The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMTR.L Regulatory News (MTR)

  • There is currently no data for MTR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Botswana Copper/Silver Project EMP Submitted for Drilling T20 Dome

16 Apr 2018 07:00

Metal Tiger Plc16 April 2018

Metal Tiger Plc("Metal Tiger" or the "Company")

Botswana Copper/Silver Project – EMP Submitted for Drilling T20 Dome

Metal Tiger plc (LON:MTR), the London Stock Exchange AIM listed investor in strategic natural resource opportunities, is pleased to provide an update regarding the Company’s Joint Venture (“JV”) project with partner MOD Resources Limited (ASX:MOD) (“MOD”) in the Kalahari Copper Belt in Botswana (70% MOD Resources/30% Metal Tiger).

Highlights:

Application lodged with Botswana Department of Environmental Affairs (DEA) for an Environmental Management Plan (EMP) for drilling within the circa 697km2 T20 Dome complex. T20 Dome EMP will allow the drilling of new and existing targets identified along a 140km long strike of the Central Structural Corridor. Additional 939km2 airborne electromagnetic (EM) geophysics survey coverage planned to commence in mid-2018, to link up the previous three EM trail survey blocks over the centre of the T20 Dome.

Michael McNeilly Chief Executive Officer of Metal Tiger commented:

“The submission of the EMP for the T20 Dome will, where awarded, provide access to important strategic ground for the JV and open up an additional 697km2 of under explored and prospective Kalahari copper belt for drilling. Opening the T20 Dome for drilling will allow the possibility of adding to a pipeline of confirmed copper targets whilst we move the T3 Resource through the mine feasibility study process. With the recently awarded T3 Dome EMP, drilling is planned to commence at the T3 Dome in May, and we look forward to the prospect of exciting drill intersections.”

This announcement coincides with an update released today by MOD which can be viewed through the following link:

http://search.asx.com.au/s/search.html?query=mod&collection=asx-meta&profile=web

T20 Dome Regional Exploration Planned Work & Targets

The T20 Dome EMP has been lodged for permission to test several new and existing targets along the Central Structural Corridor along the northern part of the T20 Dome complex. Approval of the T20 EMP will increase the total area available to drilling to approximately 1,377km2 (consisting the T3 Dome and T20 Dome). The JV operating company Tshukudu has executed Access Agreements with 28 farms to allow access for the required exploration operations. The planned extension of the airborne EM Geophysics survey coverage will extend geophysics data coverage over the centre of the T20 Dome and will facilitate the generation of new drilling targets and tie together the three-existing trial EM Survey blocks. T20 Dome drilling targets to include: T4, where reverse circulation (RC) drill hole MO-A-04R intersected 2m @ 6% Cu & 111g/t Ag from 101m depth, prior to the discovery of T3 in March 2016. T4 is located approximately 80km SWW of T3. Interpretation for the trial EM data covering this target, together with soil sampling data has identified the possibility of extensions to the known mineralisation. T23, a new target located 15km west of T4. A compelling target derived from the interpretation of airborne EM data and detailed magnetic data. It consists an interpreted rotated structural anomaly within the core of a larger dome structure. T23 is likely to be the first target to be drilled when the T20 Dome EMP is approved. The approval of the T3 Dome EMP was announced on 3 April 2018, with drilling expected to commence in May.

Background information on the T3 Project

The T3 Project is located on the Kalahari Copper Belt in northern Botswana and is part of the MOD/MTR joint venture Botswana Copper/Silver Project. T3 is located within the central part of the T3 Dome (approximately 1,000km2), which is the focus of rapidly increasing exploration activity undertaken by the JV. Two significant resources have been discovered to date within the T3 Dome: T1 (Mahumo deposit 100% MOD) and T3 (70% MOD / 30% MTR).

The T3 Deposit was discovered in March 2016 when a reverse circulation (“RC”) drill hole intersected 52m @ 2.0% Cu and 32g/t Ag from shallow depth. The maiden T3 JORC (2012) compliant Mineral Resource was announced on 26 September 2016 with the first Resource upgrade announced on 24 August 2017. The results of a Scoping Study for an open pit mine at T3 with a 2Mtpa processing plant, an indicative mine life of 10 years and an average production rate of 21,800tpa of copper and 665,000oz pa of silver was released on 6 December 2016. Work on a Pre-Feasibility Study (PFS) commenced in January 2017 and additional deeper copper mineralisation was discovered below the T3 Resource in February 2017.

