The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMTR.L Regulatory News (MTR)

  • There is currently no data for MTR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Investment in Kalahari Metals Limited

6 Jun 2018 07:00

6 June 2018

Metal Tiger plc("Metal Tiger" or the "Company")

Investment in Kalahari Metals Limited

Metal Tiger is pleased to announce that it has signed a binding Investment Agreement (the “Agreement”) to acquire up to 50% of Botswanan focused explorer Kalahari Metals Limited (“KML”). KML is a privately owned company and holds interests in seven highly prospective exploration licences covering 4,063km2 in the Kalahari Copper Belt, consisting of two 100% owned exploration licences and five exploration licences subject to a binding earn-in agreement with Triprop Holdings (Pty) Limited (“Triprop”).

Highlights

Metal Tiger will have the right to acquire up to 50% of KML for a total consideration of US$1.6 million. Metal Tiger has exercised the First Option under the Agreement and is to be issued 18% of the enlarged share capital of KML for a total consideration of US$600,000. The 100% KML owned exploration licences are situated northeast along strike of the Cupric Canyon Capital (circa 50 km) and the MOD Resources Limited (MOD)/Metal Tiger JV projects (circa 170km). They cover 1,996 km2 and consist of a significant land holding over the prospective copper belt. KML have the right to earn-in to up to 80% of Triprop followed by a right to purchase the remaining 20% of Triprop at an independent valuation. Triprop hold 5 granted exploration licences arranged as two separate blocks of ground with a combined total area of 2,067 km2. Metal Tiger to appoint two non-executive directors to the board of KML. Licences cover the prospective D’Kar and Ngwako Pan Formations with favourable structural positions and are associated with major copper deposits in the region. Available datasets include high resolution airborne magnetic geophysics survey, soil geochemical sample data and results of 20-hole scout drilling with prospective intersections including 5.1m @ 0.69% Cu and 1.8m @ 1.80% Cu & 8.2g/t Ag. The deal gives Metal Tiger exposure to a further 4,063 km2 of largely unexplored ground, adjacent to significant recent discoveries in the highly prospective Kalahari Copper Belt. For more information on Kalahari Metals Limited please visit their website: www.kalaharimetals.com

Michael McNeilly, Chief Executive Officer of Metal Tiger plc, commented:

“The signing of this deal with Kalahari Metals Limited follows 3 months of substantial corporate and technical due diligence and is a further exciting milestone in Metal Tiger’s continuing involvement in a world class copper region in Botswana. Metal Tiger has had a long focus on the exploration of the region and through its close partnership with MOD Resources Limited and its involvement with the seminal T3 deposit discovery, is able to bring exceptional strategic and technical expertise to create an exciting new joint venture with the experienced operational team at KML. We look forward to updating shareholders in the near future with regards to KML’s proposed exploration plan. Based on our initial discussions, key focus will be to conduct geophysics and soil geochemical surveys to identify high priority targets for drilling as well as commence work on the environmental management plans (‘EMPs’) for areas likely to be of interest for drilling in the near term.

The Board of Metal Tiger greatly looks forward to working with its new partners at KML and holds great belief in the potential of the Kalahari Copper Belt to develop into a world class economic copper district”.

Agreement Structure and Commercial Terms

Under the terms of the Agreement, Metal Tiger will have the right to acquire up to 50% for a total consideration of US$1.6 million, via the following option structure: First Option: Metal Tiger to be issued new KML shares representing 18% of KML’s enlarged share capital in consideration for US$600,000 cash less £30,000 in new shares in Metal Tiger to be issued to the shareholders of Triprop (the “Triprop Shares”). This will result in the issue of 1,188,118 new shares in the Company which are expected to be admitted to trading to AIM on or around 12 June 2018. Second Option: Metal Tiger to be issued new shares in KML to increase total holding to 34% of KML’s enlarged share capital in consideration for US$500,000 cash within 6 months from the date of the exercise of the First Option. Third Option: Metal Tiger to be issued new shares in KML to increase total holding to 50% of KML’s enlarged share capital in consideration for US$500,000 cash within 6 months of the exercise of the Second Option. Metal Tiger has no obligation to continue with any subsequent payments following the First Option payment. Metal Tiger to appoint two non-executive directors to the board of KML.

