in the form and context in which it appears.

 

For further information please contact:

 

Richard Chase (CEO)

Nyota Minerals Limited

+44 (0)20 7400 5740

info@nyotaminerals.com

 

NOMAD

Ambrian Partners Limited

+44 (0)20 7634 4858

 

BROKER

Guy Wilkes

Ocean Equities Limited

(+44) (0) 20 7786 4370

 

BROKER

Rory Scott

Mirabaud Securities LLP

(+44) (0)20 7878 3360

 

FINANCIAL PR

Paul Youens / Jos Simson

Tavistock Communications

(+44) (0)20 7920 3150

 

Or visit: http://www.nyotaminerals.com

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDKKDPCBDKQKD
Date   Source Headline
1st May 20137:00 amRNSNew Presentation and Strategic Review Update
29th Apr 20137:30 amRNSQuarterly Report
25th Apr 20137:01 amRNSPresenting at Master Investor investment show
23rd Apr 20134:40 pmRNSSecond Price Monitoring Extn
23rd Apr 20134:35 pmRNSPrice Monitoring Extension
9th Apr 20134:40 pmRNSSecond Price Monitoring Extn
9th Apr 20134:35 pmRNSPrice Monitoring Extension
8th Apr 201310:45 amRNSCompletion of Tranche 2 Placement
4th Apr 20133:45 pmRNSHolding in Company
4th Apr 201311:31 amRNSCLOSING OF SHARE PURCHASE PLAN
4th Apr 201311:30 amRNSResults of GM
28th Mar 20137:02 amRNSPresentation at Proactive Investors Forum
27th Mar 20138:45 amRNSChange of Director Interest
19th Mar 20138:45 amRNSRetirement of Directors
14th Mar 201311:45 amRNSHalf Year Results
6th Mar 20139:10 amRNSSPP Documentation
6th Mar 20139:02 amRNSHolding(s) in Company (Replacement)
5th Mar 20139:31 amRNSNOTICE OF MEETING OF SHAREHOLDERS
1st Mar 20139:00 amRNSHolding(s) in Company
28th Feb 20139:35 amRNSCompletion of Tranche 1 Placement
28th Feb 20139:30 amRNSHolding in Company
21st Feb 20138:16 amRNSPlacing of £4.0 million and Share Purchase Plan
31st Jan 201311:30 amRNSDecember Quarterly Report
21st Jan 20137:00 amRNSPositive Feeder Zone Drill Update & Trading Update
17th Jan 20137:00 amRNSEthiopian Ministry Confirms DFS Compliance
6th Dec 20127:00 amRNSDFS Demonstrates Potential for 105,000oz pa
3rd Dec 20127:00 amRNSFurther high-grade gold mineralisation identified
16th Nov 20127:00 amRNSResults of Annual General Meeting
31st Oct 201212:35 pmRNSQuarterly Report to 30/09/12 (Replacement)
31st Oct 201210:20 amRNSQuarterly Report period ended 30 September 2012
24th Oct 20124:35 pmRNSPrice Monitoring Extension
15th Oct 20127:00 amRNSNotice of AGM
9th Oct 20127:00 amRNSMineral Resource Update
28th Sep 20123:45 pmRNSFinal Results
28th Aug 20127:00 amRNSTulu Kapi Project Update
2nd Aug 201211:03 amRNSHolding(s) in Company
31st Jul 201211:40 amRNSQuarterly Report for the period ended 30 June 2012
27th Jul 20127:00 amRNSHolding in Company
12th Jul 20128:41 amRNSIFC Subscription Completed - Section 708A Notice
6th Jul 20121:44 pmRNSSubmission to the Ministry of Mines
25th Jun 20127:00 amRNSExploration Drilling Update
21st Jun 20127:00 amRNSAppointment of Non-Executive Director
21st Jun 20127:00 amRNSIFC Subscription to raise GBP1.3m
11th Jun 20127:06 amRNSDFS and Exploration Update
6th Jun 20129:12 amRNSHoldings in Company
16th May 20124:40 pmRNSSecond Price Monitoring Extn
16th May 20124:36 pmRNSPrice Monitoring Extension
8th May 20128:59 amRNSHoldings in Company
4th May 20122:48 pmRNSHoldings in Company
30th Apr 20127:00 amRNSQuarterly Report 31 March 2012

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.