Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMTR.L Regulatory News (MTR)

  • There is currently no data for MTR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Botswana T2 West: First RC Drill Assays

30 Aug 2016 08:09

Metal Tiger Plc

30 August 2016

Metal Tiger Plc

("Metal Tiger" or the "Company")

Botswana T2 West: First RC Drill Assays

Metal Tiger plc (LON:MTR) the London Stock Exchange AIM listed investor in strategic natural resource opportunities is pleased to provide an update with regard to regional exploration results at the Company’s Joint Venture (“JV”) project with partners MOD Resources (ASX:MOD) in the Kalahari Copper Belt in Botswana (70% MOD Resources / 30% Metal Tiger).

Details of Technical highlights in respect of the first batch of assay results from the reverse circulation drilling at the regional target T2 West are provided below. In addition, we would refer to the announcement released today by MOD Resources which contains images and diagrams that may assist readers in an understanding of the project and the exploration work being undertaken. This announcement can be viewed through the following link.

http://search.asx.com.au/s/search.html?query=mod&collection=asx-meta&profile=web

Paul Johnson Chief Executive Officer of Metal Tiger commented

“We are pleased to announce the first batch of laboratory assay results for reverse circulation drilling at T2 West, the first new drill target since we discovered the T3 deposit. Initial findings look promising with up to 5m @ 2.3% Cu and with intersections bearing a strong similarity to the widths and grades at MOD’s 100 % owned high-grade Mahumo (T1) copper/silver deposit, which lies only 3.5km to the east. Ongoing soil sampling between T2 West and Mahumo has also outlined a new anomaly, and drilling target, midway between T2 West and Mahumo.

At T3 the Resource drilling has now been completed with a total of 51 holes drilled ahead of the planned schedule. We commend MOD’s exploration manager, Jacques Janse van Rensburg, and his 80 strong Project team as well drill contractor Discovery Drilling for completing this phase of work in such a timely manner. We will report the remaining assay results and provide further updates on progress as the project moves towards the scheduled end of September completion date for the T3 maiden Resource Estimate.”

Highlights:

Reverse Circulation Drilling at T2 West

Assay results received for the first three reverse circulation (RC) drill holes, on the first drill section, at T2 West. This first drill section crosses the southern part of the T2 West soil anomaly, and consists of five RC holes all of which have intersected zones of visible vein and disseminated copper mineralisation. Drill holes MO-G-52R and MO-G-54R intersected a higher grade zone of copper/silver mineralisation associated with veining within a wider, lower grade, zone associated with disseminated copper mineralisation. MO-G-53R, the shallowest and most northerly drill hole on the first drill section, intersected highly weathered sediments hosting oxidised and copper leached mineralisation from a depth of 4m, resulting in a lower grade of 8m @ 0.3% Cu. Key downhole intersections include: MO-G-52R intersected 7m @ 1.7% Cu & 35g/t Ag from 61m, including 5m @ 2.3% Cu & 42g/t Ag from 61m MO-G-54R intersected 6m @ 1.7% Cu & 24g/t Ag from 61m MO-G-52R intersected a 24m wide zone of disseminated and vein hosted mineralisation from a downhole depth of 51m. With lower grade disseminated mineralisation (ranging from 0.1% to 0.5% Cu) surounding higher grade vein hosted copper (7m @ 1.7% Cu & 35g/t Ag) from 61m depth. MO-G-54R intersected a 28m wide zone of disseminated and vein hosted mineralisation from a downhole depth of 49m. With lower grade disseminated mineralisation (ranging from 0.1% to 0.7% Cu) surounding higher grade vein hosted copper (6m @ 1.7% Cu & 24g/t Ag) from 61m depth. The MO-G-52R and MO-G-54R drill hole mineralisation intersections compare well with the copper and silver grades and widths that MOD outlined during their Mahumo Stage One Resource drilling, 3.5km to the east. Here resource widths range 2-4m at an average 2.0% Cu and 50g/t Ag. Mahumo remains open below the current limit of drilling along a 2.4km strike length. Drilling is currently testing for continuity of mineralisation along strike from the first drill section and will then seek to target the mineralisation at depth in this complexly folded area. Assay results from the two remaining holes (MO-G-57 and MO-G-58R) on the first drill section at T2 West are currently awaited.

Geological Setting

T2 West is a soil anomaly (up to 87ppm Cu over a circa 1.5km wide zone) located 20km north of the T3 Resource Drilling area and 3.5km west of MOD’s 100% owned high-grade Mahumo (T1) copper/silver deposit (Resource: 2.68Mt @ 2.0% Cu & 50g/t Ag). It forms part of the T2 Prospect together with the T2 East soil anomaly (up to 83ppm Cu over a circa 1.5km wide zone) located approximately 12km to the east. There is no outcrop at T2 and the area is covered by surficial calcrete. T2 West, T2 East and Mahumo sit on the same regional structure and interpreted zone of Kalahari ‘prospective contact’ folding, that is thought to host Cupric Canyon Capital’s Zone 5 resource (Resource: 100Mt @ 1.95% Cu & 20g/t Ag).