Terms of KML’s earn-in with TripropKML have signed a binding earn-in agreement with Triprop (the “Earn-in”) under the following key terms:

Stage 1 Earn-in: KML to incur US$600,000 in respect of agreed work programmes and budgets within 1 year of the start date to be agreed by KML and Triprop, on completion of which, Triprop to issue new ordinary shares totalling 51% of its enlarged share capital; Metal Tiger to issue 1,188,118 new shares to the shareholders of Triprop. For the avoidance of doubt, these shares are the Triprop Shares to be issued as a condition of the signing of the Agreement and the exercise of the First Option to own 18% of the enlarged share capital of KML. Stage 2 Earn-in: KML to incur US$1,200,000 in respect of agreed work programmes and budgets within 1 year of the exercise of the second option by KML and Triprop, on completion of which, Triprop to issue new ordinary shares to bring KML’s total holding to 80% of the then enlarged share capital of Triprop. Triprop shareholders to receive either: New shares in Metal Tiger to the value of £60,000, valued at the mid-market closing price on the date prior to the announcement of the issue; or If KML is listed on a recognised investment exchange (including the AIM market of the London Stock Exchange, ASX or TSX), new shares in KML to the value of £50,000, valued at the mid-market closing price on the date prior to the announcement of the issue. Following completion of the Stage 2 Earn-in, Triprop shareholders will grant KML the option to acquire their outstanding shares based on independent valuation, to be satisfied in consideration for: New shares in Metal Tiger; or If KML is listed on a recognised investment exchange (including the AIM market of the London Stock Exchange, ASX or TSX), new shares in KML. KML to be appointed as operator of the Triprop licences. Upon completion of the Stage 1 Earn-in, KML and Triprop to enter into a joint venture agreement granting KML the right to appoint 2 of 4 directors to the Triprop Board, one of whom will be the chairman.

Summary of the Assets

Details of the seven exploration licences which are the focus of the KML joint venture are set out in Table 1 below. The concessions form two separate contiguous blocks of ground. Both licence blocks are at the early exploration stage, however they represent a significant land holding along strike of advanced and exploration-stage copper projects, including the JORC compliant Metal Tiger/MOD owned T3 Deposit (36.0Mt @ 1.14% Cu & 12.8g/t Ag) and the privately held Cupric Canyon Capital (“Cupric”) Boseto Project (177 Mt at 1.3% Cu), Zone 5 Deposit (100Mt @ 1.95% Cu & 20g/t Ag) and Banana Zone (191Mt @ 0.6% Cu) deposits.

Eastern Block (the Okavango Copper Project):

Licences: KML held PL148/2017 and PL149/2017 adjacent to Triprop held PL043/2012, PL042/2012 & PL041/2012. Location: Concessions are adjacent to those currently held by Cupric, 50km NE of Cupric Zone 5 Deposit (100.3Mt @ 1.95g/t Cu & 20g/t Ag); 170km NE of Metal Tiger/MOD T3 Deposit (36Mt @ 1.14% Cu & 12.8g/t Ag). Geology: covers the north-eastern continuation of the Kalahari Copper Belt (“KCB”) along the strike of the Ghanzi Ridge which consists the Neoproterozoic Ghanzi Group sediments which hosts the main known copper deposits in the Botswanan belt. Work completed: Orientation soil geochemical sampling. Scout drilling. Prospectivity: Magnetic geophysics data indicates that the target contact zone between the D’Kar and Ngwako Pan Formations extends into the block under cover and that favourable domal structural positions are present. In particular, the southern part of Licences PL148/2017 and PL149/2017 are located within the Central Structural Corridor (“CSC”) which extends SW through Metal Tiger/MOD JV Licences toward Namibia. The presence of later stage major dyke swarms trending NW-SE cross-cutting perpendicular to the CSC, introduces additional secondary structures and potential heat sources into the copper bearing formations.

Western Block (the Ngami Copper Project):

Licences: Triprop held PL035/2012 & PL036/2012. Location: covers the prospective ground along the northern edge of the KCB and abuts the MOD and Metal Tiger/MOD JV concessions. Circa 50km NW of T3 Deposit, 100 km SW of Boseto (177 Mt at 1.3% Cu) and 70 km west of Cupric’s Banana zone (191Mt @ 0.6% Cu). Geology: Inferred basement geology consists of D’Kar and Ngwako Formations and their contacts. Work Completed: High resolution airborne magnetics geophysics survey (11,693 line-km at 75m spacing) & interpretation. Orientation soil geochemical sampling (10,486 samples collected along profiles perpendicular to the D’Kar contact). Scout drilling (20 holes, 2,047m drilled). Prospectivity: Scout drilling confirmed the presence of the D’Kar and Ngwako Pan Formation contact zone and three holes intersected significant copper mineralisation above 0.5% Cu including 5.1m @ 0.69% Cu in hole TRDH14-11 and 1.8m @ 1.80% Cu & 8.2g/t Ag in hole TRDH14-16A (apparent thicknesses), see also Table 2 below. The stratigraphy, lithologies and mineralisation described in the drill hole logs are similar to those found in Metal Tiger/MOD neighbouring JV Licences.