The T3 Prospect geological data and exploration results have been reviewed and approved by Jacques Janse van Rensburg, BSc.(Hons), Business Development Manager and Competent Person for MOD Resources Ltd. Mineral Resource estimation and classification of the T3 Copper/Silver Project was conducted and approved by Mr A.I. Pretorius, MSc. Pri.Sci.Nat. an independent consultant to MOD Resources Ltd.

The Phase 2 drilling at the T3 Copper/Silver Deposit commenced on 7th August 2017, with approval granted for the recommencement of both diamond core (DC) and reverse circulation (RC) drilling at the T3 Project and its vicinity, through to December 2018. This includes up to 70 planned diamond core drill holes designed to infill the current Resource and test for possible extensions. The objective of the infill program is to increase geological confidence and upgrade categorisation of the T3 Resource. The programme also includes grid drilling to investigate the potential for an underground Resource down-dip and along strike from the planned open-pit, and to investigate geophysical targets. Drilling approval has been granted for the wider T3 Dome with the acceptance of the T3 Dome EMP announced on 3 April 2018.

The results of the T3 Open Pit Pre-Feasibility Study were announced on 31st January 2018.

The technical information contained in this disclosure has been read and approved by Mr Nick O'Reilly (MSc, DIC, MAusIMM, FGS), who is a qualified geologist who acts as the Competent Person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O'Reilly has visited the T3 site and reviewed MOD’s drilling and sampling protocols and procedures. Mr O'Reilly is a Principal consultant working for Mining Analyst Consulting Ltd which has been retained by Metal Tiger PLC to provide technical support.

In addition to its 30% interest in the JV, Metal Tiger holds 138,800,415 MOD shares, equivalent to 6.0197 % of MOD’s issued share capital and 1,541,667 MOD options each exercisable price of 6 cents (Australian) on or before 15 April 2019.

For further information on the Company, visit: www.metaltigerplc.com:

Michael McNeilly (Chief Executive Officer) Tel: +44(0)20 7099 0738
Keith Springall (Finance Director & Company Secretary) Tel: +44 (0)20 7099 0738
Stephen Allen or Bhavesh Patel RFC Ambrian Ltd

(Nominated Adviser)

Tel +44 (0)20 3440 6800
Jonathan Williams RFC Ambrian Ltd

(Joint Broker)

Tel +44 (0)20 3440 6800
Nick Emerson SI Capital

(Joint Broker)

Tel: +44 (0)1483 413 500
Rita Adiani NRG Tel: +44 (0)20 3709 4504

Gordon PooleJames Crothers

Camarco(Financial PR) Tel: +44 (0)20 3757 4980

Notes to Editors:

Metal Tiger plc is listed on the London Stock Exchange AIM Market (“AIM”) with the trading code MTR and invests in high potential mineral projects with a precious and strategic metals focus.

The Company’s target is to deliver a very high return for shareholders by investing in significantly undervalued and/or high potential opportunities in the mineral exploration and development sector timed to coincide, where possible, with a cyclical recovery in the exploration and mining markets. The Company’s key strategic objective is to ensure the distribution to shareholders of major returns achieved from disposals.

Metal Tiger’s Metal Projects Division is focused on the development of its key project interests in Botswana, Spain and Thailand. In Botswana, Metal Tiger has a growing interest in the large and highly prospective Kalahari copper/silver belt. In Spain, the Company has tungsten and gold interests in the highly-mineralised Extremadura region. In Thailand, Metal Tiger has interests in two potentially near-production stage silver/lead/zinc mines as well as licences, applications and critical historical data covering antimony, copper, gold, silver, lead and zinc opportunities.

The Company has access to a diverse pipeline of new opportunities focused on the natural resource sector including physical resource projects, new natural resource centred technologies and resource sector related fintech opportunities. Pipeline projects deemed commercially viable may be undertaken by Metal Tiger or by an AIM or NEX Exchange (formerly ISDX) partner with whom the Company is engaged.