Soil Sampling Results

Soil sampling results have been received from further geochemical survey on 500m spaced traverses extending eastwards from the T2 East anomaly, and from the T2 West anomaly, eastwards, towards MOD’S 100% owned Mahumo (T1) deposit. These latest soil results have yielded a new drill target, with a standout value of 99ppm Cu midway between T2 West and Mahumo.

T2 West Drilling Details

The T2 West RC holes, on the first drill section, are inclined 320° azimuth/-60° dip. MO-G-53R reached 55m, MO-G-52R reached 135m and MO-G-54R reached 103m. Hole collars are drilled at 50m spacing. MOD provide a full table of drill coordinates and key parameters in their release of today (see above link).

The first drill section, commenced on 10th August, crosses the southern part of the T2 West soil anomaly and consists a total of five RC holes all of which have intersected zones of vein and disseminated copper mineralisation, including the copper minerals chysocolla, malachite, chalcocite and bornite. Drilling is currently testing potential for mineralisation along strike to the east and west of the first section.

T3 Phase One Resource Programme Update

The Resource drilling at T3 has completed ahead of schedule, with a total of 51 diamond drill holes completed on a 100m by 100m grid within a 4-month period. All outstanding mineralised intersections are either in the laboratory or samples are being prepared for transport to the laboratory with the objective to get all assay results finalised for the resource estimate scheduled to be completed by end September. All 80 Project personnel will now take a well-earned break for 1 week.

The T3 scoping study is progressing to plan with preliminary results from metallurgical test work of different sulphide ores starting to be received. Results will be announced when results are finalised.

Project Location

The MOD/MTR joint venture Botswana Copper/Silver Project is located on the Kalahari Copper Belt in northern Botswana. The T3 Phase 1 Resource Drilling area is located approximately 70km NE of the project’s Tshimologo (T4) Prospect and is located parallel to the same structural trend known as the Mahumo Structural Corridor, that hosts MOD’s Mahumo Project (circa 20km NE of T3) and Cupric Capitals’ Banana Zone Deposit (60km NE) and Zone 5 Project (120km NE). The T2 Prospect is located directly along strike from the Mahumo Project and approximately 20km north of T3.

The exploration work is being managed on the ground, in accordance with JORC 2012 best practice, by MOD’s Competent Person, Mr Jacques Janse van Rensburg, BSc (Hons), General Manager Exploration (Africa).

The technical information contained in this disclosure has been read and approved by Mr Nick O'Reilly (MSc, DIC, MAusIMM, FGS), who is a qualified geologist who meets the criteria of a qualified person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O'Reilly has visited the T3 site and reviewed MOD’s drilling and sampling protocols and procedures. Mr O'Reilly is a consultant working for Mining Analyst Consulting Ltd which has been retained by Metal Tiger PLC to provide technical support.

For further information on the Company, visit: www.metaltigerplc.com:

Paul Johnson (Chief Executive Officer) Tel: +44 (0)7766 465 617
Terry Grammer (Non- Executive Chairman) Tel: +44 (0)207 099 0738
Sean Wyndham-Quin

Neil Baldwin

Nick Emerson

Andy Thacker

Spark Advisory Partners Limited

(Nominated Adviser)

SI Capital

(Sole Broker)

Tel: +44 (0) 2033 683 555

www.sparkadvisorypartners.com

Tel: +44 (0) 1483 413 500

Notes to Editors:

Metal Tiger plc is listed on the London Stock Exchange AIM Market (“AIM”) with the trading code MTR and invests in high potential mineral projects with a precious and strategic metals focus.

The Company’s target is to deliver a very high return for shareholders by investing in significantly undervalued and/or high potential opportunities in the mineral exploration and development sector timed to coincide, where possible, with a cyclical recovery in the exploration and mining markets. The Company’s key strategic objective is to ensure the distribution to shareholders of major returns achieved from disposals.

Metal Tiger’s Metal Projects Division is focused on the development of its key project interests in Botswana, Spain and Thailand. In Botswana Metal Tiger has a growing interest in the large and highly prospective Kalahari copper/silver belt. In Spain Metal Tiger the Company has tungsten and gold interests in the highly mineralised Extremadura region. In Thailand Metal Tiger has expanding interests over licences, applications and critical historical data covering antimony, copper, gold, silver, lead and zinc opportunities.

The Company has access to a diverse pipeline of new opportunities focused on the natural resource sector including physical resource projects, new natural resource centred technologies and resource sector related fintech opportunities. Pipeline projects deemed commercially viable may be undertaken by Metal Tiger or by an ISDX or AIM partner with whom the Company is engaged.

Metal Tiger also has an Asset Trading Division that holds various financial instruments for trading purposes including equities, warrants and royalty income. The aim of the division is to generate profits to reinvest into the Company’s project based activities.