Table 1: Details of Exploration Licences in the KML Joint Venture

Licence ID Holder

KMLEarn-in

Valid for Valid from Valid to

Duration(years)

LicenceArea(km”)

Work AreaBlock

PL148/2017 KML 100%

ProspectMetals

01-Jul-17 30-Jun-20 3 998 Eastern
PL149/2017 KML 100% 01-Jul-17 30-Jun-20 3 998
Sub-total: 1,996
PL035/2012 Triprop 100%

Base Metal,PreciousMetals &PGM's

01-Apr-18 31-Mar-20 2 756 Western
PL036/2012 Triprop 100% 01-Jan-18 31-Dec-19 2 252
PL041/2012 Triprop 100% 01-Apr-18 31-Mar-20 2 103 Eastern
PL042/2012 Triprop 100% 01-Apr-18 31-Mar-20 2 483
PL043/2012 Triprop 100% 01-Apr-18 31-Mar-20 2 473
Sub-total: 2,067
Total Area 4,063

Table 2: Key drilling intersections from Triprop 2014 scout drilling programme (Western Block) (Source: Remote Drilling Services database 2015)

Drill Hole ID

Depthfrom(m)

Interval(m)

Cu (%)>0.5% Cu

Ag(g/t)

Weighted Composites Mineralised Structure/Lithology
Width (m) Cu (%) Ag (g/t)
TRDH14-07 75.90 0.73 0.50 1.0 Fracture/Siltstone
77.45 0.53 0.60 1.0 Fracture/Siltstone
80.00 0.50 0.55 1.0 1.1 0.57 1.0 Fracture/Siltstone
80.50 0.61 0.59 1.0 Fracture/Siltstone
TRDH14-11 129.35 0.56 0.54 1.0 Mineralised Vein/ Siltstone
131.50 0.51 0.70 1.0 5.1 0.69 1.0 Carbonate Vein/ Mudstone
132.00 0.50 0.78 1.0 Carbonate Vein/ Mudstone
132.50 0.41 0.59 1.0 Carbonate Vein/ Mudstone
133.00 0.41 0.64 1.0 Carbonate Vein/ Mudstone
133.40 0.50 0.48 1.0 Carbonate Vein/ Mudstone
133.90 0.48 0.51 1.0 Carbonate Vein/ Mudstone
134.40 0.27 0.50 1.0 Carbonate Vein/ Mudstone
134.67 0.47 0.71 1.0 Carbonate Vein/ Siltstone
135.10 0.44 0.65 1.0 Fracture/ Siltstone
135.60 0.48 1.10 1.0 Veinlet- Fracture/ Siltstone
136.10 0.59 0.80 1.0 Veinlet-Fracture/ Siltstone
TRDH14-16A 117.60 0.54 1.22 7.3 Quartz Vein/ Sandstone
171.20 0.23 0.95 3.0 1.8 1.81 8.2 Quartz-Carbonate stringers/ Siltstone
171.60 0.66 1.47 7.1 Disseminated / A Sheared Limestone
172.20 0.39 0.52 7.6 Disseminated / Sheared Limestone
172.70 0.47 3.78 12.7 Quartz Vein/Sheared Limestone

Competent Person's Statement

The technical information contained in this disclosure has been read and approved by Mr Nick O'Reilly (MSc, DIC, MAusIMM, FGS), who is a qualified geologist who acts as the Competent Person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O'Reilly is a Principal consultant working for Mining Analyst Consulting Ltd which has been retained by Metal Tiger PLC to provide technical support.Following the issue of the 1,188,118 Triprop Shares, Metal Tiger has 1,110,431,438 issued shares.

For further information on the Company, visit: www.metaltigerplc.com:

Michael McNeilly (Chief Executive Officer) Tel: +44 (0)20 7099 0738
Keith Springall (Finance Director &

Company Secretary)

Tel: +44 (0)20 7099 0738
Stephen Allen or Bhavesh Patel RFC Ambrian Ltd

(Nominated Adviser)

Tel +44 (0)20 3440 6800
Charlie Cryer RFC Ambrian Ltd

(Joint Broker)

Tel +44 (0)20 3440 6800
Nick Emerson SI Capital (Joint Broker) Tel: +44 (0)1483 413 500
Gordon PooleJames Crothers Camarco(Financial PR) Tel: +44 (0)20 3757 4980

Notes to Editors:Metal Tiger plc is listed on the London Stock Exchange AIM Market (“AIM”) with the trading code MTR and invests in high potential mineral projects with a precious and strategic metals focus.

The Company’s target is to deliver a very high return for shareholders by investing in significantly undervalued and/or high potential opportunities in the mineral exploration and development sector timed to coincide, where possible, with a cyclical recovery in the exploration and mining markets. The Company’s key strategic objective is to ensure the distribution to shareholders of major returns achieved from disposals.

Metal Tiger’s Metal Projects Division is focused on the development of its key project interests in Botswana, Spain and Thailand. In Botswana, Metal Tiger has a growing interest in the large and highly prospective Kalahari copper/silver belt. In Spain, the Company has tungsten and gold interests in the highly-mineralised Extremadura region. In Thailand, Metal Tiger has interests in two potentially near-production stage silver/lead/zinc mines as well as licences, applications and critical historical data covering antimony, copper, gold, silver, lead and zinc opportunities.