View source version on businesswire.com: https://www.businesswire.com/news/home/20180415005141/en/

Copyright Business Wire 2018

Date   Source Headline
15th Feb 202112:31 pmBUSInvestment in Millennial Silver Corp.
15th Feb 202111:32 amBUSExercise of Warrants
11th Feb 20219:09 amRNSExercise of Warrants
29th Jan 20211:15 pmBUSReceipt of conditional approval for admission to the ASX
29th Jan 202110:27 amBUSSandfire Resources Update (ASX:SFR)
29th Jan 20219:52 amRNSHolding(s) in company
29th Jan 20219:32 amBUSCobre Update (ASX:CBE)
28th Jan 202111:22 amBUSSouthern Gold Update (ASX:SAU)
13th Jan 202111:53 amBUSExercise of Warrants
4th Jan 20217:00 amBUSInvestment in Southern Gold (ASX:SAU)
21st Dec 202010:00 amRNSInvestment in Catalyst Metals Limited
18th Dec 202010:56 amBUSApplication for admission to the ASX
15th Dec 202012:31 pmBUSKalahari Metals Limited: Project Update
15th Dec 20209:06 amBUSExecution of Share Purchase Agreement
14th Dec 20209:38 amBUSInvestment in Geopacific Resources Limited (ASX:GPR)
8th Dec 202011:38 amBUSCompletion of Sixth Financing Arrangement
4th Dec 20207:25 amBUSInvestment in Marimaca Copper Corp (TSXV:MARI)
1st Dec 20202:05 pmRNSSecond Price Monitoring Extn
1st Dec 20202:00 pmRNSPrice Monitoring Extension
1st Dec 202011:30 amBUSSandfire Resources Update - Material Progress Achieved in Botswana (ASX:SFR)
1st Dec 202011:06 amRNSSecond Price Monitoring Extn
1st Dec 202011:00 amRNSPrice Monitoring Extension
30th Nov 20209:12 amBUSSouthern Gold Update (ASX:SAU)
27th Nov 202011:10 amBUSSandfire Resources Update (ASX:SFR)
26th Nov 202010:04 amBUSSouthern Gold Update (ASX:SAU)
26th Nov 20209:59 amBUSCobre Update (ASX:CBE)
20th Nov 202010:07 amBUSCobre Update (ASX:CBE)
30th Oct 20207:58 amBUSCobre Update (ASX:CBE)
29th Oct 20204:53 pmBUSInvestment in Los Cerros Limited (ASX:LCL)
29th Oct 20209:34 amBUSSouthern Gold Update (ASX:SAU)
28th Oct 20209:24 amBUSSandfire Resources Update
23rd Oct 20208:40 amBUSInvestment in Predictive Discovery Limited
22nd Oct 20207:00 amBUSExtension to Heads of Agreement Between Cobre and KML
16th Oct 20207:00 amBUSChange of Registered Address
12th Oct 202012:40 pmBUSExercise of Warrants
8th Oct 202010:05 amBUSInvestment Update: Pan Asia Metals Limited
2nd Oct 20207:00 amBUSAdoption of New Option Scheme
1st Oct 20207:00 amBUSAppointment of Non-Executive Director
30th Sep 20207:00 amBUSUnaudited interim results for the six months ended 30 June 2020
28th Sep 202010:39 amBUSInvestment in Tanga Resources Limited
17th Sep 20209:02 amBUSCobre Limited - Update
15th Sep 20208:45 amRNSInvestment in Los Cerros
15th Sep 20207:05 amRNSParticipation in Thor Mining Placing
3rd Sep 20208:11 amBUSParticipation in Southern Gold’s Oversubscribed A$10.2 million Fundraise
1st Sep 20201:49 pmBUSAppointment of Chief Financial Officer
1st Sep 20208:06 amBUSPan Asia Metals – Further IPO investment commitment
1st Sep 20208:03 amBUSInvestment in Canyon Resources Limited (ASX:CAY)
27th Aug 20209:22 amBUSSandfire Resources Update (ASX: SFR)
27th Aug 20207:00 amBUSInvestment in Sable Resources Ltd. (TSXV:SAE)
24th Aug 202011:02 amBUSSouthern Gold Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.