View source version on businesswire.com: http://www.businesswire.com/news/home/20160830005479/en/

Copyright Business Wire 2016

Date   Source Headline
8th Nov 202210:06 amBUSTR-1: Standard form for notification of major holdings
25th Oct 20221:33 pmBUSCobre Limited - New Copper Zone Intersected at The Ngami Copper Project
20th Oct 202211:42 amBUSSandfire Update
20th Oct 202211:41 amBUSSouthern Gold widens South Korean exploration to include Copper, Lithium and Rare Earths
17th Oct 20228:32 amBUSSouthern Gold Update
7th Oct 20222:39 pmBUSDirector Dealing
30th Sep 20225:33 pmBUSSandfire Update
29th Sep 20221:30 pmBUSCobre Limited – Quarterly Activities Report
29th Sep 20221:10 pmBUSMargin Lending Facility Update
29th Sep 202210:18 amBUSCobre Limited – Partial Disposal of Shares
21st Sep 202211:36 amBUSCobre Limited – Ngami Copper Project assay results confirm significant copper mineralisation
13th Sep 202210:24 amBUSArmada Metals Limited - Interim Report for the Half Year Ended 30 June 2022
9th Sep 202211:59 amBUSCobre Limited – Drilling intersects further significant copper mineralisation, ngami copper project
2nd Sep 20221:25 pmBUSSouthern Gold Update
31st Aug 20227:00 amBUSUnaudited Interim Results for the six months ended 30 June 2022
30th Aug 20222:39 pmBUSSandfire Update
30th Aug 20222:31 pmBUSCobre Limited – Vertical Continuity of Copper Mineralisation confirmed at the Ngami Copper Project
18th Aug 20229:54 amBUSCobre Limited – Botswana Renewal Approved
16th Aug 202211:42 amBUSCobre Limited – Additional Significant Copper Intersection Extends Mineralisation a Further 1KM to The Northeast, Ngami Copper Project
9th Aug 202211:48 amBUSCobre Limited – Stage 1 Infill Diamond Drilling Commences
4th Aug 202210:39 amBUSPro-rata participation in Cobre Limited’s A$7 million fundraising
3rd Aug 20229:54 amBUSCobre Limited – Additional Copper Intersection at The Ngami Copper Project
1st Aug 202210:26 amBUSCobre Limited – Significant New Copper Intersection at The Ngami Copper Project
1st Aug 202210:25 amBUSArmada Metals Limited - Ground-Based Nsamt Survey Underway at The Nyanga Project
29th Jul 202211:10 amBUSSouthern Gold Limited – Quarterly Activities Report
29th Jul 202211:09 amBUSArmada Metals Limited – Quarterly Report
29th Jul 202211:08 amBUSMetal Tiger plc
28th Jul 202212:53 pmBUSMetal Tiger plc
27th Jul 20229:17 amBUSCobre Limited – Significant New Copper Intersection at The Ngami Copper Project
6th Jul 202211:01 amBUSCobre Limited – Commencement of Advanced Exploration Drilling at the Kalahari Copper Belt in Botswana
5th Jul 20229:21 amBUSCobre Limited – Board and Fee Structure Changes
4th Jul 20221:07 pmBUSKalahari Metals Limited – Appointment of CEO and New Exploration Team
4th Jul 20221:06 pmBUSArmada Metals Limited - Rock Sampling Confirms Magmatic Sulphide Potential Extends for Over 60km at the Nyanga Project
30th Jun 20229:18 amBUSSandfire - 147Mt Mineral Resource sets strong foundation for optimisation and long-term growth at MATSA
24th Jun 202211:06 amBUSSandfire Shareholding Update and Margin Lending Facility
21st Jun 202212:43 pmBUSSandfire Shareholding Update and Margin Lending Facility
21st Jun 20228:44 amBUSArmada Metals Limited – Diamond Drilling Intersects Magmatic Sulphides at The Nyanga Project
16th Jun 202210:11 amBUSDisposal of Interest in Kalahari Metals Limited - Replacement
16th Jun 20228:06 amBUSDisposal of Interest in Kalahari Metals Limited
16th May 202212:57 pmRNSResults of Annual General Meeting
10th May 20228:38 amBUSSouthern Gold – Appointment of CEO
3rd May 202211:03 amBUSSouthern Gold Update
29th Apr 202210:14 amBUSCobre – Publishing of Quarterly Activities Report
29th Apr 202210:12 amBUSArmada Metals Limited – Publishing of Quarterly Report
28th Apr 20229:54 amBUSSandfire Update
19th Apr 202210:13 amBUSPosting of Annual Report and Notice of AGM
19th Apr 20229:07 amBUSSouthern Gold Update
12th Apr 20227:11 amBUSKalahari Metals Ltd: Endurance Prospect Targets
6th Apr 20229:41 amBUSSandfire Update
31st Mar 20224:20 pmBUSAudited results for the year ended 31 December 2021

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.