The Company has access to a diverse pipeline of new opportunities focused on the natural resource sector including physical resource projects, new natural resource centred technologies and resource sector related fintech opportunities. Pipeline projects deemed commercially viable may be undertaken by Metal Tiger or by an AIM or NEX Exchange (formerly ISDX) partner with whom the Company is engaged.

View source version on businesswire.com: https://www.businesswire.com/news/home/20180605006811/en/

Copyright Business Wire 2018

Date   Source Headline
3rd Dec 20187:00 amBUSPurchase of interest in Greatland Gold plc
30th Nov 20187:00 amBUSThailand Permitting Process Update
30th Nov 20187:00 amBUSKalahari Metals Limited – Earn-in Agreement Doubles Exploration Landholding
28th Nov 20183:30 pmBUSExercise of Warrants in Thor Mining
21st Nov 20187:00 amBUSBotswana Copper Silver Project T23 Dome Shallow Copper Mineralisation Intersected
16th Nov 20187:00 amBUSCompletion of Sale of T3 Project
15th Nov 20187:00 amBUSBotswana Copper/Silver Project A1 Dome Drilling Results
15th Nov 20187:00 amBUSNotification of Major Holdings
1st Nov 20187:30 amBUSChange of Adviser
1st Nov 20187:00 amBUSSale of T3 Project and creation of New Exploration Joint Venture with MOD Resources
31st Oct 20187:00 amBUSKalahari Metals Limited Phase 1 Exploration & Investment Update
26th Oct 20187:00 amBUSBotswana Copper/Silver Project Licences Extended
16th Oct 20187:00 amRNSBotswana T3 Feasibility Study Update
9th Oct 20188:16 amBUSNOTIFICATION OF MAJOR HOLDINGS
4th Oct 20187:00 amBUSBotswana Copper Silver Project A4 Dome Intersection Update
1st Oct 20187:00 amBUSDirectorate change
27th Sep 20187:00 amBUSHalf-year Report
21st Sep 20187:00 amBUSNotification of Major Holdings
18th Sep 20187:00 amBUSHolding(s) in Company
16th Aug 20185:15 pmRNSHolding(s) in Company
3rd Aug 20184:40 pmRNSSecond Price Monitoring Extn
3rd Aug 20184:35 pmRNSPrice Monitoring Extension
23rd Jul 20189:59 amBUSOptions Grant
20th Jul 20187:00 amBUSExercise of Director’s Share Options & Issue of Bonus Shares
18th Jul 20187:00 amBUSSale of T3 Project and New Exploration JV
16th Jul 20187:00 amBUST3 Indicated Mineral Resource Increase
10th Jul 20187:00 amBUSStrategy/Company/Operations Update
9th Jul 20187:00 amBUSBotswana Copper/Silver Project A4 Dome Visible Copper
4th Jul 201812:31 pmBUSIssue of Equity
2nd Jul 20187:00 amBUST3 Resource Major Increase
2nd Jul 20187:00 amBUSDirectorate Change and Option Extension
28th Jun 201810:43 amBUSResult of AGM
27th Jun 20184:18 pmBUSDirectorate Change
27th Jun 20183:02 pmBUSIssue of Equity
12th Jun 20187:00 amBUSBotswana Copper/Silver Project Copper Confirmed at New A4 Dome Target
6th Jun 20187:00 amBUSInvestment in Kalahari Metals Limited
31st May 201811:17 amBUSAudited results for the year ended 31 December 2017
24th May 20187:06 amBUSBotswana Copper/Silver Project – T3 Drilling Update
15th May 20187:41 amBUSMetal Tiger Plc: Botswana Copper/Silver Project – Major Drilling Campaign Commences at T3 Dome
24th Apr 20189:56 amBUSIssue of Equity
16th Apr 20187:00 amBUSBotswana Copper/Silver Project EMP Submitted for Drilling T20 Dome
10th Apr 201811:50 amBUSAdditional Investment into MOD Resources Limited
3rd Apr 20187:00 amBUSBotswana Copper/Silver Project EMP Approval
26th Mar 20187:00 amBUSBotswana Copper/Silver Project T3 Drill Results Build Open Pit Expansion Potential
19th Mar 20187:07 amBUSMOD Resources Investment Update
15th Mar 201810:54 amBUSMOD Resources Investment Update
12th Mar 201810:16 amBUSAdditional Investment into MOD Resources Limited
1st Mar 20188:48 amBUSDirectorate Change
27th Feb 201810:20 amBUSInvestment in Connemara
26th Feb 20189:21 amBUSShare Issue and Directors’ Interest in Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.